EXT GSA | Power Station Block 8 Bid Package 1
ID: SFGOV-0000011690
• State: California
Opportunity Assistant
Loading
Description
Background
The Power Station Block 8 project is initiated by the City and County of San Francisco, aiming to construct a 14-story market rate residential building at the intersection of Humboldt Street, Maryland Street, and Delaware Street.
The project includes a parking garage that spans two blocks, with approximately 355 residential units, 550 parking spaces, amenity spaces, and retail areas. The goal is to enhance urban living in the area while adhering to sustainability standards.
Work Details
The contract encompasses Bid Package 1 which includes the following trades: Mechanical, Electrical, Plumbing, Fire Sprinkler, Shoring, Excavation, Glazing, and Elevators.
All trades in this package are to be executed under a Design Build approach. Additionally, there is a requirement for LEED certification with a minimum goal of achieving LEED Gold under LEED V4.
Subcontractors must be prequalified with Swinerton before submitting bids; bids from unqualified subcontractors will not be accepted. A Master Service Agreement will be required upon award.
Period of Performance
The bidding process begins on May 4, 2026, at 8 AM and concludes on June 1, 2026, at 5 PM. The expected completion date for the work should align with the overall project timeline.
Place of Performance
The contract work will take place in San Francisco, California at the designated site for Power Station Block 8.
Bidder Requirements
Bidders must meet a Local Business Enterprise (LBE) participation goal of 17%. All subcontractors must complete a prequalification process with Swinerton prior to bid submission.
The Power Station Block 8 project is initiated by the City and County of San Francisco, aiming to construct a 14-story market rate residential building at the intersection of Humboldt Street, Maryland Street, and Delaware Street.
The project includes a parking garage that spans two blocks, with approximately 355 residential units, 550 parking spaces, amenity spaces, and retail areas. The goal is to enhance urban living in the area while adhering to sustainability standards.
Work Details
The contract encompasses Bid Package 1 which includes the following trades: Mechanical, Electrical, Plumbing, Fire Sprinkler, Shoring, Excavation, Glazing, and Elevators.
All trades in this package are to be executed under a Design Build approach. Additionally, there is a requirement for LEED certification with a minimum goal of achieving LEED Gold under LEED V4.
Subcontractors must be prequalified with Swinerton before submitting bids; bids from unqualified subcontractors will not be accepted. A Master Service Agreement will be required upon award.
Period of Performance
The bidding process begins on May 4, 2026, at 8 AM and concludes on June 1, 2026, at 5 PM. The expected completion date for the work should align with the overall project timeline.
Place of Performance
The contract work will take place in San Francisco, California at the designated site for Power Station Block 8.
Bidder Requirements
Bidders must meet a Local Business Enterprise (LBE) participation goal of 17%. All subcontractors must complete a prequalification process with Swinerton prior to bid submission.
Loading Map
Loading Map
Overview
Opportunity ID
SFGOV-0000011690
Version
1
Response Deadline
June 1, 2026
Due in 0 Days
Date Posted
May 4, 2026
Source
Q&A Deadline
Send any questions to subcontractorprequal@swinerton.com. For plans, specs and bid document information contact Sarah Leads at sleads@swinerton.com.
Set Aside Preferences
Local Vendors
Est. Value Range
Experimental
$45,000,000 - $95,000,000
(AI estimate)
Agency Distribution
High
On 5/4/26 San Francisco General Services Agency in California issued Power Station Block 8 Bid Package 1 with ID SFGOV-0000011690 due 6/1/26.
Contacts
Documents
Posted documents for EXT GSA | Power Station Block 8 Bid Package 1
Opportunity Assistant
AI Analysis
AI Generate
Classifications
Opportunity Classification
Sell Event