Search Contract Opportunities

Fresno Yosemite International Airport (FAT) Runway 11L-29R Reconstruction Airport Improvement Program Grant NO. 3-06-0087-100-2025

ID: 12502600 • State: California
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Summarize the work to be completed under this opportunity
Does this solicitation list any subcontracting requirements?
List any requirements necessary to complete this contract
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

The scope of work includes: The Runway 11L-29R' Reconstruction Project consists of a full depth reconstruction of Runway 11L-29R' with Portland cement concrete (PCC) pavement, reconstruction of runway shoulders in asphaltic concrete (AC) pavement, seal coat of Taxiways B' and C', sealcoat of connector Taxiway B6' and connector taxiways B12' and C12' from runway to the hold bars, reconstruction of connector taxiways B10 and C10' (construction alternates), seal coat of the 11L' blast pad/overrun area (construction alternate), mill and overlay of connector Taxiway B2' (construction alternate), reconstruction of the 29R' blast pad/overrun area including improvements to
the existing approach lighting with sequenced flashing lights (ALSF) (construction alternate), and demolition of Taxiways B3' and B4' (construction alternate).
Background
The City of Fresno is issuing this solicitation for the Runway 11L-29R Reconstruction Project at Fresno Yosemite International Airport (FAT) under the Airport Improvement Program Grant NO. 3-06-0087-100-2025.
The project aims to enhance airport infrastructure and ensure compliance with federal aviation standards.

Work Details
The scope of work includes:
- Full depth reconstruction of Runway 11L-29R with Portland cement concrete (PCC) pavement;
- Reconstruction of runway shoulders in asphaltic concrete (AC) pavement;
- Seal coat of Taxiways B and C;
- Sealcoat of connector Taxiway B6 and connector taxiways B12 and C12 from runway to the hold bars;
- Reconstruction of connector taxiways B10 and C10 (construction alternates);
- Seal coat of the 11L blast pad/overrun area (construction alternate);
- Mill and overlay of connector Taxiway B2 (construction alternate);
- Reconstruction of the 29R blast pad/overrun area including improvements to existing approach lighting with sequenced flashing lights (ALSF) (construction alternate);
- Demolition of Taxiways B3 and B4 (construction alternate).

Period of Performance
The contract work is expected to be performed over a period leading up to the bid opening on August 5, 2025, with specific timelines for various phases outlined in the project specifications.

Place of Performance
The work will be performed at Fresno Yosemite International Airport, located in Fresno, California.

Bidder Requirements
Bidders must possess a valid Class 'A' Contractor's License issued by the State of California.
Additionally, all proposals must include a Bid Deposit amounting to TEN PERCENT (10%) of the Total Net Bid Amount.
Contractors and Subcontractors must comply with Labor Code sections 1771.1 and 1771.5 prior to submitting bids.
The project is subject to federal requirements including Buy American Preference, Davis Bacon Requirements, and Disadvantaged Business Enterprise participation.

Overview

Opportunity Type
Bid
Pre-Bid Conference
Yes - Not Mandatory 07/21/2025 10:00 AM (PDT) A pre-bid conference will be held at 10:00 a..m. on July 21, 2025. City Staff will be present to answer any questions regarding the Specifications and bid process. Prospective Bidders are encouraged to attend. Please join the meeting from your computer, tablet or smartphone using the ZOOM link provided: https://fresno.zoomgov.com/j/1611511032 or call 1 (669) 254-5252, Meeting ID 161 151 1032.
Opportunity ID
12502600
Response Deadline
Aug. 5, 2025 Past Due
Date Posted
July 2, 2025
Est. Value Range
Experimental
$50,000,000 - $100,000,000 (AI estimate)
Agency Distribution
High
Source
On 7/2/25 City of Fresno in California issued Bid Fresno Yosemite International Airport Runway 11L-29R Reconstruction with ID 12502600 due 8/5/25.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Fresno Yosemite International Airport (FAT) Runway 11L-29R Reconstruction Airport Improvement Program Grant NO. 3-06-0087-100-2025

Additional Details

Special Notices
http://www.fresno.gov/Government/DepartmentDirectory/Finance/Purchasing/AnticipatedFormalBidAwards.htm Click here to visit Anticipated Bid Awards website once the bid closes to find out more about the award
Other Details
DOWNLOAD SPECIFICATIONS FOR FULL DETAILS
Estimated Bid Value
$130,674,836.25