*** 3/6/2025 - Bidder site walk sign-in sheet posted *** 3/4/2025 - RFI Answers posted 1) Project Summary: In preparation for new construction for Phase 3 of the HOPE SF Rebuild Potrero master plan redevelopment, BRIDGE Housing Corporation ( BRIDGE ) will conduct abatement and demolition activities. These activities include abating and demolishing existing vacant buildings in the Phase 3 Annex area of the Potrero Hill public housing complex, which is currently owned and operated by the San Francisco Housing Authority (SFHA). Before abatement and demolition begin, BRIDGE will coordinate with SFHA to identify and plan for the relocation needs of existing residents and service providers occupying the 23 buildings in the Phase 3 area that are slated for demolition. Once the relocation needs have been identified and all existing residents and service providers have been relocated from the Annex, BRIDGE will abate, demolish and off-haul 154 units spread across all 23 buildings in the Phase 3 area [see appendix files for site plans]. Abatement and demolition activity will occur in a phased approach as each Annex building, or group of buildings, becomes entirely vacant of residents. 2) Scopes of Work: Mobilization / Demobilization, Dust Control, Erosion Control, Building Abatement / Debris Removal, Building Demolition, Tree Removal (as needed), Utility Abandonment / Capping / Removal, Utility Protection, Traffic Control & Safety, Environmental Protection & Monitoring 3) LBE/SBE Goals: Entire project 25% SBE, RFP 25% SBE; Project Sponsor strongly encourages Bidders to conduct LBE outreach to participate in construction services. 4) Bid Discount / Rating Bonus: A ten percent (10%) ratings bonus shall be applied to a proposer where the general contractor is an SBE or a Joint Venture/Association composed only of SBE general contractors. A seven and one-half percent (7.5%) rating bonus to a Joint Venture/Association with non-SBE prime and SBE partner with participation that equals or exceeds forty percent (40%). 5) Pre-Bid Meeting Info: Tuesday, February 18 10am-12pm Interested Bidders to meet at 9 Turner Terrace, San Francisco, CA 94107 contact Dakeba Jones at 909-802-9970 with any questions. 6) Instructions on how to submit bid: Submit one pdf version of proposal via email to Nathan.Keibler@bridgehousing.com by Tuesday, March 25 at 5pm PST. -------------------------------------
Background
BRIDGE Housing Corporation, acting on behalf of BRIDGE Potrero Community Associates, LLC, is seeking proposals for abatement and demolition services as part of the HOPE SF Rebuild Potrero project. This initiative aims to redevelop the Potrero Hill public housing complex, which is currently owned and operated by the San Francisco Housing Authority (SFHA). The goal is to prepare for new construction in Phase 3 by safely abating and demolishing existing vacant buildings in the Phase 3 Annex area, ultimately facilitating the construction of high-density multifamily developments.
Work Details
The contractor will be responsible for:
1. Mobilization/Demobilization: Includes all labor, materials, tools, equipment, and incidentals necessary for project execution.
2. Dust Control: Compliance with local regulations to manage dust during demolition activities.
3. Erosion Control: Implementation of measures to prevent soil erosion during construction.
4. Building Abatement/Debris Removal: Properly abate hazardous materials and remove debris from the site.
5. Building Demolition: Demolish 23 buildings containing a total of 154 units down to their concrete foundation pads while ensuring that foundations and surrounding infrastructure remain intact.
6. Tree Removal: As needed based on site conditions.
7. Utility Abandonment/Capping/Removal: Disconnecting and removing utility lines not performed by public or private providers.
8. Utility Protection: Ensuring existing utilities are protected during demolition activities.
9. Traffic Control & Safety: Implementing safety measures for traffic management around the worksite.
10. Environmental Protection & Monitoring: Adhering to environmental regulations throughout the demolition process.
Period of Performance
The contract period is expected to commence in April 2025 and continue until project completion, which is anticipated in Winter 2025.
Place of Performance
The work will be conducted at the Potrero Annex area of the Potrero Hill public housing complex in San Francisco, California.