Search Contract Opportunities

2024 CU WPCD Entrance Sign

ID: 66895 CUMMING, PE-66895-NONST-2024-000000021 • State: Georgia
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Summarize the work to be completed under this opportunity
Does this solicitation list any subcontracting requirements?
List any requirements necessary to complete this contract
I'd like to anonymously submit a question to the procurement officer(s)
Loading
Get Real Time Alerts from 40k+ Federal, State and Local Agencies
Find Now

Description

The Cumming Utilities Water Pollution Control Division is requesting proposals from qualified companies for the Construction of a Rock, Stone, and Wood Entrance Sign. Sign will be located at the Entrance of the City of Cumming's Wastewater Treatment Plant. Proposals should be typed or submitted in ink and delivered to the 2nd Floor receptionist desk in a sealed envelope marked on the outside with CU WPCD Entrance Sign or mailed to Cumming City Hall, 100 Main Street, Cumming, GA 30040. Proposals will be received until October 31st, 2024 at 4 p.m. Proposals received after this date and time will not be accepted. Questions should be addressed to Jimmy Andrews, Superintend, via e-mail at jimmyandrews@cityofcumming.net or 770-781-2008. The City of Cumming Street Department reserves the right to waive irregularities and reject any or all proposals.
Background
The Cumming Utilities Water Pollution Control Division is seeking proposals from qualified companies for the construction of a Rock, Stone, and Wood Entrance Sign at the entrance of the City of Cumming's Wastewater Treatment Plant.

This project aims to enhance the aesthetic appeal of the facility while providing clear identification.

Work Details
The scope of work includes:

1. Site Preparation: Conducting a site survey, clearing debris, and marking boundaries for installation.

2. Foundation Construction: Excavating for the foundation and pouring concrete to create a stable base.

3. Rock Structure Assembly: Sourcing rock materials, constructing the rock structure per design specifications, and securing with adhesives or mortar.

4. Wood Frame and Signage Installation: Preparing wood materials, assembling the frame, attaching it to the rock structure, and installing signage using weather-resistant fasteners.

5. Finishing Touches: Applying sealants or protective coatings, conducting inspections, and cleaning the site.

Materials required include natural or manufactured stone, weather-resistant treated wood, concrete for the foundation, sealants, fasteners, and adherence to design specifications including dimensions and color schemes.

Period of Performance
The contract work is expected to be completed by October 31st, 2024.

Place of Performance
The construction will take place at the entrance of the City of Cumming's Wastewater Treatment Plant located in Cumming, GA.

Overview

Opportunity Type
Non-State Agency
Opportunity ID
66895 CUMMING, PE-66895-NONST-2024-000000021
Response Deadline
Oct. 31, 2024 Past Due
Date Posted
Oct. 2, 2024
Est. Value Range
Experimental
$10,000 - $50,000 (AI estimate)
Agency Distribution
High
Source
On 10/2/24 CUMMING, CITY OF in Georgia issued Non-State Agency 2024 CU WPCD Entrance Sign with ID 66895 CUMMING, PE-66895-NONST-2024-000000021 due 10/31/24.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for 2024 CU WPCD Entrance Sign

Additional Details

Agency Site
Purchase Type
Non-State Agency

Similar Active Opportunities