DOC NCF IPI Homes For Iowa ? Phase II
ID: RFB923902-02
• State: Iowa
Opportunity Assistant
Loading
Description
Background
The Iowa Department of Administrative Services is issuing a solicitation for construction services related to the Homes For Iowa Phase II project at the Newton Correctional Facility. This project aims to enhance housing production capabilities through site demolition, exterior improvements, earthwork, and utility installation for an engineered post frame structure. Previous contracts have been awarded for HVAC, electrical, plumbing, and special construction aspects.
Work Details
The contractor will be responsible for site demolition, exterior improvements, earthwork, and utilities installation at the Newton Correctional Facility (NCF), Iowa Prison Industries (IPI), Homes For Iowa (HFI) Facility Production Site. Specific tasks include:
1. Site Demolition: Clearing existing structures and preparing the site for new construction.
2. Exterior Improvements: Enhancements to the building's exterior as per design specifications.
3. Earthwork: Grading and excavation work necessary for foundation and landscaping.
4. Utilities Installation: Connecting essential services such as water, sewer, and electricity to the new structure.
Period of Performance
Construction is anticipated to begin on October 20, 2025, and conclude by April 30, 2026.
Place of Performance
307 S 60th Ave W, Newton, Iowa 50208.
Bidder Requirements
Bidders must comply with all affirmative action/equal employment opportunity provisions of the State of Iowa and Federal Government. Bids must include a bid security amounting to 5% of the total bid amount. Bidders are required to be registered with the Iowa Labor Commissioner as a Contractor per Chapter 91C of the Code of Iowa.
The Iowa Department of Administrative Services is issuing a solicitation for construction services related to the Homes For Iowa Phase II project at the Newton Correctional Facility. This project aims to enhance housing production capabilities through site demolition, exterior improvements, earthwork, and utility installation for an engineered post frame structure. Previous contracts have been awarded for HVAC, electrical, plumbing, and special construction aspects.
Work Details
The contractor will be responsible for site demolition, exterior improvements, earthwork, and utilities installation at the Newton Correctional Facility (NCF), Iowa Prison Industries (IPI), Homes For Iowa (HFI) Facility Production Site. Specific tasks include:
1. Site Demolition: Clearing existing structures and preparing the site for new construction.
2. Exterior Improvements: Enhancements to the building's exterior as per design specifications.
3. Earthwork: Grading and excavation work necessary for foundation and landscaping.
4. Utilities Installation: Connecting essential services such as water, sewer, and electricity to the new structure.
Period of Performance
Construction is anticipated to begin on October 20, 2025, and conclude by April 30, 2026.
Place of Performance
307 S 60th Ave W, Newton, Iowa 50208.
Bidder Requirements
Bidders must comply with all affirmative action/equal employment opportunity provisions of the State of Iowa and Federal Government. Bids must include a bid security amounting to 5% of the total bid amount. Bidders are required to be registered with the Iowa Labor Commissioner as a Contractor per Chapter 91C of the Code of Iowa.
Loading Map
Loading Map
Overview
Opportunity ID
RFB923902-02
Response Deadline
Oct. 1, 2025
Past Due
Date Posted
Sept. 15, 2025
Source
Pre-Bid Conference
An optional Pre-Bid meeting (Virtual) will be held.
Est. Value Range
Experimental
$500,000 - $1,500,000
(AI estimate)
Agency Distribution
High
On 9/15/25 Administrative Services, Dept in Iowa issued DOC NCF IPI Homes For Iowa ? Phase II with ID RFB923902-02 due 10/1/25.
Contacts
Documents
Posted documents for DOC NCF IPI Homes For Iowa ? Phase II
Opportunity Assistant
AI Analysis
AI Generate