W9126G26DA017
Indefinite Delivery Contract
Overview
Government Description
Sdvosb vertical MATOC for military construction (MILCON), Sustainment Restoration And Maintenance
(SRM), and International And Interagency Services (IIS) for Design-Build (DB) and Design Bid Build (DBB) projects
Awardee
Awarding / Funding Agency
Pricing
Order Dependent (IDV Only)
Set Aside
Service Disabled Veteran Owned Small Business Set-Aside (SDVOSBC)
Extent Competed
Full And Open Competition After Exclusion Of Sources
Multiple / Single Award
Multiple Award
Who Can Use
Single Agency
Individual Order Limit
$17,000,000
Vehicle Ceiling
$102,120,000 (8% Used)
Related Opportunity
Analysis Notes
Place of Performance Largest percentage of work under issued task orders completed at: El Paso, Texas 79906 United States.
RED Eagle 2 JV was awarded
Indefinite Delivery Contract W9126G26DA017 (W9126G-26-D-A017)
by
USACE Fort Worth District
in April 2026.
The IDC
has a duration of 5 years and
was awarded
through solicitation W9126G20R0049 SDVOSB Vertical MATOC
with a Service Disabled Veteran Owned Small Business set aside
with
NAICS 236220 and
PSC Y1JZ
via direct negotiation acquisition procedures with 15 bids received.
To date, $8,009,970 has been obligated through this vehicle.
The total ceiling is $102,120,000, of which 8% has been used.
DOD Announcements
Apr 2026:
Red Eagle 2 JV, Coweta, Oklahoma (W9126G-26-D-A017); Coactint-APC Design Build LLC, Mandeville, Louisiana (W9126G-26-C-A018); ESA South Inc., Cantonment, Florida (W9126G-26-D-A019); Four Winds Mechanical HTC/AC Inc., Albuquerque, New Mexico (W9126G-26-D-A020); Valiant Construction LLC, Louisville, Kentucky (W9126G-26-D-A021); and Yerkes South Inc., Crestview, Florida (W9126G-26-D-A022), will compete for each order of the $102,120,000 firm-fixed-price contract for fixed-price design-build and design-bid-build vertical construction task orders in support of the U.S. Army Corps of Engineers Southwestern Division. This total cumulative face value is $102,120,000. Bids were solicited via the internet with 15 received. Work locations and funding will be determined with each order, with an estimated completion date of April 29, 2031. U.S. Army Corps of Engineers, Fort Worth District, is the contracting activity.
Status
(Open)
Modified 5/21/26
Period of Performance
4/29/26
Start Date
4/29/31
Ordering Period End Date
Task Order Obligations
$8.0M
Total Obligated
$8.0M
Current Award
$8.0M
Potential Award
Federal Award Analysis
Historical federal task order obligations under W9126G26DA017
$-
Contracts
$-
Subcontracts
$-
Grants
$-
Subgrants
$-
Total
No Results
Calculating
Calculating
No Results
Calculating
Calculating
No Results
Calculating
Calculating
| Year | Contracts | Subcontracts | Grants | Subgrants |
|---|
No Results
Calculating
Calculating
No Results
Calculating
Calculating
Contract Awards
Prime task orders awarded under W9126G26DA017
Subcontract Awards
Disclosed subcontracts for W9126G26DA017
Opportunity Lifecycle
Procurement history for W9126G26DA017
Transaction History
Modifications to W9126G26DA017
People
Suggested agency contacts for W9126G26DA017
Competition
Number of Bidders
15
Solicitation Procedures
Negotiated Proposal/Quote
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No
Other Categorizations
Subcontracting Plan
Plan Not Required
Cost Accounting Standards
Exempt
Business Size Determination
Small Business
DoD Claimant Code
None
Awardee UEI
E2C2S97ZA3D3
Awardee CAGE
9MUG8
Agency Detail
Awarding Office
W9126G W076 ENDIST FT WORTH
Funding Office
W45XMA W2SU ENDIST FORT WORTH CW
Created By
joshua.w.robinson@acws
Last Modified By
kevin.s.anderson.civ@sa
Approved By
nicholas.i.johnston@acws
Legislative
Legislative Mandates
Construction Wage Rate Requirements
None Applicable
Awardee District
OK-01
Senators
James Lankford
Markwayne Mullin
Markwayne Mullin
Representative
Kevin Hern
Last Modified: 5/21/26