Miami Beach Association Sewer and Association Improvements Project
ID: 31108 • State: Connecticut
Opportunity Assistant
Loading
Description
Background
The Miami Beach Association Sewer and Association Improvements Project is initiated by the Old Colony Beach Club Association.
The project aims to enhance the sewer infrastructure and associated services in the Miami Beach area, ensuring improved drainage and road conditions.
Work Details
The project includes the following construction tasks:
1) 19,500 linear feet of gravity sewer mains and lateral services;
2) 350 linear feet of horizontal directional drilling;
3) 6,705 linear feet of storm drainage installation;
4) Restoration of unpaved areas to existing conditions or better;
5) Temporary trench repair;
6) Reconstruction of Association roads.
Additionally, there are four bid alternates:
a) Helical piles and support system;
b) Permanent trench repair;
c) Mill and overlay;
d) Cold reclaimed subbase & 4-inch HMA pavement.
Period of Performance
The contract will be performed from July 09, 2025, to August 12, 2025.
Place of Performance
The work will be conducted in the Miami Beach area as specified by the Old Colony Beach Club Association.
Bidder Requirements
All vendors are eligible to respond to this bid. No specific set-aside certifications or local requirements are mentioned.
The Miami Beach Association Sewer and Association Improvements Project is initiated by the Old Colony Beach Club Association.
The project aims to enhance the sewer infrastructure and associated services in the Miami Beach area, ensuring improved drainage and road conditions.
Work Details
The project includes the following construction tasks:
1) 19,500 linear feet of gravity sewer mains and lateral services;
2) 350 linear feet of horizontal directional drilling;
3) 6,705 linear feet of storm drainage installation;
4) Restoration of unpaved areas to existing conditions or better;
5) Temporary trench repair;
6) Reconstruction of Association roads.
Additionally, there are four bid alternates:
a) Helical piles and support system;
b) Permanent trench repair;
c) Mill and overlay;
d) Cold reclaimed subbase & 4-inch HMA pavement.
Period of Performance
The contract will be performed from July 09, 2025, to August 12, 2025.
Place of Performance
The work will be conducted in the Miami Beach area as specified by the Old Colony Beach Club Association.
Bidder Requirements
All vendors are eligible to respond to this bid. No specific set-aside certifications or local requirements are mentioned.
Overview
Opportunity Type
ITB
Opportunity ID
31108
Response Deadline
Aug. 12, 2025
Past Due
Date Posted
July 9, 2025
Est. Value Range
Experimental
$5,000,000 - $15,000,000
(AI estimate)
Agency Distribution
High
Source
Source Notes
Source does not have a linkable page for this opportunity. To find the opportunity, go to the Source website listed above and search for the opportunity title.
On 7/9/25 Old Colony Beach Club Association in Connecticut issued ITB Miami Beach Association Sewer and Association Improvements Project with ID 31108 due 8/12/25.
Contacts
Documents
Posted documents for Miami Beach Association Sewer and Association Improvements Project
Opportunity Assistant
AI Analysis
AI Generate
Classifications
NAICS
UNSPSC
72141103 - Highway and road paving service
Additional Details
Who Can Respond
All Vendors