Storm Drain Inlet Upgrades
ID: IFB 26-11 • State: California
Opportunity Assistant
Loading
Description
Background
The City of Beaumont is issuing a contract for the Storm Drain Inlet Upgrades project as part of their Capital Improvement Program (CIP R26-07).
The project aims to enhance stormwater management and pollution control in the area, aligning with the city's mission to improve public infrastructure and environmental quality.
Work Details
The scope of work includes the following key components:
1. Mobilization and De-mobilization: Preparation for site work including movement of personnel and equipment.
2. Stormwater and Non-Stormwater Pollution Control: Compliance with NPDES permit regulations, including preparation of a Water Pollution Control Program (WPCP).
3. Traffic Control: Implementation of traffic management plans to ensure safety during construction.
4. Installation of Triton PERF CPS-FTC Full Trash Capture Devices: Installation procedures must adhere to specific guidelines for effective trash capture and flow rate management.
5. Construction Water: Obtaining water from Beaumont Cherry Valley Water District for construction purposes.
6. Guarantee: A one-year warranty on all work performed post-acceptance by the City.
Period of Performance
Work is expected to commence within ten (10) calendar days after receiving a written Notice of Award from the City, with specific durations established for individual activities as outlined in the project documents.
Place of Performance
The contract will be performed within the City of Beaumont, California, specifically at designated storm drain locations throughout the city.
Bidder Requirements
Bidders must comply with prevailing wage laws as per California Labor Code, including adherence to specified wage rates for Riverside County.
Contractors are required to maintain appropriate insurance coverage throughout the duration of the project.
The City of Beaumont is issuing a contract for the Storm Drain Inlet Upgrades project as part of their Capital Improvement Program (CIP R26-07).
The project aims to enhance stormwater management and pollution control in the area, aligning with the city's mission to improve public infrastructure and environmental quality.
Work Details
The scope of work includes the following key components:
1. Mobilization and De-mobilization: Preparation for site work including movement of personnel and equipment.
2. Stormwater and Non-Stormwater Pollution Control: Compliance with NPDES permit regulations, including preparation of a Water Pollution Control Program (WPCP).
3. Traffic Control: Implementation of traffic management plans to ensure safety during construction.
4. Installation of Triton PERF CPS-FTC Full Trash Capture Devices: Installation procedures must adhere to specific guidelines for effective trash capture and flow rate management.
5. Construction Water: Obtaining water from Beaumont Cherry Valley Water District for construction purposes.
6. Guarantee: A one-year warranty on all work performed post-acceptance by the City.
Period of Performance
Work is expected to commence within ten (10) calendar days after receiving a written Notice of Award from the City, with specific durations established for individual activities as outlined in the project documents.
Place of Performance
The contract will be performed within the City of Beaumont, California, specifically at designated storm drain locations throughout the city.
Bidder Requirements
Bidders must comply with prevailing wage laws as per California Labor Code, including adherence to specified wage rates for Riverside County.
Contractors are required to maintain appropriate insurance coverage throughout the duration of the project.
Loading Map
Loading Map
Overview
Agency
Opportunity Type
Bid
Pre-Bid Conference
No
Opportunity ID
IFB 26-11
Response Deadline
May 7, 2026
Past Due
Date Posted
April 8, 2026
Est. Value Range
Experimental
$500,000 - $1,500,000
(AI estimate)
Agency Distribution
Moderate
Source
On 4/8/26 City of Beaumont in California issued Bid Storm Drain Inlet Upgrades with ID IFB 26-11 due 5/7/26.
Contacts
Documents
Posted documents for Storm Drain Inlet Upgrades
Opportunity Assistant
AI Analysis
AI Generate