Background
San Diego State University, acting for the Trustees of the California State University, is requesting proposals for the design and construction of the GMCS Elevator Modernization Project. The project aims to modernize the elevators in the Geology, Math, and Computer Science (GMCS) building, adhering to specific design objectives and minimum acceptable standards of construction as outlined in the RFP.
Work Details
The contractor will utilize a Turnkey Method to design and build the project. The scope includes:
1. Design and construction of elevator modernization;
2. Subcontracting electrical, fire alarm, and sprinkler work;
3. Collaboration with Johnson Controls Fire Protection LP for fire alarm work;
4. Compliance with maximum cost limits set at $575,000;
5. Adherence to prevailing wage rates as established by California law;
6. Submission of separate Technical and Cost Proposals via PlanetBids by specified deadlines.
Period of Performance
The contract is expected to begin in November 2025 with a completion time of 88 calendar days from May 22, 2026, aiming for project readiness by August 18, 2026.
Place of Performance
The work will be performed at San Diego State University's GMCS building located at 5500 Campanile Drive, San Diego, CA 92182.
Bidder Requirements
Proposers must qualify major subcontractors for trades exceeding 5% of the construction budget. Proposals must include a firm fixed-price basis valid for 90 days post-submission. Additionally, proposers are encouraged to achieve at least a 3% Disabled Veterans Business Enterprise (DVBE) participation rate to qualify for bonus points.
San Diego State University, acting for the Trustees of the California State University, is requesting proposals for the design and construction of the GMCS Elevator Modernization Project. The project aims to modernize the elevators in the Geology, Math, and Computer Science (GMCS) building, adhering to specific design objectives and minimum acceptable standards of construction as outlined in the RFP.
Work Details
The contractor will utilize a Turnkey Method to design and build the project. The scope includes:
1. Design and construction of elevator modernization;
2. Subcontracting electrical, fire alarm, and sprinkler work;
3. Collaboration with Johnson Controls Fire Protection LP for fire alarm work;
4. Compliance with maximum cost limits set at $575,000;
5. Adherence to prevailing wage rates as established by California law;
6. Submission of separate Technical and Cost Proposals via PlanetBids by specified deadlines.
Period of Performance
The contract is expected to begin in November 2025 with a completion time of 88 calendar days from May 22, 2026, aiming for project readiness by August 18, 2026.
Place of Performance
The work will be performed at San Diego State University's GMCS building located at 5500 Campanile Drive, San Diego, CA 92182.
Bidder Requirements
Proposers must qualify major subcontractors for trades exceeding 5% of the construction budget. Proposals must include a firm fixed-price basis valid for 90 days post-submission. Additionally, proposers are encouraged to achieve at least a 3% Disabled Veterans Business Enterprise (DVBE) participation rate to qualify for bonus points.
Loading Map
Loading Map
Overview
Agency
Opportunity Type
Sell Event
Pre-Bid Conference
Non Mandatory
Opportunity ID
7049
Version
1
Response Deadline
Nov. 3, 2025
Past Due
Date Posted
Oct. 2, 2025
Est. Value Range
Experimental
$1,000,000 - $5,000,000
(AI estimate)
Agency Distribution
High
Source
On 10/2/25 CSU, San Diego in California issued Sell Event GMCS Elevator Modernization with ID 7049 due 11/3/25.
Contacts
Documents
Posted documents for GMCS Elevator Modernization Project
Opportunity Assistant
Classifications
NAICS
UNSPSC
72101506 - Building facility maintenance & repair services - Elevator maintenance services