Ext Prt | Roofing & Structural Repairs
ID: SFGOV-0000011114
• State: California
Opportunity Assistant
Loading
Description
Background
The City and County of San Francisco is issuing a contract for roofing and structural repairs at Pier 9 and Pier 33. The goal of the contract is to address deteriorated roofing materials and structural elements to ensure safety and functionality.
Work Details
The base work will consist of:
• Pier 9: Remove, repair, and/or replace deteriorated roofing materials, roof decking, parapet elements, ladders, flagpoles, conduit, roof equipment and related utility connections, exterior lights, and the roof drainage system. New exterior lights and overflow drains will be added to the roof system.
• Pier 33: Remove, repair, and/or replace deteriorated structure, roofing materials, roof decking, windows, parapet elements, ladders, flagpoles, conduit, roof equipment and related utility connections. New overflow drains will be added to the roof system.
There are two additive bid alternates to upgrade the bulkhead or shed portions of the roof diaphragm at Pier 9.
Period of Performance
The contract work is scheduled to begin on October 1, 2025, and is expected to be completed by October 30, 2025.
Place of Performance
The work will be performed at Pier 9 and Pier 33 in San Francisco, California.
Bidder Requirements
Bidders must comply with all local regulations; specific set-aside certifications or requirements were not detailed in the solicitation.
The City and County of San Francisco is issuing a contract for roofing and structural repairs at Pier 9 and Pier 33. The goal of the contract is to address deteriorated roofing materials and structural elements to ensure safety and functionality.
Work Details
The base work will consist of:
• Pier 9: Remove, repair, and/or replace deteriorated roofing materials, roof decking, parapet elements, ladders, flagpoles, conduit, roof equipment and related utility connections, exterior lights, and the roof drainage system. New exterior lights and overflow drains will be added to the roof system.
• Pier 33: Remove, repair, and/or replace deteriorated structure, roofing materials, roof decking, windows, parapet elements, ladders, flagpoles, conduit, roof equipment and related utility connections. New overflow drains will be added to the roof system.
There are two additive bid alternates to upgrade the bulkhead or shed portions of the roof diaphragm at Pier 9.
Period of Performance
The contract work is scheduled to begin on October 1, 2025, and is expected to be completed by October 30, 2025.
Place of Performance
The work will be performed at Pier 9 and Pier 33 in San Francisco, California.
Bidder Requirements
Bidders must comply with all local regulations; specific set-aside certifications or requirements were not detailed in the solicitation.
Overview
Agency
Opportunity ID
SFGOV-0000011114
Version
1
Response Deadline
Oct. 24, 2025
Past Due
Date Posted
Oct. 1, 2025
Source
Est. Value Range
Experimental
$5,000,000 - $10,000,000
(AI estimate)
Agency Distribution
High
On 10/1/25 City of San Francisco in California issued Ext Prt | Roofing & Structural Repairs with ID SFGOV-0000011114 due 10/24/25.
Contacts
Documents
Posted documents for Ext Prt | Roofing & Structural Repairs
Opportunity Assistant
AI Analysis
AI Generate
Classifications
Opportunity Classification
Sell Event