Nibbi Brothers has been selected as the General Contractor for the Balboa Building E project in San Francisco. We are in receipt of the Bid Set and are currently requesting bid proposals from qualified subcontractors including those certified as SBE's for DIV #01-48 (Select Trades. Fire Protection has been awarded). The Contract Monitoring Division (CMD) has set the SBE participation goal for this project at 25%. Proposals with the required bid forms are due no later than 2:00 PM on Monday, February 24, 2025 online via the Building Connected website Project Name: Balboa Reservoir Building E Project Location: 11 Frida Khalo Way San Francisco, CA Owner: BRIDGE Housing Architect: Van Meter Williams Pollack LLP Project Description: The Balboa Reservoir neighborhood will be a diverse and inclusive mixed-income community that brings together residents and neighbors around the new Reservoir Park. Landscape and architecture will work together to connect residents to the natural setting and to link the surrounding commercial, residential and institutional uses into a cohesive community. The neighborhood will ultimately provide 1,100 units of mixed-income housing in a premier San Francisco location. Key planning elements for the project laid out in the Master Plan Design Standards and Guidelines include the following: Half of the homes proposed for the Balboa Reservoir neighborhood will be affordable to low- and moderate-income households; Family-friendly housing and community spaces will be organized around a centrally located park designed to include the surrounding community and the general public; On- and off-site transportation improvements will prioritize walking, biking, and transit to alleviate congestion and air pollution while enhancing community safety; Surrounding facilities will enhance community connections, including a new public-serving childcare center and community space overlooking the central park. The building design and operations will eliminate greenhouse gas emissions through renewable energy production and zero-waste efforts. Building E will be the first affordable housing development at Balboa Reservoir with 126 affordable family units and two units reserved for building staff. In addition to the residential uses, a large community facility will be available to the surrounding neighborhoods for community and private functions. In recognition of the site's proximity to many transit options, no parking will be provided on-site. Bicycles will be parked at a 1 space per unit ratio with some spaces attributed to cargo bikes and e-bike charging. The building will be six and seven stories, with 5 stories of Type III-A construction over two stories of Type I-A construction. Pre-Bid Meeting: Monday, February 3, 2025 at 10am via Microsoft Teams To RSVP, email Jacqueline at JacquelineL@nibbi.com Labor Requirements: Prevailing Wage Please note Nibbi is signatory to the Carpenter's and Laborer's Union Owner requires participation from minority owned businesses in this Project. The minimum participation requirement is 30% Minority Owned Business Enterprise ( MBE ) Participation. MBE qualification is based on the following: Submission of proof of MBE Certification provided by either local, state or federal authorities in the Project location; or Submission of Sworn Affidavit DBE Participant Qualification (in the form attached hereto) documenting that the business (sole proprietorship, partnership, corporation, or other entity) is 51% owned, operated and controlled by a Minority Group member(s). Here, the term Minority Group or Minority means Black, Latino, Asian, Native Pacific Islander and Native American. Project Schedule: Est. Start: June 2025 Duration: 24 Months Bid Documents: For any questions on accessing this bidding software, please contact Jacqueline Leiva, Precon & Estimating Coordinator via email, JacquelineL@nbbi.com. For specific questions regarding this project, please contact Paris Paraskeva, Senior Estimator via email at ParisP@nibbi.com Prequalification Process: Unless otherwise directed or authorized, in writing, by Contractor, all Subcontractors shall be required to provide prequalification information as defined by the Contractor and their Prequalification System, TradeTapp by Building Connected, upon request and at Contractor's sole discretion, and in all cases prior to Contract award and at any time during the entire duration of the Contract. . . .
Background
The Balboa Reservoir Building E project is initiated by BRIDGE Housing, with Nibbi Brothers selected as the General Contractor. The project aims to create a diverse and inclusive mixed-income community around the new Reservoir Park in San Francisco, ultimately providing 1,100 units of mixed-income housing.
The project emphasizes sustainability, community connection, and affordable housing, with specific goals for minority-owned business participation.
Work Details
The contract involves construction of Building E, which will include 126 affordable family units and two units reserved for building staff. The building will be six and seven stories tall, consisting of five stories of Type III-A construction over two stories of Type I-A construction.
Key features include:
- A large community facility for neighborhood functions.
- Bicycle parking at a ratio of one space per unit, including provisions for cargo bikes and e-bike charging.
- No on-site parking due to proximity to transit options.
- Compliance with prevailing wage laws and a requirement for 30% participation from minority-owned businesses.
Period of Performance
The estimated start date for the project is June 2025, with a duration of 24 months.
Place of Performance
The contract will be performed at 11 Frida Khalo Way, San Francisco, CA.