The County of San Diego Department of Parks and Recreation is issuing a Request for Bid (RFB) for the Lindo Lake Improvements Phase II project, identified as Oracle Project No. 1025566. The project aims to enhance the recreational and ecological aspects of Lindo Lake, aligning with the County's mission to provide quality parks and recreational facilities.
Work Details
The work includes a comprehensive range of tasks such as:
- Protection, clearing, and demolition
- Dewatering of the west basin
- Stormwater diversion
- Earthworks including excavation, grading, and export
- Installation of a bentonite liner
- Construction of water aeration systems and fish habitat structures
- Building boat ramps, foot bridges, bird watching stations, fishing piers
- Creating footpaths, fences, picnic tables, benches, BBQ grills, shade structures, trash bins, hot coal bins, decorative boulders
- Softscape and irrigation for ornamental and restoration purposes
- A 120-day maintenance period post-construction.
Specific items include mobilization & demobilization; construction fencing & staging; preparation of a Storm Water Pollution Prevention Plan (SWPPP); class 'A' field office setup; pre-construction site survey & staking; monument preservation & restoration; post-construction site survey & record drawings; tree protection & removal activities; stormwater diversion works including sump pits and temporary pumping stations.
Period of Performance
The contract work is expected to commence upon award and is subject to completion timelines outlined in the bid documents. Key dates include a pre-bid conference on March 16, 2026, with bids due by April 10, 2026.
Place of Performance
The project will be executed at Lindo Lake Park located in San Diego County.
Bidder Requirements
Bidders must be prequalified by the County as per Board of Supervisors Policy F-41. Additionally, there is a requirement for at least three percent (3%) Small-Local Business Subcontractor Participation unless exempted. Bidders must submit a Small-Local Business Utilization Plan demonstrating compliance with this requirement.
The County of San Diego Department of Parks and Recreation is issuing a Request for Bid (RFB) for the Lindo Lake Improvements Phase II project, identified as Oracle Project No. 1025566. The project aims to enhance the recreational and ecological aspects of Lindo Lake, aligning with the County's mission to provide quality parks and recreational facilities.
Work Details
The work includes a comprehensive range of tasks such as:
- Protection, clearing, and demolition
- Dewatering of the west basin
- Stormwater diversion
- Earthworks including excavation, grading, and export
- Installation of a bentonite liner
- Construction of water aeration systems and fish habitat structures
- Building boat ramps, foot bridges, bird watching stations, fishing piers
- Creating footpaths, fences, picnic tables, benches, BBQ grills, shade structures, trash bins, hot coal bins, decorative boulders
- Softscape and irrigation for ornamental and restoration purposes
- A 120-day maintenance period post-construction.
Specific items include mobilization & demobilization; construction fencing & staging; preparation of a Storm Water Pollution Prevention Plan (SWPPP); class 'A' field office setup; pre-construction site survey & staking; monument preservation & restoration; post-construction site survey & record drawings; tree protection & removal activities; stormwater diversion works including sump pits and temporary pumping stations.
Period of Performance
The contract work is expected to commence upon award and is subject to completion timelines outlined in the bid documents. Key dates include a pre-bid conference on March 16, 2026, with bids due by April 10, 2026.
Place of Performance
The project will be executed at Lindo Lake Park located in San Diego County.
Bidder Requirements
Bidders must be prequalified by the County as per Board of Supervisors Policy F-41. Additionally, there is a requirement for at least three percent (3%) Small-Local Business Subcontractor Participation unless exempted. Bidders must submit a Small-Local Business Utilization Plan demonstrating compliance with this requirement.
Loading Map
Loading Map
Overview
Agency
Opportunity ID
BPM013078
Version
1
Response Deadline
May 1, 2026
Past Due
Date Posted
March 11, 2026
Source
Pre-Bid Conference
Pre-Bid Conference Attendance is required. The conference will focus on the main points of the RFB.
Est. Value Range
Experimental
$5,000,000 - $10,000,000
(AI estimate)
Agency Distribution
High
On 3/11/26 San Diego County in California issued Lindo Lake Improvements Phase 2 with ID BPM013078 due 4/30/26.
Contacts
Documents
Posted documents for Rfb - Lindo Lake Improvements Phase 2
Opportunity Assistant
AI Analysis
AI Generate