Search Contract Opportunities

South San Francisco LPR Battery Backup

ID: Bid 2715 • State: California
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. Please note that the agency does not provide or we do not track documents for this opportunity, please request documents using the link below before proceeding for best results.

Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Loading
Real Time Alerts from 50k+ Federal, State and Local Agencies
Find Now

Description

Work Requested:

The City of South San Francisco is seeking sealed written proposals for the installation of a 250 KW / 506 KWH Battery Energy Storage System (BESS) at 901 Civic Campus Way (Library | Parks & Recreation Center), South San Francisco, California. The scope of work includes, but is not limited to:

  • Furnishing and installing a factory-assembled, self-contained outdoor BESS enclosure within the existing parking lot area
  • Providing a unit with integral HVAC, battery management, and fire detection/suppression systems
  • Interconnecting the BESS with the facility's electrical distribution system to manage peak electrical demand, improve energy performance, and provide standby power for enhanced resiliency during utility outages
  • Completing associated work such as equipment pad construction, trenching, installation of electrical equipment, electrical interconnections, controls integration, and coordination with existing building systems
  • Performing wall penetrations, waterproofing, exterior finish, metal fabrications and supports, as well as concrete and other site work

Requesting Entity:

This solicitation is issued by the City of South San Francisco.


Background:

The project aims to enhance the resiliency and energy performance of the South San Francisco Library, Parks & Recreation Building by installing a battery backup system capable of providing standby power during utility outages and managing peak electrical demand.


Contract Requirements:

  • Installation of a 250 KW / 506 KWH BESS as a factory-assembled, self-contained outdoor enclosure
  • Integration with the facility's existing electrical distribution system
  • Inclusion of HVAC, battery management, and fire detection/suppression systems
  • Completion of all related construction and site work as specified

Instructions on Submission:

Proposals must be submitted in sealed written form as specified in the solicitation for Bid 2715.

Loading Map
Loading Map

Overview

Opportunity ID
Bid 2715
Response Deadline
Feb. 19, 2026 Past Due
Date Posted
Feb. 2, 2026
Source

Est. Value Range
Experimental
$500,000 - $1,500,000 (AI estimate)
Agency Distribution
Moderate
On 2/2/26 Capital Projects in California issued South San Francisco LPR Battery Backup with ID Bid 2715 due 2/19/26.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Subscribe to search 5M+ historical and active solicitation documents

Free Trial Schedule Demo

Opportunity Assistant


Analyst Requests

AI Analysis

Similar Active Opportunities