Terminal Paging System Design and Build

ID: 2025-RFP-002 • State: California
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Summarize the work to be completed under this opportunity
Does this solicitation list any subcontracting requirements?
List any requirements necessary to complete this contract
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

NO VALUE

Background
The Ontario International Airport Authority (OIAA) is a joint-powers authority formed between the City of Ontario and San Bernardino County, responsible for the operation of Ontario International Airport (ONT).
The airport serves over 6.4 million passengers annually and is a significant air cargo facility in Southern California.
The OIAA is seeking proposals for a modern Public Address System (PAS), Terminal Paging System (TPS), and Emergency Communication System (ECS) to enhance communication capabilities within its terminals.

Work Details
The selected contractor will be responsible for the complete design, procurement, installation, testing, commissioning, and training of a new PAS/TPS/ECS that meets the airport's communication needs.
Key deliverables include:
- Engineering and installation of Dante-compatible amplifiers and paging stations with minimal service disruption.
- Decommissioning of existing Cobranet infrastructure and replacement of up to 700 high-voltage speaker units.
- Deployment of at least 80 IP-connected paging stations with redundancy and zone control.
- Integration with existing visual messaging systems and flight information displays.
- Real-time ambient noise sensing and Sound Pressure Level (SPL) adjustment.
- Delivery of system design drawings at various stages (30/60/90%) and final as-builts.
- Final commissioning and live training for operational personnel.

Period of Performance
The project timeline includes a release date on July 29, 2025, with proposal submissions due by August 19, 2025.
The contract term is one year with up to three optional one-year renewals based on performance.

Place of Performance
The contract will be performed at Ontario International Airport located in Ontario, California.

Bidder Requirements
Bidders must demonstrate experience in deploying terminal paging systems at commercial airports, including at least two U.S. airport projects completed within the last five years.
The manufacturer of the proposed hardware must be ISO9001 certified.
Bidders are also required to comply with all insurance, licensing, and safety requirements specified by the OIAA.

Overview

Opportunity ID
2025-RFP-002
Response Deadline
Aug. 19, 2025 Past Due
Date Posted
July 29, 2025
Est. Value Range
Experimental
$5,000,000 - $10,000,000 (AI estimate)
Agency Distribution
Moderate
Source
On 7/29/25 Ontario International Airport in California issued Terminal Paging System Design and Build with ID 2025-RFP-002 due 8/19/25.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Terminal Paging System Design and Build

Similar Active Opportunities