Search Contract Opportunities

Shelter Creek Sewer Main Replacement Project

ID: 31016 • State: California
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Summarize the work to be completed under this opportunity
Does this solicitation list any subcontracting requirements?
List any requirements necessary to complete this contract
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Engineer's estimate $1,000,000 | The work includes, but is not limited to: 1. Pipe Bursting: Replace approximately 1,149 linear feet of existing sewer main using pipe bursting methods, upsizing from 10-inch to 12-inch diameter pipe to increase capacity. 2. CIPP Lining Shelter Creek Project: Install Cured-In-Place Pipe (CIPP) lining in approximately 1,400 linear feet of 18-inch diameter sewer main. 3. CIPP Lining Portola Project: Install CIPP lining in approximately 131 linear feet of 54-inch diameter storm drain. 4. Surface Restoration: Repair all sidewalk, curb, gutter, and ADA ramps displaced or damaged due to pipe bursting operations, at the discretion of the City inspector or engineer. 5. Utility Potholing: Perform exploration potholing near existing structures and utilities prior to pipe bursting activities. 6. Lateral Reconnection: Replace and reconnect all discovered sanitary sewer laterals not shown on the plans or previously identified. 7. Permit Coordination: Coordinate with Caltrans 8. Secure necessary permit per Section 01 41 00 (Regulatory Requirements). 9. Temporary traffic control per Section 01 51 00 (Temporary Facilities and Control). 10. Site cleaning and removal of debris, equipment, and excess material from the sites upon completion of work 11. Other work as shown on the Drawings
Background
The City of San Bruno, located in San Mateo County, California, is issuing this solicitation for the Shelter Creek Sewer Main Replacement Project. The project aims to enhance the sewer infrastructure to improve capacity and ensure compliance with regulatory requirements.

Work Details
The work includes:

1. Pipe Bursting: Replace approximately 1,149 linear feet of existing sewer main using pipe bursting methods, upsizing from 10-inch to 12-inch diameter pipe.

2. CIPP Lining – Shelter Creek Project: Install Cured-In-Place Pipe (CIPP) lining in approximately 1,400 linear feet of 18-inch diameter sewer main.

3. CIPP Lining – Portola Project: Install CIPP lining in approximately 131 linear feet of 54-inch diameter storm drain.

4. Surface Restoration: Repair all sidewalk, curb, gutter, and ADA ramps displaced or damaged due to pipe bursting operations at the discretion of the City inspector or engineer.

5. Utility Potholing: Perform exploration potholing near existing structures and utilities prior to pipe bursting activities.

6. Lateral Reconnection: Replace and reconnect all discovered sanitary sewer laterals not shown on the plans or previously identified.

7. Permit Coordination: Coordinate with Caltrans and secure necessary permits per Section 01 41 00 (Regulatory Requirements).

8. Temporary Traffic Control: Implement temporary traffic control per Section 01 51 00 (Temporary Facilities and Control).

9. Site Cleaning: Remove debris, equipment, and excess material from the sites upon completion of work.

10. Other work as shown on the Drawings.

Period of Performance
All work under this contract shall be completed within 85 Working Days from the Notice to Proceed effective date.

Place of Performance
The project will be performed in San Bruno, California.

Bidder Requirements
A California Class 'A' contractor’s license is required to bid on this contract. Joint ventures must secure a joint venture license prior to award.

Overview

Pre-Bid Conference
8/8/25 10:00am
Opportunity ID
31016
Response Deadline
Aug. 25, 2025 Past Due
Date Posted
July 25, 2025
Est. Value Range
Experimental
$800,000 - $1,200,000 (AI estimate)
Agency Distribution
Low
Source
On 7/25/25 San Bruno in California issued Shelter Creek Sewer Main Replacement Project with ID 31016 due 8/25/25.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Shelter Creek Sewer Main Replacement Project

Similar Active Opportunities