Background
The City of El Paso de Robles is issuing a contract for the Sierra Bonita, Scott Street, and Fallbrook Court Road Repairs under DPW Project No. 22-14C.
The project aims to enhance local infrastructure by repairing key roadways, which is essential for maintaining safe and efficient transportation within the community.
Work Details
The contractor will be responsible for furnishing all labor, materials, equipment, and performing all work necessary for the construction of the project.
This includes lowering and raising utilities, monument perpetuation, dig-out repairs, placement of Hot Mix Asphalt (HMA) leveling and surface course, key cut tapers and striping, applying Type II slurry, and crack filling.
The contractor must also provide all necessary work plans, permits, and inspections as specified in the contract documents.
Period of Performance
The project must be completed within Ninety (90) WORKING days from the date specified in the Notice to Proceed.
Place of Performance
The work will be performed in the City of El Paso de Robles, California.
Bidder Requirements
Bidders must comply with California Air Resources Board (CARB) regulations effective January 1, 2024.
They are required to submit valid Certificates of Reported Compliance (CRC) issued by CARB with their bids.
All bidders must be registered with the Department of Industrial Relations as per Labor Code sections 1725.5 and 1771.1.
Bidders must possess a valid Class A (General Engineering) License at the time of bid submission.
Additionally, a payment bond and a faithful performance bond equal to 100% of the contract price are required.
The City of El Paso de Robles is issuing a contract for the Sierra Bonita, Scott Street, and Fallbrook Court Road Repairs under DPW Project No. 22-14C.
The project aims to enhance local infrastructure by repairing key roadways, which is essential for maintaining safe and efficient transportation within the community.
Work Details
The contractor will be responsible for furnishing all labor, materials, equipment, and performing all work necessary for the construction of the project.
This includes lowering and raising utilities, monument perpetuation, dig-out repairs, placement of Hot Mix Asphalt (HMA) leveling and surface course, key cut tapers and striping, applying Type II slurry, and crack filling.
The contractor must also provide all necessary work plans, permits, and inspections as specified in the contract documents.
Period of Performance
The project must be completed within Ninety (90) WORKING days from the date specified in the Notice to Proceed.
Place of Performance
The work will be performed in the City of El Paso de Robles, California.
Bidder Requirements
Bidders must comply with California Air Resources Board (CARB) regulations effective January 1, 2024.
They are required to submit valid Certificates of Reported Compliance (CRC) issued by CARB with their bids.
All bidders must be registered with the Department of Industrial Relations as per Labor Code sections 1725.5 and 1771.1.
Bidders must possess a valid Class A (General Engineering) License at the time of bid submission.
Additionally, a payment bond and a faithful performance bond equal to 100% of the contract price are required.
Overview
Agency
Opportunity ID
DPW 22-14C
Response Deadline
Dec. 18, 2025
Past Due
Date Posted
Nov. 26, 2025
Source
Pre-Bid Conference
None
Est. Value Range
Experimental
$500,000 - $1,500,000
(AI estimate)
Agency Distribution
Low
On 11/26/25 City of Paso Robles in California issued Sierra Bonita Neighborhood Road Repairs with ID DPW 22-14C due 12/18/25.
Contacts
Documents
Posted documents for Sierra Bonita Neighborhood Road Repairs
Opportunity Assistant
AI Analysis
AI Generate
Classifications
Opportunity Classification
DPW 22-14C