Description
Background
The San Joaquin Delta Community College District (District) is seeking to modernize its Stockton campus by updating network cabling for legacy buildings constructed in the 1970s.
The project aims to improve the aesthetic and functional aspects of the infrastructure by relocating existing cabling from surface-mounted conduits to within walls and above ceilings. This initiative is part of a broader effort supported by the Measure K Bond Program, which allocates $598 million for various facility improvements across the District.
Work Details
The Technology Cabling Project involves the following key tasks:
1. Upgrading network cabling, distributed antenna systems wiring, and audio/video surveillance wiring in legacy buildings at the Stockton campus, excluding five newer facilities.
2. Relocating existing cables from surface-mounted conduits to within walls and above ceilings to enhance aesthetics and infrastructure performance.
3. The project will be executed using a Design-Build Delivery method, which includes three phases: Collaboration Phase Services, Design through Agency Approval Phase Services, and Construction Phase Services. The estimated construction cost is $35 million.
Period of Performance
The project is expected to have a total duration of approximately 450 calendar days for construction, with an estimated substantial completion date set for August 2028.
Each phase of the project has specific durations: Collaboration Phase (90 days), Design to Agency Submission (90 days), Agency Review and Approval (120 days).
Place of Performance
The work will be performed at the San Joaquin Delta Community College District's Stockton campus located at 5151 Pacific Ave, Stockton, CA 95207.
Bidder Requirements
Bidders must be properly licensed as a Design-Build Entity (DBE) under California law and must comply with all applicable codes and regulations.
They are required to submit a Proposal Bond during the RFP phase and provide evidence of appropriate insurance coverage before commencing work during the Construction Phase.
The San Joaquin Delta Community College District (District) is seeking to modernize its Stockton campus by updating network cabling for legacy buildings constructed in the 1970s.
The project aims to improve the aesthetic and functional aspects of the infrastructure by relocating existing cabling from surface-mounted conduits to within walls and above ceilings. This initiative is part of a broader effort supported by the Measure K Bond Program, which allocates $598 million for various facility improvements across the District.
Work Details
The Technology Cabling Project involves the following key tasks:
1. Upgrading network cabling, distributed antenna systems wiring, and audio/video surveillance wiring in legacy buildings at the Stockton campus, excluding five newer facilities.
2. Relocating existing cables from surface-mounted conduits to within walls and above ceilings to enhance aesthetics and infrastructure performance.
3. The project will be executed using a Design-Build Delivery method, which includes three phases: Collaboration Phase Services, Design through Agency Approval Phase Services, and Construction Phase Services. The estimated construction cost is $35 million.
Period of Performance
The project is expected to have a total duration of approximately 450 calendar days for construction, with an estimated substantial completion date set for August 2028.
Each phase of the project has specific durations: Collaboration Phase (90 days), Design to Agency Submission (90 days), Agency Review and Approval (120 days).
Place of Performance
The work will be performed at the San Joaquin Delta Community College District's Stockton campus located at 5151 Pacific Ave, Stockton, CA 95207.
Bidder Requirements
Bidders must be properly licensed as a Design-Build Entity (DBE) under California law and must comply with all applicable codes and regulations.
They are required to submit a Proposal Bond during the RFP phase and provide evidence of appropriate insurance coverage before commencing work during the Construction Phase.
Loading Map
Loading Map
Overview
Opportunity ID
2026-RFQ-019
Response Deadline
July 1, 2026
Due in 29 Days
Date Posted
May 27, 2026
Source
Pre-Bid Conference
No pre-bid conference information was provided in the text.
Est. Value Range
Experimental
$35,000,000
(Agency Estimate)
Agency Distribution
Low
On 5/27/26 San Joaquin Delta College in California issued 2026 Technology Cabling Project with ID 2026-RFQ-019 due 7/1/26.