Search Contract Opportunities

Generator Replacement at the Seymour Wellfield

ID: 21596 • State: Connecticut

Description

For more information please visit our website: www.rwater.com The project generally includes demolition of the existing diesel generator, elevated pad and fuel tank and provision of a new 500 kW generator with an integral 72-hour belly tank. The new generator will be mounted on an elevated concrete foundation with a raised platform, to locate it above the 100-year flood plain. Contractors submitting a bid for this project shall hold a current Prequalification Certificate in one of the following categories, Electrical , HVAC , General Building Construction (Group C) , or Water Treatment Plants from the State of Connecticut Department of Administrative Services (DAS). A copy of the Contractor's DAS Prequalification Certificate and Update (Bid) Statement must be submitted with the bid.
Background
The South Central Connecticut Regional Water Authority (SCCRWA) is seeking bids for the Generator Replacement at the Seymour Wellfield. The project involves the demolition of the existing diesel generator, elevated pad, and fuel tank, and the provision of a new 500 kW generator with an integral 72-hour belly tank. The new generator will be mounted on an elevated concrete foundation with a raised platform to locate it above the 100-year flood plain. Contractors submitting a bid for this project must hold a current Prequalification Certificate in one of the following categories: 'Electrical', 'HVAC', 'General Building Construction (Group C)', or 'Water Treatment Plants' from the State of Connecticut Department of Administrative Services (DAS).

Work Details
The work includes demolition of existing infrastructure and installation of a new 500 kW generator with an integral 72-hour belly tank. The new generator will be mounted on an elevated concrete foundation with a raised platform to ensure it is above the 100-year flood plain. Contractors are required to hold a current Prequalification Certificate in specific categories from the State of Connecticut Department of Administrative Services (DAS) to be eligible to bid.

Period of Performance
The period of performance for this contract is from March 21, 2024, to April 25, 2024.

Place of Performance
The project will be performed at Seymour Wellfield, and contractors are required to submit their bids to the South Central Connecticut Regional Water Authority.

Overview

Opportunity Type
ITB
Opportunity ID
21596
Response Deadline
April 25, 2024 Past Due
Date Posted
March 21, 2024
Source
Source Notes
Source does not have a linkable page for this opportunity. To find the opportunity, go to the Source website listed above and search for the opportunity title.
On 3/21/24 So. Central CT Regional Water Auth. in Connecticut issued ITB Generator Replacement at the Seymour Wellfield with ID 21596 due 4/25/24.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Generator Replacement at the Seymour Wellfield

Additional Details

Who Can Respond
All Vendors

Similar Active Opportunities