EXT MOH | Treasure Island BHB GMP Bid
ID: SFGOV-0000011837
• State: California
Opportunity Assistant
Loading
Description
Background
The Treasure Island Behavioral Health Building (BHB) project is being developed by Mercy Housing in collaboration with the San Francisco Department of Public Health. The goal of this contract is to complete the remaining trades necessary for the construction of a new six-story building that will provide residential and support services for behavioral health.
The project aims to create a supportive environment for individuals in need of mental health services.
Work Details
The contract includes a variety of construction trades, specifically:
- Earthwork & Demo
- Structural Concrete
- Masonry
- Structural Steel
- Rough Carpentry
- Exterior Glazing
- Exterior Siding & Metal Panels
- Plaster
- Roofing & Waterproofing
- Sheet Metal
- Sealants & Caulking
- Gypcrete
- Drywall
- Insulation
- Finish Carpentry
- Quartz & Cultured Marble
- DFH (Doors, Frames and Hardware)
- Overhead Coiling Doors
- Tile and Stone
- Acoustical Ceilings
- Flooring
- Painting
- Miscellaneous Specialties
- Bird Control and Integrated Pest Management
- Signage
- Toilet and Bath Accessories
- Food Service Equipment
- Waste Compactors
- Window Treatments
- Asphalt Paving
- Site Concrete
Landscape work including Site Utilities and Personnel Hoist installation is also included. Additionally, Scaffold setup and Site Security measures along with Final Cleaning services are part of the contract. Note that certain trades such as Design-Build Exterior Building Maintenance have already been bid out.
Period of Performance
Construction is scheduled to begin in November 2026 with an estimated total duration of 19 months.
Place of Performance
The work will be performed at Treasure Island Parcel E1.2 in San Francisco, CA 94130.
Bidder Requirements
Bidders must comply with prevailing wage laws (state or federal) for all trades. Union labor is required specifically for carpenters, laborers, and operating engineers. Additionally, the project has equal opportunity workforce participation goals requiring that 41% of the total dollar value of work be performed by qualified Small Business Enterprises (SBEs), particularly those located in San Francisco.
The Treasure Island Behavioral Health Building (BHB) project is being developed by Mercy Housing in collaboration with the San Francisco Department of Public Health. The goal of this contract is to complete the remaining trades necessary for the construction of a new six-story building that will provide residential and support services for behavioral health.
The project aims to create a supportive environment for individuals in need of mental health services.
Work Details
The contract includes a variety of construction trades, specifically:
- Earthwork & Demo
- Structural Concrete
- Masonry
- Structural Steel
- Rough Carpentry
- Exterior Glazing
- Exterior Siding & Metal Panels
- Plaster
- Roofing & Waterproofing
- Sheet Metal
- Sealants & Caulking
- Gypcrete
- Drywall
- Insulation
- Finish Carpentry
- Quartz & Cultured Marble
- DFH (Doors, Frames and Hardware)
- Overhead Coiling Doors
- Tile and Stone
- Acoustical Ceilings
- Flooring
- Painting
- Miscellaneous Specialties
- Bird Control and Integrated Pest Management
- Signage
- Toilet and Bath Accessories
- Food Service Equipment
- Waste Compactors
- Window Treatments
- Asphalt Paving
- Site Concrete
Landscape work including Site Utilities and Personnel Hoist installation is also included. Additionally, Scaffold setup and Site Security measures along with Final Cleaning services are part of the contract. Note that certain trades such as Design-Build Exterior Building Maintenance have already been bid out.
Period of Performance
Construction is scheduled to begin in November 2026 with an estimated total duration of 19 months.
Place of Performance
The work will be performed at Treasure Island Parcel E1.2 in San Francisco, CA 94130.
Bidder Requirements
Bidders must comply with prevailing wage laws (state or federal) for all trades. Union labor is required specifically for carpenters, laborers, and operating engineers. Additionally, the project has equal opportunity workforce participation goals requiring that 41% of the total dollar value of work be performed by qualified Small Business Enterprises (SBEs), particularly those located in San Francisco.
Loading Map
Loading Map
Overview
Agency
Opportunity ID
SFGOV-0000011837
Version
1
Response Deadline
June 15, 2026
Due in 4 Days
Date Posted
May 12, 2026
Source
Pre-Bid Conference
Pre-bid conference required; time and location to be provided.
Q&A Deadline
All bid submissions and communication should be made on BuildingConnected. For any questions regarding this project or BuildingConnected access, contact Cahill Estimating at estimating@cahill-sf.com. Do not contact the Owner/Architect directly.
Set Aside Preferences
Local Vendors
Small Business
Est. Value Range
Experimental
$25,000,000 - $55,000,000
(AI estimate)
Agency Distribution
High
On 5/12/26 City of San Francisco in California issued Treasure Island Behavioral Health Building GMP Bid with ID SFGOV-0000011837 due 6/15/26.