Background
The Port of San Francisco is issuing an Invitation for Bids (IFB) for the demolition of buildings and structures at Pier 90, which previously housed grain mill operations from 1923 until the early 1990s. The site includes various structures such as concrete-reinforced grain silos, grain elevators, and a timber wharf that have fallen into disrepair.
The goal of this contract is to enhance safety and security by demolishing vacant structures that have attracted trespassers and vandalism, thereby preparing the site for future development opportunities.
Work Details
The base bid scope includes:
1) Demolition of all landside buildings and structures on Pier 90, excluding the grain silos;
2) Abandonment of underground utilities in place;
3) Hazardous material abatement as necessary.
There are three additive bid alternates:
1) Demolition of six pile-supported steel loading towers;
2) Demolition of the dilapidated timber wharf deck and pilings;
3) Installation of additional security fencing. The six concrete dolphin structures will remain intact as they are in good condition.
Period of Performance
The landside work is expected to take 320 consecutive calendar days. Waterside work must be completed by November 30, 2026.
Place of Performance
The contract will be performed at Pier 90 in San Francisco, California.
The Port of San Francisco is issuing an Invitation for Bids (IFB) for the demolition of buildings and structures at Pier 90, which previously housed grain mill operations from 1923 until the early 1990s. The site includes various structures such as concrete-reinforced grain silos, grain elevators, and a timber wharf that have fallen into disrepair.
The goal of this contract is to enhance safety and security by demolishing vacant structures that have attracted trespassers and vandalism, thereby preparing the site for future development opportunities.
Work Details
The base bid scope includes:
1) Demolition of all landside buildings and structures on Pier 90, excluding the grain silos;
2) Abandonment of underground utilities in place;
3) Hazardous material abatement as necessary.
There are three additive bid alternates:
1) Demolition of six pile-supported steel loading towers;
2) Demolition of the dilapidated timber wharf deck and pilings;
3) Installation of additional security fencing. The six concrete dolphin structures will remain intact as they are in good condition.
Period of Performance
The landside work is expected to take 320 consecutive calendar days. Waterside work must be completed by November 30, 2026.
Place of Performance
The contract will be performed at Pier 90 in San Francisco, California.
Loading Map
Loading Map
Overview
Agency
Opportunity ID
SFGOV-0000010512
Version
2
Response Deadline
April 17, 2025
Past Due
Date Posted
March 13, 2025
Source
Pre-Bid Conference
Optional Pre-Bid Meeting
Est. Value Range
Experimental
$5,000,000 - $15,000,000
(AI estimate)
Agency Distribution
High
On 3/13/25 City of San Francisco in California issued Demolition of Buildings and Wharf at Pier 90 with ID SFGOV-0000010512 due 4/17/25.
Contacts
Documents
Posted documents for Ext Prt|2858 Demolition Bldgs & Wharf
Opportunity Assistant
AI Analysis
AI Generate
Classifications
Opportunity Classification
Sell Event
NAICS