Stormwater Treatment Feasibility Study
ID: 2024-RFP-0204
• State: California
Opportunity Assistant
Loading
Description
Background
Pasadena Water and Power (PWP), a department of the City of Pasadena, is soliciting proposals from qualified consulting firms to provide professional engineering services. This is for a stormwater treatment feasibility study for the Broadway and Glenarm Power Plants located in the City of Pasadena.
Work Details
The scope of work includes overall stormwater quality management, feasibility study, project management, government coordination, public engagement, preliminary design package deliverable (10%), construction budget and cost estimate development, and schedule development. It also involves field investigation and site assessment, analysis of water quality, hydrology, and hydraulic, stormwater treatment alternatives, preliminary design (10%), stormwater treatment feasibility study report, and government grant program assistance.
The timeline for this project includes a release date of April 15, 2024. The deadline for question submission is May 6, 2024 at 2:00 pm. The proposal submission deadline is May 27, 2024 at 2:00 pm.
Place of Performance
The contract will be performed at the Broadway and Glenarm Power Plants located in the City of Pasadena.
Pasadena Water and Power (PWP), a department of the City of Pasadena, is soliciting proposals from qualified consulting firms to provide professional engineering services. This is for a stormwater treatment feasibility study for the Broadway and Glenarm Power Plants located in the City of Pasadena.
Work Details
The scope of work includes overall stormwater quality management, feasibility study, project management, government coordination, public engagement, preliminary design package deliverable (10%), construction budget and cost estimate development, and schedule development. It also involves field investigation and site assessment, analysis of water quality, hydrology, and hydraulic, stormwater treatment alternatives, preliminary design (10%), stormwater treatment feasibility study report, and government grant program assistance.
The timeline for this project includes a release date of April 15, 2024. The deadline for question submission is May 6, 2024 at 2:00 pm. The proposal submission deadline is May 27, 2024 at 2:00 pm.
Place of Performance
The contract will be performed at the Broadway and Glenarm Power Plants located in the City of Pasadena.
Overview
Opportunity ID
2024-RFP-0204
Response Deadline
May 27, 2024
Past Due
Date Posted
April 15, 2024
Source
Agency Distribution
High
On 4/15/24 Water & Power Department, Power Supply Business Unit in California issued Stormwater Treatment Feasibility Study with ID 2024-RFP-0204 due 5/27/24.
Contacts
Documents
Posted documents for Stormwater Treatment Feasibility Study
Opportunity Assistant
AI Analysis
AI Generate