NCWRF Finished Water Pump and Chemical Improvements
ID: 33100 COLUMBUS PE-33100-NONST-2024-000000003 • State: Georgia
Opportunity Assistant
Loading
Description
Background
The North Columbus Water Resource Facility Finished Water Pump and Chemical Improvements project, also known as Project No. 35774-87, is being undertaken by the Columbus Water Works in Columbus, Georgia. The project aims to enhance the finished water pumping and chemical feed systems at the facility.
Work Details
The project includes several specific improvements:
1. Replacing the existing 6,000 gpm NCPS Pump No. 1 with a new 9,000 gpm pump, motor, and electrical conduit and wiring.
2. Upgrading the electrical systems at the North Columbus Pump Station and High Service Pump Station as shown on the Drawings.
3. Replacement of existing chlorine gas system with new 12% bulk sodium hypochlorite feed system, including six fiberglass reinforced plastic (FRP) bulk storage tanks, three day tanks, and twelve chemical feed pumps.
4. Relocation of the existing PAC feed point to the new Raw Water Chemical Feed Vault, including extension of feed piping in the new chemical trench/ductbank, replacement of the eductor, and replacement of the water booster pump, within the existing PAC silo.
5. Replacement of the existing chlorine dioxide generation system with a new generation system, including replacement of the sulfuric acid tank, feed pumps, & water booster pump, within the existing Chemical Building.
6. Replacement of pretreatment chemical feed lines, including alum, PAC, chlorine dioxide, liquid lime, polymer,& pre-chlorine (sodium hypochlorite), with Schedule 80 PVC in a new concrete chemical trench or ductbank. All chlorine gas solution lines will be replaced as part of the conversion to sodium hypochlorite.
7. Replace or modify the ventilation equipment in the Chlorine Storage Building & the basement of the Operations Building as shown on drawings.
Period of Performance
The period of performance for this contract is until May 23, 2024.
Place of Performance
The construction work will take place at North Columbus Water Resource Facility in Columbus, Georgia.
The North Columbus Water Resource Facility Finished Water Pump and Chemical Improvements project, also known as Project No. 35774-87, is being undertaken by the Columbus Water Works in Columbus, Georgia. The project aims to enhance the finished water pumping and chemical feed systems at the facility.
Work Details
The project includes several specific improvements:
1. Replacing the existing 6,000 gpm NCPS Pump No. 1 with a new 9,000 gpm pump, motor, and electrical conduit and wiring.
2. Upgrading the electrical systems at the North Columbus Pump Station and High Service Pump Station as shown on the Drawings.
3. Replacement of existing chlorine gas system with new 12% bulk sodium hypochlorite feed system, including six fiberglass reinforced plastic (FRP) bulk storage tanks, three day tanks, and twelve chemical feed pumps.
4. Relocation of the existing PAC feed point to the new Raw Water Chemical Feed Vault, including extension of feed piping in the new chemical trench/ductbank, replacement of the eductor, and replacement of the water booster pump, within the existing PAC silo.
5. Replacement of the existing chlorine dioxide generation system with a new generation system, including replacement of the sulfuric acid tank, feed pumps, & water booster pump, within the existing Chemical Building.
6. Replacement of pretreatment chemical feed lines, including alum, PAC, chlorine dioxide, liquid lime, polymer,& pre-chlorine (sodium hypochlorite), with Schedule 80 PVC in a new concrete chemical trench or ductbank. All chlorine gas solution lines will be replaced as part of the conversion to sodium hypochlorite.
7. Replace or modify the ventilation equipment in the Chlorine Storage Building & the basement of the Operations Building as shown on drawings.
Period of Performance
The period of performance for this contract is until May 23, 2024.
Place of Performance
The construction work will take place at North Columbus Water Resource Facility in Columbus, Georgia.
Overview
Opportunity Type
Non-State Agency
Opportunity ID
33100 COLUMBUS PE-33100-NONST-2024-000000003
Version
1
Response Deadline
May 30, 2024
Past Due
Date Posted
April 29, 2024
Agency Distribution
High
Source
On 4/29/24 CHATSWORTH WATER WORKS COMMISSION in Georgia issued Non-State Agency NCWRF Finished Water Pump and Chemical Improvements with ID 33100 COLUMBUS PE-33100-NONST-2024-000000003 due 5/30/24.
Contacts
Documents
Posted documents for NCWRF Finished Water Pump and Chemical Improvements
Opportunity Assistant
AI Analysis
AI Generate
Classifications
Opportunity Classification
Construction / Public Works
NAICS
Additional Details
Agency Site
Purchase Type
Non-State Agency