Description

Scope of Work:
The contract work involves the comprehensive rehabilitation, marking, and lighting of Taxiway Alpha at Kissimmee Gateway Airport, as well as correcting the runway-to-taxiway offset from 350' to 400' to comply with FAA standards. The project extends the full length of Taxiway Alpha, from Runway 15 North to the end of Runway 33. Key tasks include:
  • Correcting geometry issues at crossing taxiways, including fillet improvements and establishing the required 90-degree centerline entrance to Runway 15-33.
  • Replacing existing lighting and signage with new cable in conduit and LED fixtures, due to both the shift of the taxiway 50' east and issues with direct buried cabling.
  • Demolishing existing pavement, milling, reclaiming/rotomixing, and constructing new pavement structures with P-401 asphalt surface and leveling courses, new base and subbase, and stabilized shoulders.
  • Constructing a new P501 concrete compass calibration pad.
  • Installing storm drainage pipe culverts and inlet/control structures, performing grading, airfield marking, fencing, turfing, lighting, signage, vault work, and ALCS modifications.

Requesting Entity:
This solicitation is issued for Kissimmee Gateway Airport.

Background:
The project addresses the low PCI value (54 overall) of Taxiway Alpha and the non-conformance of its geometry and centerline offset separation from the primary runway with the latest FAA Advisory Circular (AC) guidance and standards. The improvements are necessary to meet current FAA/FDOT standards and ensure safe, efficient airport operations.

Contract Requirements:
All work must be performed in accordance with applicable codes, FAA and FDOT standards, and within the available project budget. The contract documents include the project manual, construction plans, and all referenced standards, specifications, and requirements. The project may be divided into multiple bid schedules.

Submission Instructions:
Bidders must refer to the contract documents for detailed submission requirements and ensure compliance with all referenced standards and specifications.
Loading Map
Loading Map

Overview

Opportunity ID
RFP2026014
Response Deadline
June 2, 2026 Due in 0 Days
Date Posted
May 3, 2026
Source
Source Notes
Source does not have a linkable page for this opportunity. To find the opportunity, go to the Source website listed above and search for the Opportunity ID.

Est. Value Range
Experimental
$5,000,000 - $15,000,000 (AI estimate)
Agency Distribution
Low
On 5/3/26 City of Kissimmee in Florida issued Rehabilitate And Shift Taxiway A Phases 1 And 2 At Kissimmee Gateway Airport with ID RFP2026014 due 6/2/26.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Subscribe to search 5M+ historical and active solicitation documents

Free Trial Schedule Demo

Opportunity Assistant


Analyst Requests

AI Analysis

Similar Active Opportunities