JTVCC-New Sallyport and Intake Facility
ID: OMB-MJ3804000087A
• State: Delaware
Opportunity Assistant
Loading
Description
Background
The James T. Vaughn Correctional Center is issuing a contract for the construction of a New Sallyport and Intake Facility located at 1181 Paddock Road, Smyrna, Delaware.
The project aims to enhance the facility's operational capabilities and security measures. R G Architects, LLC is the architect overseeing this project under OMB/DFM Contract No. MJ3804000087.
Work Details
The contract includes the following key components:
- Construction of a new Sallyport and Intake Facility with specific design and security features as outlined in the project manual.
- The project requires adherence to State of Delaware prevailing wage rates.
- There are two alternates:
1. Alternate No. 1 involves providing network connectivity for the Building Automation System (BAS) that integrates with existing systems managed by Modern Controls.
2. Alternate No. 2 includes additional costs for fence work as specified in the drawings.
- A General Owner's Allowance of $75,000 is included for owner-elected changes to the work.
Period of Performance
The tentative construction start date is on or around March 1, 2025, with no construction allowed prior to this date.
Place of Performance
The work will be performed at the James T. Vaughn Correctional Center located at 1181 Paddock Road, Smyrna, Delaware.
The James T. Vaughn Correctional Center is issuing a contract for the construction of a New Sallyport and Intake Facility located at 1181 Paddock Road, Smyrna, Delaware.
The project aims to enhance the facility's operational capabilities and security measures. R G Architects, LLC is the architect overseeing this project under OMB/DFM Contract No. MJ3804000087.
Work Details
The contract includes the following key components:
- Construction of a new Sallyport and Intake Facility with specific design and security features as outlined in the project manual.
- The project requires adherence to State of Delaware prevailing wage rates.
- There are two alternates:
1. Alternate No. 1 involves providing network connectivity for the Building Automation System (BAS) that integrates with existing systems managed by Modern Controls.
2. Alternate No. 2 includes additional costs for fence work as specified in the drawings.
- A General Owner's Allowance of $75,000 is included for owner-elected changes to the work.
Period of Performance
The tentative construction start date is on or around March 1, 2025, with no construction allowed prior to this date.
Place of Performance
The work will be performed at the James T. Vaughn Correctional Center located at 1181 Paddock Road, Smyrna, Delaware.
Overview
Opportunity ID
OMB-MJ3804000087A
Version
1
Response Deadline
Oct. 10, 2024
Past Due
Date Posted
Aug. 27, 2024
Source
Est. Value Range
Experimental
$5,000,000 - $10,000,000
(AI estimate)
Agency Distribution
High
On 8/27/24 Office of Management and Budget in Delaware issued JTVCC-New Sallyport and Intake Facility with ID OMB-MJ3804000087A due 10/9/24.
Contacts
Documents
Posted documents for JTVCC-New Sallyport and Intake Facility
Opportunity Assistant
AI Analysis
AI Generate