Holiday Park Improvements - Phase II
ID: 518
• State: Florida
Opportunity Assistant
Loading
Description
Background
The City of Fort Lauderdale, Florida, is seeking bids for construction services at Holiday Park, located at 1150 G. Harold Martin Drive, Fort Lauderdale, FL 33304. This project is part of the Parks and Recreation Department's initiative to enhance public parks and recreational facilities. The goal is to improve the park's infrastructure and amenities to better serve the community.
Work Details
The project includes extensive construction services such as:
- Demolition of existing structures including playgrounds, lighting, and fencing;
- Grading and drainage improvements;
- Installation of a new irrigation system;
- Landscaping with new trees, palms, shrubs, and sod;
- Construction of a new playground area with equipment and safety surfacing;
- Enhancements to dog park facilities including concrete pads and seating;
- Installation of new sidewalks and signage throughout the park;
- Various site enhancements like benches, tables, trash receptacles, and shade structures for sports fields.
Specific tasks include root removal, stump grinding, erosion control measures, and adjustments to existing storm drainage structures.
Period of Performance
The contract work is expected to be completed within the number of calendar days stipulated in the contract following the issuance of a Notice to Proceed (NTP).
Place of Performance
All work will be performed at Holiday Park located at 1150 G. Harold Martin Drive, Fort Lauderdale, FL 33304.
Bidder Requirements
Bidders must possess appropriate licenses as described in the Contract Documents. Additionally, all subcontractors must comply with the City’s Code of Ordinances at the time of the pre-construction conference.
The City of Fort Lauderdale, Florida, is seeking bids for construction services at Holiday Park, located at 1150 G. Harold Martin Drive, Fort Lauderdale, FL 33304. This project is part of the Parks and Recreation Department's initiative to enhance public parks and recreational facilities. The goal is to improve the park's infrastructure and amenities to better serve the community.
Work Details
The project includes extensive construction services such as:
- Demolition of existing structures including playgrounds, lighting, and fencing;
- Grading and drainage improvements;
- Installation of a new irrigation system;
- Landscaping with new trees, palms, shrubs, and sod;
- Construction of a new playground area with equipment and safety surfacing;
- Enhancements to dog park facilities including concrete pads and seating;
- Installation of new sidewalks and signage throughout the park;
- Various site enhancements like benches, tables, trash receptacles, and shade structures for sports fields.
Specific tasks include root removal, stump grinding, erosion control measures, and adjustments to existing storm drainage structures.
Period of Performance
The contract work is expected to be completed within the number of calendar days stipulated in the contract following the issuance of a Notice to Proceed (NTP).
Place of Performance
All work will be performed at Holiday Park located at 1150 G. Harold Martin Drive, Fort Lauderdale, FL 33304.
Bidder Requirements
Bidders must possess appropriate licenses as described in the Contract Documents. Additionally, all subcontractors must comply with the City’s Code of Ordinances at the time of the pre-construction conference.
Loading Map
Loading Map
Overview
Agency
Opportunity Type
IFB
Opportunity ID
518
Version
1
Response Deadline
Oct. 27, 2025
Past Due
Date Posted
Aug. 12, 2025
Source
Est. Value Range
Experimental
$2,000,000 - $5,000,000
(AI estimate)
Agency Distribution
Moderate
On 8/12/25 City of Fort Lauderdale in Florida issued IFB Holiday Park Improvements - Phase II with ID 518 due 10/27/25.
Contacts
Documents
Posted documents for Holiday Park Improvements - Phase II
Opportunity Assistant
AI Analysis
AI Generate
Classifications
NAICS