Hickory Log Creek Intake Gate Vault Improvements Project

ID: 66365 COBB PE-66365-NONST-2025-000000021 • State: Georgia

Description

The Project will result in raising the existing vault structure 2-feet above 100-year base flood elevation (BFE) to eliminate the potential for sediment and debris entering the system during flood events at the Hickory Log Creek Pumping Station. Raising the gate stems and equipping the existing 30-inch intake slide gates located at the vault with electric actuators with remote control. The project includes mobilization, access inside the gate vault and pump station, concrete and brick masonry construction, installation of new electric actuators, replacement of existing gate stems, electrical improvements, and installation of new ladders, stairs, railing, security gate, and hatches. A condition assessment of the four (4) existing gates and frames is included in the Work along with the responsibilities of dewatering and flood protection for the existing intake gate vault during construction.
Background
The Hickory Log Creek Intake Gate Vault Improvements Project is issued by the Cobb County-Marietta Water Authority. It aims to enhance the flood resilience of the Hickory Log Creek Pumping Station. The project focuses on raising the existing vault structure to mitigate sediment and debris intrusion during flood events, thereby ensuring the integrity of the water system.

Work Details
The project involves several key tasks:

- Raising the existing vault structure by 2 feet above the 100-year base flood elevation (BFE).
- Installation of electric actuators with remote control for the existing 30-inch intake slide gates.
- Mobilization and access inside the gate vault and pump station.
- Concrete and brick masonry construction.
- Replacement of existing gate stems.
- Electrical improvements.
- Installation of new ladders, stairs, railings, security gates, and hatches.

Additionally, a condition assessment of four existing gates and frames will be conducted. The contractor will also be responsible for dewatering and flood protection measures during construction.

Period of Performance
The time allowed for Final Completion and readiness for final payment is 250 consecutive calendar days from the date of commencement.

Place of Performance
The contract will be performed at the Hickory Log Creek Pumping Station located at 1250 Riverstone Pkwy, Canton, Georgia 30114.

Overview

Opportunity Type
Non-State Agency
Opportunity ID
66365 COBB PE-66365-NONST-2025-000000021
Response Deadline
Feb. 21, 2025 Past Due
Date Posted
Jan. 17, 2025
Est. Value Range
Experimental
$500,000 - $1,500,000 (AI estimate)
Agency Distribution
High
Source
On 1/17/25 COBB COUNTY-MARIETTA WATER AUTHORITY in Georgia issued Non-State Agency Hickory Log Creek Intake Gate Vault Improvements Project with ID 66365 COBB PE-66365-NONST-2025-000000021 due 2/21/25.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Hickory Log Creek Intake Gate Vault Improvements Project

Additional Details

Purchase Type
Non-State Agency

Similar Active Opportunities