Search Contract Opportunities

CTF AVCF Utility Water Line Rpl. IFB1 TBD CMS190689

ID: IFB1-CBAA-2024000192-4 • State: Colorado
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading
Real Time Alerts from 50k+ Federal, State and Local Agencies
Find Now

Description

Background
The project is titled Utility Water Lines Replacement, Arkansas Valley Correctional Facility and is being issued by the State of Colorado Department of Corrections. The estimated construction cost is $6,900,000. The existing underground heating and chilled water utilities and existing water softener system have exceeded their service life expectancy.

Work Details
The project objectives include the replacement of the existing underground hot water piping mains using the existing abandoned concrete utilidor, repair of the existing interior hot water piping joints, replacement of the existing water softener system in the central plant, and the replacement of the existing underground chilled water piping systems.
The Department of Corrections is requesting six additive alternate bids, including replacement of the interior water mains, extending the underground hot and chilled water piping systems to complete a service loop, and to reconfigure a section of the concrete pipe utilidor to resolve a drainage issue.
The scope of services includes field verification, equipment/engineering submittals, selective demolition, installation of specified mechanical equipment, final electrical connections, cast-in-place concrete, concrete utilidor repair, potholing, surveying, earthwork, precast concrete vault, steel piping, HDPE piping, prefabricated direct bury piping, horizontal directional drilling, access doors, salt brine tank, and a triplex water softener system.

Period of Performance
The schedule for the advertisement for bid process is as follows: Advertisement on April 22, 2024; Mandatory Pre-Bid Conference and Tour on May 8, 2024; Non-Mandatory Pre-Bid Conference and Tour on May 17, 2024; Sealed Bids Due on June 13, 2024 at 1330; Negotiation of General Contractor Contract on June 21, 2024; Contract Approval (projected) on June 28, 2024; Anticipated Design Start - TBD; Anticipated General Contractor Start - TBD; Anticipated Construction Start/Finish - TBD.

Place of Performance
The project will be performed at Arkansas Valley Correctional Facility located at 12750 CO-96 Ordway, CO 81034.

Overview

Opportunity Type
Invitation for Bids (IFB1)
Opportunity ID
IFB1-CBAA-2024000192-4
Response Deadline
June 27, 2024 Past Due
Date Posted
June 11, 2024
Source
Source Notes
Source does not have a linkable page for this opportunity. To find the opportunity, go to the Source website listed above and search for the Opportunity ID.

Est. Value Range
Experimental
$100,000 - $500,000 (AI estimate)
Agency Distribution
High
On 6/11/24 DOC - Penitentiary (Capital Construction) in Colorado issued Invitation for Bids (IFB1) CTF AVCF Utility Water Line Rpl. IFB1 TBD CMS190689 with ID IFB1-CBAA-2024000192-4 due 6/26/24.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for CTF AVCF Utility Water Line Rpl. IFB1 TBD CMS190689

Opportunity Assistant


AI Analysis

AI Generate

Classifications

Opportunity Classification
Construction

Similar Active Opportunities