MI 2640 Trash Full Capture Device Installation - 2025/2026-09
Opportunity Assistant
Description
Work Requested:
The contract involves the comprehensive design, fabrication, and installation of Trash Full Capture Devices at 16 designated catch basins located throughout the City. All devices installed must be certified and must strictly comply with the requirements established by the State Water Resource Control Board.
Requesting Entity:
This solicitation is issued by the City for the specified catch basin improvements.
Background:
This project is part of the City's ongoing efforts to enhance stormwater management and environmental protection by preventing trash from entering waterways through catch basins. The installation of certified Trash Full Capture Devices is a key compliance measure with state environmental regulations.
Contract Requirements:
- Design of Trash Full Capture Devices tailored for 16 catch basin locations.
- Fabrication of devices to meet certification standards.
- Installation of devices at all specified catch basins.
- Strict adherence to State Water Resource Control Board Requirements for certification and installation.
Submission Instructions:
Refer to the solicitation documents for detailed instructions on how to submit your proposal for Opportunity ID: 2025/F2026-09.
Overview
Contacts
Documents
Opportunity Assistant
Analyst Requests
AI Analysis