Natural Gas-Powered Standby Generator
ID: 26-REQ-115 • State: Georgia
Opportunity Assistant
Loading
Description
Background
Effingham County is seeking to replace an existing 800 kW diesel generator with a new 800 kW natural gas generator at the Water Wastewater Treatment Plant. This initiative is part of the county's efforts to upgrade its infrastructure and ensure reliable power supply for essential services.
Work Details
The contractor will be responsible for the following tasks:
1. Demolition of existing wiring associated with the current diesel generator.
2. Relocation of the existing generator on-site.
3. Installation of the new 800 kW natural gas generator, which must meet the following specifications:
- Standby rated at 800 kW
- Voltage: 277/480 volts, 3 phase
- Automatic transfer switch included
- Weather protective enclosure and coolant heater required
- Must be a new/never titled Cummins, Caterpillar, or an approved equal brand
- Include startup fees, batteries, and a 2-hour load bank test
- Minimum warranty of 5 years on the generator.
4. Running a gas line to the meter location.
5. Submission of technical data for the proposed generator and appurtenances, including engine specifications and certifications (UL, EPA).
Period of Performance
The contract will commence upon acceptance of the proposal and is expected to be completed within a specified timeframe as agreed upon in the contract documents.
Place of Performance
Effingham County, specifically at the Water Wastewater Treatment Plant located in Springfield, GA.
Bidder Requirements
Bidders must comply with all local laws and regulations, including obtaining necessary licenses and permits. They must also provide proof of insurance coverage as specified in the solicitation documents. Additionally, bidders are required to submit a Drug-Free Workplace Certification and a Promise of Non-Discrimination Statement.
Effingham County is seeking to replace an existing 800 kW diesel generator with a new 800 kW natural gas generator at the Water Wastewater Treatment Plant. This initiative is part of the county's efforts to upgrade its infrastructure and ensure reliable power supply for essential services.
Work Details
The contractor will be responsible for the following tasks:
1. Demolition of existing wiring associated with the current diesel generator.
2. Relocation of the existing generator on-site.
3. Installation of the new 800 kW natural gas generator, which must meet the following specifications:
- Standby rated at 800 kW
- Voltage: 277/480 volts, 3 phase
- Automatic transfer switch included
- Weather protective enclosure and coolant heater required
- Must be a new/never titled Cummins, Caterpillar, or an approved equal brand
- Include startup fees, batteries, and a 2-hour load bank test
- Minimum warranty of 5 years on the generator.
4. Running a gas line to the meter location.
5. Submission of technical data for the proposed generator and appurtenances, including engine specifications and certifications (UL, EPA).
Period of Performance
The contract will commence upon acceptance of the proposal and is expected to be completed within a specified timeframe as agreed upon in the contract documents.
Place of Performance
Effingham County, specifically at the Water Wastewater Treatment Plant located in Springfield, GA.
Bidder Requirements
Bidders must comply with all local laws and regulations, including obtaining necessary licenses and permits. They must also provide proof of insurance coverage as specified in the solicitation documents. Additionally, bidders are required to submit a Drug-Free Workplace Certification and a Promise of Non-Discrimination Statement.
Loading Map
Loading Map
Overview
Agency
Opportunity ID
26-REQ-115
Response Deadline
May 22, 2026
Due in 14 Days
Date Posted
May 6, 2026
Est. Value Range
Experimental
$650,000 - $1,400,000
(AI estimate)
Agency Distribution
Moderate
Source
On 5/6/26 Effingham County in Georgia issued Natural Gas-Powered Standby Generator with ID 26-REQ-115 due 5/22/26.
Contacts
Documents
Posted documents for Natural Gas-Powered Standby Generator
Opportunity Assistant
AI Analysis
AI Generate