Search Contract Opportunities

Pipe Culvert On Lumpkin Parkway

ID: 63950 LUMPKIN PE-63950-NONST-2025-000000016 • State: Georgia
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Summarize the work to be completed under this opportunity
Does this solicitation list any subcontracting requirements?
List any requirements necessary to complete this contract
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

The Lumpkin County Board of Commissioners is requesting sealed bids for the installation of 84 of 120 aluminized metal 10-gauge corrugated pipe in Cane Creek under Lumpkin County Parkway. Installation will include all items required for this installation including Traffic Control (Road Closure), Grading Complete, Erosion Control including Rip Rap head walls on both ends, and base and paving. All item necessary to complete this project will be paid on a lump sum basis.
Background
The Lumpkin County Board of Commissioners is seeking sealed bids for the installation of a 120-inch aluminized metal 10-gauge corrugated pipe in Cane Creek under Lumpkin County Parkway. This project is part of the TSPLOST Project #2025-009, aimed at improving local infrastructure and ensuring proper drainage.

Work Details
The contractor will be responsible for the installation of 84 feet of 120-inch aluminized metal 10-gauge corrugated pipe. The installation includes:

- Traffic Control: Road closure until project completion.
- Grading Complete: All items specified in GDOT standards.
- Erosion Control: Final grassing and other necessary items to control erosion.
- Rip Rap: Mixture of type 3 rip rap and surge stone for inlet and outlet headwalls.
- Backfill Material: Type II backfill under the pipe extending up to one-third of its height on each side, with remaining fill being crushed stone or compacted dirt.
- Paving: 8 inches of graded aggregate base (GAB) topped with 2 inches of 19mm asphalt and a final coat of 12.5mm asphalt over the disturbed area.

All work must comply with GDOT 2021 standard specifications. The total bid will be paid on a lump sum basis, covering all materials and labor required to complete the project.

Period of Performance
The contract must be completed within 90 calendar days from the issuance of the Notice to Proceed. Failure to complete the project within this timeframe will incur liquidated damages of $200 per day.

Place of Performance
The work will be performed at Cane Creek under Lumpkin County Parkway, Dahlonega, Georgia.

Bidder Requirements
Bidders must provide a bid bond equal to at least 5% of the total bid amount. Performance and payment bonds are required at 100% of the total contract price upon award. Bidders must comply with all state and federal laws, including maintaining a drug-free workplace and registering with E-Verify for employment eligibility verification.

Overview

Opportunity Type
Non-State Agency
Opportunity ID
63950 LUMPKIN PE-63950-NONST-2025-000000016
Response Deadline
Sept. 15, 2025 Due in 24 Days
Date Posted
Aug. 13, 2025
Est. Value Range
Experimental
$200,000 - $500,000 (AI estimate)
Agency Distribution
High
Source
On 8/13/25 LUMPKIN COUNTY BOARD OF COMMISSIONERS in Georgia issued Non-State Agency Pipe Culvert On Lumpkin Parkway with ID 63950 LUMPKIN PE-63950-NONST-2025-000000016 due 9/15/25.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Pipe Culvert On Lumpkin Parkway

Additional Details

Agency Site
Purchase Type
Non-State Agency

Similar Active Opportunities