25-002 TS172 Brandon Mill Road Sidewalk

ID: 66098 SANDY PE-66098-NONST-2025-000000051 • State: Georgia
Real Time Relevant State, Local, and Education Bids from all 50 States
Find Now

Description

This project includes the construction of sidewalk on Brandon Mill Road between Brandon Ridge Drive and Lost Forest Drive. The project will realign a portion of Brandon Mill Road approximately 4-feet to the north of existing. The improvements will include approximately 1,775 LF of sidewalk, drainage system which includes but is not limited to 637 LF 18 RCP, two (2) parapet walls, and other associated improvements. The scope of work also includes pavement widening and various pavement markings and signage. The project is to be funded through the Sandy Springs TSPLOST funding.
Background
The project involves the construction of a sidewalk on Brandon Mill Road between Brandon Ridge Drive and Lost Forest Drive. The improvements will include realigning a portion of Brandon Mill Road approximately 4-feet to the north of existing, approximately 1,775 LF of sidewalk, drainage system including 637 LF 18” RCP, two (2) parapet walls, pavement widening, and various pavement markings and signage.
The project is to be funded through the Sandy Springs TSPLOST funding.

Work Details
The scope of work includes the construction of sidewalk, drainage system, parapet walls, pavement widening, and pavement markings. The project will be constructed under an NPDES GAR100002 permit and a Georgia Department of Transportation Encroachment permit.
The Contractor must perform at least 51% of work and must be a pre-qualified Prime Contractor listed by the Georgia Department of Transportation. All work performed shall be in accordance with the Georgia Department of Transportation Standard Specifications, Construction of Transportation Systems (current edition).

Period of Performance
BID DUE DATE & OPENING: August 9, 2024, 2:00 PM EST.
NON-MANDATORY PRE-BID CONFERENCE ATTENDANCE: July 19, 2024, 10:00 AM EST.
QUESTIONS DUE: July 26, 2024, 5:00 P.M.

Place of Performance
The project will be performed on Brandon Mill Road between Brandon Ridge Drive and Lost Forest Drive in Sandy Springs, Georgia.

Overview

Opportunity Type
Non-State Agency
Opportunity ID
66098 SANDY PE-66098-NONST-2025-000000051
Response Deadline
Aug. 9, 2024 Past Due
Date Posted
July 10, 2024
Est. Value Range
Experimental
$500,000 - $1,000,000 (AI estimate)
Agency Distribution
High
Source
On 7/10/24 SANDY SPRINGS, CITY OF in Georgia issued Non-State Agency 25-002 TS172 Brandon Mill Road Sidewalk with ID 66098 SANDY PE-66098-NONST-2025-000000051 due 8/9/24.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for 25-002 TS172 Brandon Mill Road Sidewalk

Additional Details

Agency Site
Purchase Type
Non-State Agency

Similar Active Opportunities