Progressive Design Build - Water Recycling Facility at Pollard Road

ID: RFSQ-08193 • State: Florida

Description

This Request for Qualifications (RFQ) for the progressive design build of Winter Haven's Water Recycling Facility at Pollard Road and the abandonment of the existing Wastewater Treatment Plant #2 (Project) invites Proposalsaccording to the requirements set forth in this RFQ. The Proposalswill be reviewed and evaluated using a best-value selection process describedin this RFQ. At completion of the evaluation process, the City of Winter Haven (Owner) will select a Proposer for award and enter negotiations of the Progressive Design Build (PDB) Contract. The Project is to be designed, permitted and constructed in multiple phases using the design-build project delivery method over a period of approximately ten (10) years.

Background
This Request for Qualifications (RFQ) is for the progressive design build of Winter Haven’s Water Recycling Facility at Pollard Road and the abandonment of the existing Wastewater Treatment Plant #2. The project is to be designed, permitted, and constructed in multiple phases using the design-build project delivery method over a period of approximately ten (10) years. The services provided under the PDB contract have two distinct elements: preconstruction phase and construction phases.

Work Details
The project consists of a phased construction of a Wastewater Treatment Facility in phases with the initial phase of a 12MGD Water Recycling Facility utilizing portions of the existing Wastewater Treatment Plant #3 for treatment until final build out is complete. Future plans for the existing plant may include converting portions of the existing wastewater plant for additional storage, future storm water harvesting and treatment, and a water resource and education center.

The project also includes future abandonment of the existing Wastewater Treatment Plant #2, converting basins for average daily flow storage, redesign of the existing reclaim water storage and pumping, upgrading the existing sewage lift station, and construction of a sewage force main from Wastewater Treatment Plant # 2 to the City’s Master Lift Station #1050 located at the Chain of Lake Complex. The treatment process will be selected through collaboration between the Proposer and the City, which will deliver high-quality (AWT) and efficient wastewater treatment. The first phase of the project is expected to be operational to deliver highly treated effluent water on or before December 1, 2028 with a complete buildout by 2034.

Period of Performance
The contract will be performed over a period of up to 10 years.

Place of Performance
The project will be performed at Winter Haven’s Water Recycling Facility at Pollard Road and at the existing Wastewater Treatment Plant #2.

Overview

Opportunity Type
Request for Statement of Qualifications
Opportunity ID
RFSQ-08193
Version
1
Response Start Date
March 6, 2024
Response Deadline
April 5, 2024 Past Due
Date Posted
March 6, 2024
Last Updated
March 6, 2024
Agency Distribution
High
Source
On 3/6/24 City of Winter Haven in Florida issued Request for Statement of Qualifications Progressive Design Build - Water Recycling Facility at Pollard Road with ID RFSQ-08193 due 4/5/24.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Progressive Design Build - Water Recycling Facility at Pollard Road

Additional Details

Agency Advertisement Number
RFQ-24-18
Minority Encouraged
false

Similar Active Opportunities