Search Contract Opportunities

RFP #2525H009 Alaska International Airport System (AIAS) Winter Storm Efficiency Study

ID: 216357 • State: Alaska
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading
Real Time Relevant State, Local, and Education Bids from all 50 States
Find Now

Description

Background
The Alaska International Airport System (AIAS), which includes Ted Stevens Anchorage International Airport (ANC) and Fairbanks International Airport (FAI), is seeking proposals for a Winter Storm Efficiency Study. The AIAS has faced significant disruptions in operations due to severe and unpredictable winter weather events, particularly snow, affecting both airports. The goal of this contract is to enhance the efficiency and safety of AIAS operations during these winter storm events.

The Department of Transportation & Public Facilities (DOT & PF) is issuing this solicitation to find an experienced contractor who can provide actionable recommendations based on assessments and analyses.

Work Details
The contractor will conduct an assessment of existing policies and procedures, perform various cost-benefit analyses, modeling, optimization, and feasibility studies at AIAS airports. Deliverables include:
1) AIAS Winter Storm Emergency Management Plan;
2) Cost-benefit Analysis of Aircraft Control Mechanisms;
3) Inventory assessment for snow removal resources;
4) Assessment of Existing Operational Controls;
5) Review of Operating Agreement provisions;
6) Cost-benefit analysis comparing aircraft diversion strategies;
7) ANC Landside Snow Removal Study;
8) ANC Ramp Management Plan.

Phase 2 deliverables are optional and include long-term studies on airside parking and snow storage, feasibility studies on snow fleet reconfiguration, technological approaches for snow management, and proposals for airport-specific job classes.

Period of Performance
The initial contract term will be from approximately September 17, 2024, through December 17, 2024. Phase 1 deliverables must be completed by December 17, 2024. There is an option for a six-month renewal for Phase 2 deliverables until June 30, 2025.

Place of Performance
The work will be performed at the Alaska International Airport System locations in Anchorage and Fairbanks.

Overview

Opportunity ID
216357
Version
1
Response Deadline
Sept. 9, 2024 Past Due
Date Posted
Aug. 9, 2024
Source

Est. Value Range
Experimental
$500,000 - $1,500,000 (AI estimate)
Agency Distribution
High
On 8/9/24 Transportation and Public Facilities in Alaska issued RFP #2525H009 Alaska International Airport System (AIAS) Winter Storm Efficiency Study with ID 216357 due 9/8/24.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for RFP #2525H009 Alaska International Airport System (AIAS) Winter Storm Efficiency Study

Opportunity Assistant


AI Analysis

AI Generate

Additional Details

Category
Procurement
Location
Statewide

Similar Active Opportunities