Dike Repairs, Harmon Lake WMA, Winnebago County
ID: 25-02-95-02
• State: Iowa
Opportunity Assistant
Loading
Description
Background
The Iowa Department of Natural Resources is issuing a contract for the repair of erosion and muskrat damage to two existing dikes at Harmon Lake Wildlife Management Area (WMA) in Winnebago County, Iowa.
The project aims to restore the integrity of these dikes to ensure the continued functionality of the area, which is vital for local wildlife and ecosystem management.
Work Details
The contractor will be responsible for repairing erosion and muskrat damage to two existing dikes. This includes stripping vegetation and placing compacted earthfill.
The work must adhere to the specifications outlined in the contract documents, including federal funding specifications and Iowa NRCS Technical Specifications. The contractor must furnish all materials, equipment, labor, insurance, and other necessary services to complete the project in a workmanlike manner.
Period of Performance
The work is expected to commence within a reasonable period after a preconstruction conference and must be completed by May 30, 2026.
Place of Performance
The contract will be performed at Harmon Lake WMA located in Winnebago County, Iowa.
Bidder Requirements
Bidders must comply with all applicable laws and regulations. They are required to submit a proposal electronically by October 2, 2025, at 3:00 PM.
A performance bond may be required if the contract price exceeds $25,000. Bidders must also provide proof of liability insurance with minimum coverage amounts specified in the contract.
The Iowa Department of Natural Resources is issuing a contract for the repair of erosion and muskrat damage to two existing dikes at Harmon Lake Wildlife Management Area (WMA) in Winnebago County, Iowa.
The project aims to restore the integrity of these dikes to ensure the continued functionality of the area, which is vital for local wildlife and ecosystem management.
Work Details
The contractor will be responsible for repairing erosion and muskrat damage to two existing dikes. This includes stripping vegetation and placing compacted earthfill.
The work must adhere to the specifications outlined in the contract documents, including federal funding specifications and Iowa NRCS Technical Specifications. The contractor must furnish all materials, equipment, labor, insurance, and other necessary services to complete the project in a workmanlike manner.
Period of Performance
The work is expected to commence within a reasonable period after a preconstruction conference and must be completed by May 30, 2026.
Place of Performance
The contract will be performed at Harmon Lake WMA located in Winnebago County, Iowa.
Bidder Requirements
Bidders must comply with all applicable laws and regulations. They are required to submit a proposal electronically by October 2, 2025, at 3:00 PM.
A performance bond may be required if the contract price exceeds $25,000. Bidders must also provide proof of liability insurance with minimum coverage amounts specified in the contract.
Loading Map
Loading Map
Overview
Opportunity ID
25-02-95-02
Response Deadline
Oct. 2, 2025
Past Due
Date Posted
Sept. 19, 2025
Source
Est. Value Range
Experimental
$100,000 - $500,000
(AI estimate)
Agency Distribution
High
On 9/19/25 Natural Resources, Dept Of in Iowa issued Dike Repairs, Harmon Lake WMA, Winnebago County with ID 25-02-95-02 due 10/2/25.
Contacts
Documents
Posted documents for Dike Repairs, Harmon Lake WMA, Winnebago County