N0001924G0010
Basic Ordering Agreement
Overview
Government Description
F-35 lightning II - new BOA. Replaces BOA N0001919G0010. This agreement supports a range of work including research and development for power and thermal management solutions, engine core upgrade integration for F135 engines, redesign of helmet mounted display system components, procurement of initial air vehicle spares, engineering and technical support for flight test instrumentation modifications, landing gear design and analysis, acquisition of aircraft armament equipment for aargm-er, program management for diminishing manufacturing sources and material shortages, development of nextgen open mission services software, and redesign activities for sensor electronics circuit card assemblies for the F-35 joint strike fighter program. Tasks also include software upgrades, technical training, depot training, production yield improvement testing, and systems modernization efforts for the Air Force, Marine Corps, Navy, foreign military sales customers, and F-35 cooperative program partners.
Awardee
Awarding Agency
Funding Agency
PSC
Pricing
Order Dependent (IDV Only)
Set Aside
None
Extent Competed
Not Reported
Multiple / Single Award
Single Award
Who Can Use
Single Agency
Vehicle Ceiling
$2,000,000 (>100% Used)
Related Opportunity
None
Analysis Notes
Place of Performance Largest percentage of work under issued task orders completed at: Fort Worth, Texas 76108 United States.
Ceiling Exceeded Total obligated funds of $2,695,644,362 has exceeded the reported contract ceiling of $2,000,000. This may prevent future funds from being obligated to this basic ordering agreement. Note, however, that the government can often amend the ceiling to allow for additional awards or in some cases may not have properly updated the ceiling in public records.
Ceiling Exceeded Total obligated funds of $2,695,644,362 has exceeded the reported contract ceiling of $2,000,000. This may prevent future funds from being obligated to this basic ordering agreement. Note, however, that the government can often amend the ceiling to allow for additional awards or in some cases may not have properly updated the ceiling in public records.
Lockheed Martin Corporation was awarded
Basic Ordering Agreement N0001924G0010 (N00019-24-G-0010)
by
Naval Air Systems Command
for F-35 Lightning II Basic Ordering Agreement (BOA)
in March 2024.
The BOA
has a duration of 5 years and
was awarded
full & open
with
NAICS 336411 and
PSC AC15
via undisclosed acquisition procedures.
To date, $2,901,323,459 has been obligated through this vehicle with a potential value of all existing task orders of $2,903,805,558.
The total ceiling is $2,000,000, of which 101% has been used.
As of today, the BOA has a total reported backlog of $208,161,196 and funded backlog of $205,679,097.
DOD Announcements
Apr 2024:
Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a not-to-exceed $11,470,144 undefinitized cost-plus-fixed-fee order (N0001924F2584) against a previously issued basic ordering agreement (N0001924G0010). This order provides for the redesign of the relay optical assembly on the F-35 Gen III Helmet Mounted Display System in support of the F-35 program for the Air Force, Navy, Marine Corps, and non-Department of Defense (DOD) participants. Work will be performed in Fort Worth, Texas, and is expected to be completed in January 2025. Fiscal 2024 aircraft procurement (Navy) funds in the amount of $2,298,307; fiscal 2024 aircraft procurement (Air Force) funds in the amount of $2,298,307; and non-DOD participant funds in the amount of $1,023,756 will be obligated at the time of award, none of which will expire at the end of the current fiscal year. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Jun 2024: Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a not-to-exceed $97,000,000 undefinitized, fixed-fee order (N0001924F1043) against a previously issued basic ordering agreement (N0001924G0010). This advance acquisition contract procures aircraft armament equipment such as internal adapters and weapon umbilical cables required to employ long-range strike weapons. The procured aircraft armament equipment allows for internal carriage and employment of the Advanced Anti-Radiation Guided Missile – Extended Range weapon for F-35 Lightning II aircraft for the Air Force, Marine Corps, Navy, Foreign Military Sales (FMS) customers, and non-U.S. Department of Defense (DOD) program participants. Work will be performed in Fort Worth, Texas, and is expected to be completed in February 2028. Fiscal 2024 aircraft procurement (Air Force) funds in the amount of $42,342,963; fiscal 2024 aircraft procurement (Navy) funds in the amount of $17,536,564; fiscal 2023 aircraft procurement (Navy) funds in the amount of $32,151,670; FMS customer funds in the amount of $1,296,243 and non-U.S DOD participant funds in the amount of $3,672,560, will be obligated at the time of award, none of which will expire at the end of the current fiscal year. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Jun 2024: Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $31,216,902 cost-plus-fixed-fee order (N0001924F1828) against a previously issued basic ordering agreement (N0001924G0010). This order provides production and non-recurring engineering support for landing gear design, redesign, and analysis, to include analysis of aircraft component deficiencies, known or identified, to impact the ability to produce and deliver F-35 landing and arresting gear system to product specifications, as well as engineering efforts required to implement change requests to correct component deficiencies for production line cut-in and engineering release to support all three F-35 variants. Work will be performed in Fort Worth, Texas, and is expected to be completed in January 2025. Fiscal 2024 research, development, test and evaluation (Navy) funds in the amount of $2,218,835; and fiscal 2022 operations and maintenance (Navy) $15,033,743, will be obligated at the time of award, of which $15,033,743 will expire at the end of the current fiscal year. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Jul 2024: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded an $8,709,705 cost-plus-fixed-fee order (N0001924F1800) against a previously issued basic ordering agreement (N0001924G0010). This order provides non-recurring engineering and technical support required for flight test instrumentation de-modification of the three operational test aircraft from their current configuration to an export releasable configuration, in support of the Joint Strike Fighter Program for the United Kingdom. Work will be performed in Fort Worth, Texas (70%); and Edwards Air Force Base, California (30%), and is expected to be completed in March 2026. Cooperative Program Partner funds in the amount of $8,709,705 will be obligated at the time of award, none of which will expire at the end of the current fiscal year. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Sep 2024: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas is awarded a not-to-exceed $348,463,185 undefinitized, cost-plus-fixed-fee order (N0001924F1057) against a previously issued basic ordering agreement (N0001924G0010). This contract procures initial air vehicle spares for the production Lot 18 aircraft to include basic spares pool/global spares pool spares shared between the involved customers, customer specific afloat spares pool/deployable spares pool as well as associated support and consumables to meet immediate maintenance needs of the Joint Strike Fighter Program for the Navy, Air Force, Marine Corp, Foreign Military Sales (FMS) customers, and non-U.S. Department of Defense (DOD) participants. Work will be performed in Fort Worth, Texas, and is expected to be completed in October 2029. Fiscal 2024 aircraft procurement (Air Force) funds in the amount of $113,506,605; fiscal 2024 aircraft procurement (Navy) funds in the amount of $63,281,415; non-U.S. DOD participant funds in the amount of $13,883,920; and FMS customer funding in the amount of $155,182,285, will be obligated at the time of award, none of which will expire at the end of the current fiscal year. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Dec 2024: Lockheed Martin Corp., Lockheed Martin Aeronautics, Fort Worth, Texas, is awarded a not-to-exceed $107,043,651 undefinitized, cost-plus-fixed-fee order (N0001925F0120) against a previously issued basic ordering agreement (N0001924G0010). This order provides for research and development efforts for trade studies and alternative assessment of all potential power and thermal management solutions, as well as required engine core upgrade block four integration efforts in support of F135 engines upgrades for the F-35 Joint Strike Fighter aircraft for the Air Force, Marine Corps, Navy, Foreign Military Sale customers, and F-35 Cooperative Program Partners. Work will be performed in Fort Worth, Texas (47%); Torrance, California (13%); El Segundo, California (6%); Blackburn, Great Britain (6%); Cheltenham, Great Britain (6%); Windsor Locks, Connecticut (4%); Haltom City, Texas (4%); South Bend, Indiana (4%); West Hartford, Connecticut (4%); Rockford, Illinois (4%); and Orlando, Florida (2%), and is expected to be completed in December 2026. Fiscal 2024 research, development, test and evaluation (Air Force) funds in the amount of $14,371,979; fiscal 2024 research, development, test and evaluation (Navy) funds in the amount of $14,371,978; and F-35 cooperative program partner funds in the amount of $6,401,843, will be obligated at the time of award, $28,743,957 of which will expire at the end of the current fiscal year. This order was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Jan 2025: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, was awarded a $41,646,305 cost-plus-fixed-fee order (N0001925F0137) against a previously issued basic ordering agreement (N0001924G0010). This order procures engineering, integration support, hardware, and installation support for flight test instrumentation modifications to F-35 production aircraft. This flight test instrumentation will support test and evaluation flight tests. Work will be performed in Fort Worth, Texas (81%); Orlando, Florida (7%); Linthicum, Maryland (3%); Nashua, New Hampshire (3%); San Diego, California (2%); El Segundo, California (2%); Samlesbury, United Kingdom (1%); and other various locations within and outside of the continental U.S. (1%), and will be completed in March 2028. Fiscal 2025 research, development, test, and evaluation (Air Force) funds in the amount of $1,850,000; fiscal 2025 research, development, test, and evaluation (Navy) funds in the amount of $925,000; fiscal 2025 research, development, test and evaluation (Marine Corps) funds in the amount of $925,000; and non-U.S. Department of Defense F-35 Cooperative Program Partners funds in the amount of $3,559,793, will be obligated at the time of award, none of which will expire at the end of the current fiscal year. This contract was not competed. Naval Air Systems Command, Patuxent River, Maryland is the contracting activity.
Jul 2025: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded an undefinitized contract action with a not-to-exceed value of $578,729,839, firm-fixed-price order (N0001925F0090) against a previously issued basic ordering agreement (N0001924G0010). This order procures fiscal 2025 F-35 air vehicle initial spares. The subject contract procures basic spares pool and global spares pool spares shared between the customers involved, customer specific afloat spares pool and deployable spares pool, and support labor. These initial spares are necessary to meet immediate maintenance needs and ensure the U.S. services, Collaborative Program Partner nations, and Foreign Military Sales (FMS) customers have mission capable aircraft. Work will be performed in Fort Worth, Texas (100%), and is expected to be completed in June 2030. Fiscal 2025 aircraft procurement (Air Force) funds in the amount of $148,743,106; fiscal 2025 aircraft procurement (Marine Corps) funds in the amount of $58,473,883; fiscal 2025 aircraft procurement (Navy) funds in the amount of $21,551,619; fiscal 2024 aircraft procurement (Air Force) funds in the amount of $8,519,727; fiscal 2024 aircraft procurement (Marine Corps) funds in the amount of $3,495,556; fiscal 2024 aircraft procurement (Navy) funds in the amount of $1,876,609; fiscal 2023 aircraft procurement (Air Force) funds in the amount of $4,306,095; fiscal 2023 aircraft procurement (Navy) funds in the amount of $7,061,999; international partner funding in the amount of $43,292,470; and FMS funds in the amount of $241,095,906, will be obligated at the time of award, $11,360,000 of which will expire at the end of the current fiscal year. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Aug 2025: Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $22,662,794 cost-plus-fixed-fee order (N0001925F0264) against a previously issued basic ordering agreement (N0001924G0010). This order provides program management support to include technical, financial, and administrative data in support of identification of F-35 production and sustainment diminishing manufacturing sources and material shortages events for the Air Force, Marine Corps, Navy, and non-Department of Defense (DOD) participants. Work will be performed in Fort Worth, Texas, and is expected to be completed in December 2025. Fiscal 2023 aircraft procurement (Air Force) funds in the amount of $9,298,433; fiscal 2023 aircraft procurement (Navy) funds in the amount of $9,298,432; and non-DOD participant funds in the amount of $4,065,929, will be obligated at the time of award, $18,596,865 of which will expire at the end of the current fiscal year. This contract action was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Sep 2025: Lockheed Martin Aeronautics Co., Fort Worth, Texas, was awarded a $32,033,201 cost-plus-fixed-fee order (N0001925F2083) against a previously issued basic ordering agreement (N0001924G0010). This order provides for the design, development, and establishment of the F-35 NextGen Open Mission services in support of the Mission Planning Enterprise Software, encompassing the usage of modern cloud-based technologies and modern software methodologies for the Joint Strike Fighter Program. Work will be performed in Fort Worth, Texas and is expected to be completed in February 2028. Fiscal 2024 research, development, test and evaluation (Air Force) funds in the amount of $2,000,000; fiscal 2024 research, development, test and evaluation (Navy) funds in the amount of $2,000,000; and non-Department of Defense participant funds in the amount of $890,878, will be obligated at the time of award, $4,000,000 of which will expire at the end of the current fiscal year. This contract action was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. (Awarded Sept. 11, 2025)
Sep 2025: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a not-to-exceed $34,266,559 modification (P00002) to an undefinitized firm-fixed-price order (N0001925F0090) against a previously issued basic ordering agreement (N0001924G0010). This modification adds scope to provide F-35 air vehicle initial spares to meet immediate maintenance needs and ensure the Air Force, Marine Corps, and Navy have mission capable aircraft. Work will be performed in Fort Worth, Texas, and is expected to be completed in June 2030. Fiscal 2025 aircraft procurement (Navy) funds in the amount of $20,074,884; and fiscal 2025 aircraft procurement (Air Force) funds in the amount of $14,191,675, will be obligated at the time of award, none of which will expire at the end of the current fiscal year. This order was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Sep 2025: Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $11,618,620 firm-fixed-price order (N0001925F0958) against a previously issued basic ordering agreement (N0001924G0010). This order provides for the redesign of the Sensor Electronics circuit card assembly in support of resolving the NextGen Electro Optical Distributed Aperture System diminishing manufacturing sources and material shortages redesign for the F-35 Lightning II for the Air Force, Marine Corps, Navy, and F35 cooperative program partners. Work will be performed in Fort Worth, Texas and is expected to be completed in July 2027. Fiscal 2023 aircraft procurement (Air Force) funds in the amount of $4,760,649; fiscal 2023 aircraft procurement (Navy) funds in the amount of $4,760,649; and cooperative program partners funds in the amount of $2,097,321, will be obligated at the time of award, $9,521,299 of which will expire at the end of the current fiscal year. This order was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Dec 2025: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $373,405,947 a modification (P00004) to a cost-plus-fixed-fee, firm-fixed-price order (N0001925F2558) against a previously issued basic ordering agreement (N0001924G0010). This modification adds scope to procure material, special tooling and test equipment necessary to build, deliver, and install the required modification kits to enable retrofitting aircraft, as well as provides program management, non-recurring engineering, aircraft induction, contractor field modification installations, depot site support, F-35B/F-35C laser shock peening site support, and regional depot modification installations in support of modification and retrofit activities for the F-35 Joint Strike Fighter program for the Air Force, Marine Corps, Navy, Foreign Military Sales (FMS) and non-U.S. Department of Defense (DoD) participants. Work will be performed in Fort Worth, Texas and is expected to be completed in December 2026. Fiscal 2024 aircraft procurement (Air Force) funds in the amount of $92,562,436; fiscal 2024 aircraft procurement (Navy) funds in the amount of $37,842,250; fiscal 2025 aircraft procurement (Navy) funds in the amount of $1,389,876; fiscal 2025 aircraft procurement (Air Force) funds in the amount of $718,556; fiscal 2026 aircraft procurement (Air Force) funds in the amount of $35,092,376; fiscal 2026 procurement (Navy) funds in the amount of $18,782,546; FMS funds in the amount of $56,053,178; and non-U.S. Dod participant funds in the amount of $131,034,729 will be obligated at the time of award, $130,404,686 of which will expire at the end of the current fiscal year. This contract action was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Mar 2026: Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $111,500,000 firm-fixed-price order (N0001926F0203) against a previously issued basic ordering agreement (N0001924G0010). This order procures F-35 Drag Chute System in support of Lot 18-19 aircraft delivery in support of Non-U.S. DOW Participants and Foreign Military Sales (FMS) customer's operational aircraft. Work will be performed in Fort Worth, Texas, and is expected to be completed in October 2030. FMS funds in the amount of $100,091,464; and cooperative program partners funds in the amount of $11,408,536, will be obligated at the time of award, none of which will expire at the end of the current fiscal year. This order was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity
Apr 2026: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $17,519,461 modification (P00006) to a cost-plus-fixed-fee, firm-fixed-price order (N0001925F2558) against a previously issued basic ordering agreement (N0001924G0010). This modification adds scope to procure material modification kits and special test and tooling equipment necessary to support retrofit and modification efforts for the F-35 Joint Strike Fighter program for the Air Force, Marine Corps, Navy, Foreign Military Sales, and non-U.S. Department of War (DOW) participants. Work will be performed in Fort Worth, Texas, and is expected to be completed in December 2028. Fiscal 2024 aircraft procurement (Navy) funds in the amount of $5,029,653; fiscal 2025 aircraft procurement (Navy) funds in the amount of $4,120,008; fiscal 2025 aircraft procurement (Air Force) funds in the amount of $4,635,895; and non-U.S. DOW participant funds in the amount of $3,733,905, will be obligated at the time of award, $5,029,653 of which will expire at the end of the current fiscal year. This contract action was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
May 2026: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $14,545,797 cost-plus-incentive-fee order (N0001926F0304) against a previously issued basic ordering agreement (N0001924G0010). This order provides for the procurement and installation of flight test instrumentation on CF-5 wings to mitigate the F-35 testing capability gap in support of carrier-variant ship suitability flight testing, bridging test capacity until the flight sciences aircraft are delivered. Work will be performed in Fort Worth, Texas (81%); Orlando, Florida (7%); Linthicum, Maryland (3%); Nashua, New Hampshire (3%); San Diego, California (2%); El Segundo, California (2%); Samlesbury, United Kingdom (1%); various locations within the continental U.S (CONUS) (1%); and various locations outside CONUS (1%), and is expected to be completed in May 2028. Fiscal 2025 research, development, test and evaluation (Navy) funds in the amount of $4,000,000 will be obligated at the time of award, none of which will expire at the end of the current fiscal year. This contract action was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
May 2026: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $991,127,074 firm-fixed-price order (N0001926F0301) against a previously issued basic ordering agreement (N0001924G0010). This order provides for the production and delivery of 432 material modification kits (97 for the Air Force, 54 for the Marines, 42 for the Navy, 106 for Foreign Military Sales (FMS) customers, and 133 for non-U.S. Department of War (DOW) participants) in support of F-35 Joint Strike Fighter aircraft modifications and retrofit efforts associated with modernization of the electronic warfare system and related capability upgrades. Work will be performed in Fort Worth, Texas, and is expected to be completed by March 2032. Fiscal 2026 aircraft procurement (Air Force) funds in the amount of $82,150,190; fiscal 2026 aircraft procurement (Navy) funds in the amount of $115,048,244; fiscal 2025 aircraft procurement (Air Force) funds in the amount of $140,758,499; fiscal 2025 aircraft procurement (Navy) funds in the amount of $75,306,828; fiscal 2024 aircraft procurement (Navy) funds in the amount of $29,999,052; FMS customers funds in the amount of $288,825,371; and non-U.S. DOW participants funds in the amount of $259,038,890, will be obligated at the time of award, $29,999,052 of which will expire at the end of the current fiscal year. This contract action was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
May 2026: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded an $879,098,832 firm-fixed-price order (N0001926F0233) against a previously issued basic ordering agreement (N0001924G0010). This order provides for the production and delivery of Lot 18-19 aircraft armament equipment which includes various missile launchers, bomb racks, gun systems, pylons, and adapters in support of ensuring the functionality and readiness of various armaments to support F-35 aircraft delivery schedules for the Air Force, Marine Corps, Navy, Foreign Military Sales (FMS) customers, and non-U.S. Department of War (DOW) participants. Work will be performed in Fort Worth, Texas, and is expected to be completed by February 2030. Fiscal 2026 aircraft procurement (Air Force) funds in the amount of $83,618,024; fiscal 2026 aircraft procurement (Navy) funds in the amount of $53,104,049; fiscal 2025 aircraft procurement (Navy) funds in the amount of $74,860,927; fiscal 2025 aircraft procurement (Air Force) funds in the amount of $37,345,787; fiscal 2024 aircraft procurement (Navy) funds in the amount of $79,203,534; fiscal 2024 aircraft procurement (Air Force) funds in the amount of $78,184,878; FMS customers funds in the amount of $333,601,044; and non-U.S. DOW participants funds in the amount of $139,180,588, will be obligated at the time if award, $157,388,412 of which will expire at the end of the current fiscal year. This contract action was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
May 2026: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $100,455,916 firm-fixed-price order (N0001926F0266) against a previously issued basic ordering agreement (N0001924G0010). This order procures 1,459 brake assembly heat sinks, including 1,075 for the F-35A Lightning II conventional takeoff and landing aircraft and 384 for the F-35B Lightning II short takeoff and vertical landing aircraft in support of depot-level brake repairs. This effort supports resolution of existing thermal management constraints, ensures the reliability of critical avionics, and supports forecasted fleet requirements for serviceable brakes to sustain warfighter operational requirements for the Air Force, Navy, Marine Corps, F-35 program partners, and Foreign Military Sales (FMS) customers. Work will be performed in South Bend, Indiana, and is expected to be completed by March 2030. Fiscal 2026 aircraft procurement (Air Force) funds in the amount of $43,795,721; fiscal 2026 aircraft procurement (Navy) funds in the amount of $28,597,475; FMS customer funds in the amount of $10,907,840; and F-35 program partner funds in the amount of $17,154,880, will be obligated at the time if award, none of which will expire at the end of the current fiscal year. This contract action was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Jul 2026: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $14,508,319 cost-plus-fixed-fee order (N0001926F2179) against a previously issued basic ordering agreement (N0001924G0010). This order provides comprehensive diminishing manufacturing sources and material shortages management services for the F-35 Joint Strike Fighter Air System, including supply chain monitoring, subcontractor oversight, obsolescence management, technology refresh planning, inventory assessments, and cost forecasting. This effort supports identification and mitigation of obsolete or unavailable parts and materials, preventing production disruptions and ensuring the long-term sustainment and operational readiness of the F-35 fleet in support of the Air Force, Navy, Marine Corps, and F-35 Program Partners. Work will be performed in Fort Worth, Texas (32.43%); Palm Bay, Florida (9.03%); Orlando, Florida (8.44%); San Diego, California (7.23%); El Segundo, California (4.11%); Owego, New York, (4.1%); Cedar Rapids, Iowa, (3.86%); Elma, New York (2%); McKinney, Texas (2%); Nashua, New Hampshire (1.97%); Rolling Meadows, Illinois (1.52%); Alpharetta, Georgia (1.15%); various locations within the continental U.S (20.16%); and various locations outside the continental U.S. (2.0%), and is expected to be completed by December 2031. Fiscal 2025 aircraft procurement (Air Force) funds in the amount of $5,932,808; fiscal 2025 aircraft procurement (Navy) funds in the amount of $5,932,807; and F-35 program partner funds in the amount of $2,642,704, will be obligated at the time if award, none of which will expire at the end of the current fiscal year. This contract was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Jul 2026: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $1,603,067,858 firm-fixed-price order (N0001926F2171) against a previously issued basic ordering agreement (N0001924G0010). This order procures initial spares for F-35 production aircraft to support the global and base spares pools, afloat spares packages, and deployment spares packages for the Air Force, Marine Corps, Navy, F-35 program partner, and Foreign Military Sales (FMS) customers. Work will be performed in Fort Worth, Texas, and is expected to be completed by September 2033. Fiscal 2026 aircraft procurement (Air Force) funds in the amount of $754,705,797; fiscal 2026 aircraft procurement (Navy) funds in the amount of $223,126,752; F-35 program partner funds in the amount of $138,793,588; and FMS funds in the amount of $486,441,721, will be obligated at the time if award. This contract was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Jul 2026: Lockheed Martin Corp., Fort Worth, Texas, is awarded a $23,082,803 cost-plus-fixed-fee order (N0001926F2197) against a previously issued basic ordering agreement (N0001924G0010). This order provides engineering and technical services, depot activation support, and material lay-in to establish and activate F-35 national air vehicle depots for Foreign Military Sales (FMS) customers. These efforts support the development of long-term aircraft sustainment and maintenance, repair, overhaul, and upgrade capabilities by procuring depot maintenance activation plans for the governments of Finland and Switzerland, and depot activation services and initial induction material for the Republic of Korea. Work will be performed in Fort Worth, Texas (68%); Cheongju, Korea (17%); Emmen, Switzerland (6%); Halli, Finland (6%); Seoul, Korea (2%), and Helsinki, Finland (1%) and is expected to be completed by December 2028. FMS customer funds in the amount of $23,082,803 will be obligated at the time of award. This contract was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Aug 2026: Lockheed Martin Corp., Fort Worth, Texas, is awarded a not-to-exceed $20,164,487 modification (P00001) to an undefinitized firm-fixed-price order (N0001926F2171) under a previously issued basic ordering agreement (N0001924G0010). This modification adds scope to procure afloat spares packages and deployment spares packages for air vehicle initial spares in support of F-35 production aircraft for the government of the Netherlands. Work will be performed in Fort Worth, Texas, and is expected to be completed in July 2033. F-35 cooperative program partners funds in the amount of $20,164,487 will be obligated at the time of award. This contract was not competed. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Aug 2026: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $24,128,282 modification (P00008) to a cost-plus-fixed-fee, firm-fixed-price order (N0001925F2558) against a previously issued basic ordering agreement (N0001924G0010). This modification adds scope for the procurement of material modification kits, special test and tooling equipment, aircraft induction, depot site support, and regional depot modification installations necessary to support F-35 Joint Strike Fighter aircraft retrofit and modification efforts for the Air Force, Marine Corps, Navy, Foreign Military Sales (FMS), and non-U.S. Department of War (DOW) participants. Work will be performed in Fort Worth, Texas, and is expected to be completed in October 2028. Fiscal 2024 aircraft procurement (Air Force) funds in the amount of $30,440; fiscal 2024 aircraft procurement (Navy) funds in the amount of $2,615,826; fiscal 2025 aircraft procurement (Air Force) funds in the amount of $5,450,402; fiscal 2026 aircraft procurement (Air Force) funds in the amount of $1,266,039; fiscal 2026 aircraft procurement (Navy) funds in the amount of $2,559,538; non-U.S. DOW participant funds in the amount of $9,096,785; and FMS customer funds in the amount of $3,109,252, will be obligated at the time of award. This contract was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Jun 2024: Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a not-to-exceed $97,000,000 undefinitized, fixed-fee order (N0001924F1043) against a previously issued basic ordering agreement (N0001924G0010). This advance acquisition contract procures aircraft armament equipment such as internal adapters and weapon umbilical cables required to employ long-range strike weapons. The procured aircraft armament equipment allows for internal carriage and employment of the Advanced Anti-Radiation Guided Missile – Extended Range weapon for F-35 Lightning II aircraft for the Air Force, Marine Corps, Navy, Foreign Military Sales (FMS) customers, and non-U.S. Department of Defense (DOD) program participants. Work will be performed in Fort Worth, Texas, and is expected to be completed in February 2028. Fiscal 2024 aircraft procurement (Air Force) funds in the amount of $42,342,963; fiscal 2024 aircraft procurement (Navy) funds in the amount of $17,536,564; fiscal 2023 aircraft procurement (Navy) funds in the amount of $32,151,670; FMS customer funds in the amount of $1,296,243 and non-U.S DOD participant funds in the amount of $3,672,560, will be obligated at the time of award, none of which will expire at the end of the current fiscal year. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Jun 2024: Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $31,216,902 cost-plus-fixed-fee order (N0001924F1828) against a previously issued basic ordering agreement (N0001924G0010). This order provides production and non-recurring engineering support for landing gear design, redesign, and analysis, to include analysis of aircraft component deficiencies, known or identified, to impact the ability to produce and deliver F-35 landing and arresting gear system to product specifications, as well as engineering efforts required to implement change requests to correct component deficiencies for production line cut-in and engineering release to support all three F-35 variants. Work will be performed in Fort Worth, Texas, and is expected to be completed in January 2025. Fiscal 2024 research, development, test and evaluation (Navy) funds in the amount of $2,218,835; and fiscal 2022 operations and maintenance (Navy) $15,033,743, will be obligated at the time of award, of which $15,033,743 will expire at the end of the current fiscal year. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Jul 2024: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded an $8,709,705 cost-plus-fixed-fee order (N0001924F1800) against a previously issued basic ordering agreement (N0001924G0010). This order provides non-recurring engineering and technical support required for flight test instrumentation de-modification of the three operational test aircraft from their current configuration to an export releasable configuration, in support of the Joint Strike Fighter Program for the United Kingdom. Work will be performed in Fort Worth, Texas (70%); and Edwards Air Force Base, California (30%), and is expected to be completed in March 2026. Cooperative Program Partner funds in the amount of $8,709,705 will be obligated at the time of award, none of which will expire at the end of the current fiscal year. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Sep 2024: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas is awarded a not-to-exceed $348,463,185 undefinitized, cost-plus-fixed-fee order (N0001924F1057) against a previously issued basic ordering agreement (N0001924G0010). This contract procures initial air vehicle spares for the production Lot 18 aircraft to include basic spares pool/global spares pool spares shared between the involved customers, customer specific afloat spares pool/deployable spares pool as well as associated support and consumables to meet immediate maintenance needs of the Joint Strike Fighter Program for the Navy, Air Force, Marine Corp, Foreign Military Sales (FMS) customers, and non-U.S. Department of Defense (DOD) participants. Work will be performed in Fort Worth, Texas, and is expected to be completed in October 2029. Fiscal 2024 aircraft procurement (Air Force) funds in the amount of $113,506,605; fiscal 2024 aircraft procurement (Navy) funds in the amount of $63,281,415; non-U.S. DOD participant funds in the amount of $13,883,920; and FMS customer funding in the amount of $155,182,285, will be obligated at the time of award, none of which will expire at the end of the current fiscal year. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Dec 2024: Lockheed Martin Corp., Lockheed Martin Aeronautics, Fort Worth, Texas, is awarded a not-to-exceed $107,043,651 undefinitized, cost-plus-fixed-fee order (N0001925F0120) against a previously issued basic ordering agreement (N0001924G0010). This order provides for research and development efforts for trade studies and alternative assessment of all potential power and thermal management solutions, as well as required engine core upgrade block four integration efforts in support of F135 engines upgrades for the F-35 Joint Strike Fighter aircraft for the Air Force, Marine Corps, Navy, Foreign Military Sale customers, and F-35 Cooperative Program Partners. Work will be performed in Fort Worth, Texas (47%); Torrance, California (13%); El Segundo, California (6%); Blackburn, Great Britain (6%); Cheltenham, Great Britain (6%); Windsor Locks, Connecticut (4%); Haltom City, Texas (4%); South Bend, Indiana (4%); West Hartford, Connecticut (4%); Rockford, Illinois (4%); and Orlando, Florida (2%), and is expected to be completed in December 2026. Fiscal 2024 research, development, test and evaluation (Air Force) funds in the amount of $14,371,979; fiscal 2024 research, development, test and evaluation (Navy) funds in the amount of $14,371,978; and F-35 cooperative program partner funds in the amount of $6,401,843, will be obligated at the time of award, $28,743,957 of which will expire at the end of the current fiscal year. This order was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Jan 2025: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, was awarded a $41,646,305 cost-plus-fixed-fee order (N0001925F0137) against a previously issued basic ordering agreement (N0001924G0010). This order procures engineering, integration support, hardware, and installation support for flight test instrumentation modifications to F-35 production aircraft. This flight test instrumentation will support test and evaluation flight tests. Work will be performed in Fort Worth, Texas (81%); Orlando, Florida (7%); Linthicum, Maryland (3%); Nashua, New Hampshire (3%); San Diego, California (2%); El Segundo, California (2%); Samlesbury, United Kingdom (1%); and other various locations within and outside of the continental U.S. (1%), and will be completed in March 2028. Fiscal 2025 research, development, test, and evaluation (Air Force) funds in the amount of $1,850,000; fiscal 2025 research, development, test, and evaluation (Navy) funds in the amount of $925,000; fiscal 2025 research, development, test and evaluation (Marine Corps) funds in the amount of $925,000; and non-U.S. Department of Defense F-35 Cooperative Program Partners funds in the amount of $3,559,793, will be obligated at the time of award, none of which will expire at the end of the current fiscal year. This contract was not competed. Naval Air Systems Command, Patuxent River, Maryland is the contracting activity.
Jul 2025: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded an undefinitized contract action with a not-to-exceed value of $578,729,839, firm-fixed-price order (N0001925F0090) against a previously issued basic ordering agreement (N0001924G0010). This order procures fiscal 2025 F-35 air vehicle initial spares. The subject contract procures basic spares pool and global spares pool spares shared between the customers involved, customer specific afloat spares pool and deployable spares pool, and support labor. These initial spares are necessary to meet immediate maintenance needs and ensure the U.S. services, Collaborative Program Partner nations, and Foreign Military Sales (FMS) customers have mission capable aircraft. Work will be performed in Fort Worth, Texas (100%), and is expected to be completed in June 2030. Fiscal 2025 aircraft procurement (Air Force) funds in the amount of $148,743,106; fiscal 2025 aircraft procurement (Marine Corps) funds in the amount of $58,473,883; fiscal 2025 aircraft procurement (Navy) funds in the amount of $21,551,619; fiscal 2024 aircraft procurement (Air Force) funds in the amount of $8,519,727; fiscal 2024 aircraft procurement (Marine Corps) funds in the amount of $3,495,556; fiscal 2024 aircraft procurement (Navy) funds in the amount of $1,876,609; fiscal 2023 aircraft procurement (Air Force) funds in the amount of $4,306,095; fiscal 2023 aircraft procurement (Navy) funds in the amount of $7,061,999; international partner funding in the amount of $43,292,470; and FMS funds in the amount of $241,095,906, will be obligated at the time of award, $11,360,000 of which will expire at the end of the current fiscal year. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Aug 2025: Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $22,662,794 cost-plus-fixed-fee order (N0001925F0264) against a previously issued basic ordering agreement (N0001924G0010). This order provides program management support to include technical, financial, and administrative data in support of identification of F-35 production and sustainment diminishing manufacturing sources and material shortages events for the Air Force, Marine Corps, Navy, and non-Department of Defense (DOD) participants. Work will be performed in Fort Worth, Texas, and is expected to be completed in December 2025. Fiscal 2023 aircraft procurement (Air Force) funds in the amount of $9,298,433; fiscal 2023 aircraft procurement (Navy) funds in the amount of $9,298,432; and non-DOD participant funds in the amount of $4,065,929, will be obligated at the time of award, $18,596,865 of which will expire at the end of the current fiscal year. This contract action was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Sep 2025: Lockheed Martin Aeronautics Co., Fort Worth, Texas, was awarded a $32,033,201 cost-plus-fixed-fee order (N0001925F2083) against a previously issued basic ordering agreement (N0001924G0010). This order provides for the design, development, and establishment of the F-35 NextGen Open Mission services in support of the Mission Planning Enterprise Software, encompassing the usage of modern cloud-based technologies and modern software methodologies for the Joint Strike Fighter Program. Work will be performed in Fort Worth, Texas and is expected to be completed in February 2028. Fiscal 2024 research, development, test and evaluation (Air Force) funds in the amount of $2,000,000; fiscal 2024 research, development, test and evaluation (Navy) funds in the amount of $2,000,000; and non-Department of Defense participant funds in the amount of $890,878, will be obligated at the time of award, $4,000,000 of which will expire at the end of the current fiscal year. This contract action was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. (Awarded Sept. 11, 2025)
Sep 2025: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a not-to-exceed $34,266,559 modification (P00002) to an undefinitized firm-fixed-price order (N0001925F0090) against a previously issued basic ordering agreement (N0001924G0010). This modification adds scope to provide F-35 air vehicle initial spares to meet immediate maintenance needs and ensure the Air Force, Marine Corps, and Navy have mission capable aircraft. Work will be performed in Fort Worth, Texas, and is expected to be completed in June 2030. Fiscal 2025 aircraft procurement (Navy) funds in the amount of $20,074,884; and fiscal 2025 aircraft procurement (Air Force) funds in the amount of $14,191,675, will be obligated at the time of award, none of which will expire at the end of the current fiscal year. This order was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Sep 2025: Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $11,618,620 firm-fixed-price order (N0001925F0958) against a previously issued basic ordering agreement (N0001924G0010). This order provides for the redesign of the Sensor Electronics circuit card assembly in support of resolving the NextGen Electro Optical Distributed Aperture System diminishing manufacturing sources and material shortages redesign for the F-35 Lightning II for the Air Force, Marine Corps, Navy, and F35 cooperative program partners. Work will be performed in Fort Worth, Texas and is expected to be completed in July 2027. Fiscal 2023 aircraft procurement (Air Force) funds in the amount of $4,760,649; fiscal 2023 aircraft procurement (Navy) funds in the amount of $4,760,649; and cooperative program partners funds in the amount of $2,097,321, will be obligated at the time of award, $9,521,299 of which will expire at the end of the current fiscal year. This order was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Dec 2025: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $373,405,947 a modification (P00004) to a cost-plus-fixed-fee, firm-fixed-price order (N0001925F2558) against a previously issued basic ordering agreement (N0001924G0010). This modification adds scope to procure material, special tooling and test equipment necessary to build, deliver, and install the required modification kits to enable retrofitting aircraft, as well as provides program management, non-recurring engineering, aircraft induction, contractor field modification installations, depot site support, F-35B/F-35C laser shock peening site support, and regional depot modification installations in support of modification and retrofit activities for the F-35 Joint Strike Fighter program for the Air Force, Marine Corps, Navy, Foreign Military Sales (FMS) and non-U.S. Department of Defense (DoD) participants. Work will be performed in Fort Worth, Texas and is expected to be completed in December 2026. Fiscal 2024 aircraft procurement (Air Force) funds in the amount of $92,562,436; fiscal 2024 aircraft procurement (Navy) funds in the amount of $37,842,250; fiscal 2025 aircraft procurement (Navy) funds in the amount of $1,389,876; fiscal 2025 aircraft procurement (Air Force) funds in the amount of $718,556; fiscal 2026 aircraft procurement (Air Force) funds in the amount of $35,092,376; fiscal 2026 procurement (Navy) funds in the amount of $18,782,546; FMS funds in the amount of $56,053,178; and non-U.S. Dod participant funds in the amount of $131,034,729 will be obligated at the time of award, $130,404,686 of which will expire at the end of the current fiscal year. This contract action was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Mar 2026: Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $111,500,000 firm-fixed-price order (N0001926F0203) against a previously issued basic ordering agreement (N0001924G0010). This order procures F-35 Drag Chute System in support of Lot 18-19 aircraft delivery in support of Non-U.S. DOW Participants and Foreign Military Sales (FMS) customer's operational aircraft. Work will be performed in Fort Worth, Texas, and is expected to be completed in October 2030. FMS funds in the amount of $100,091,464; and cooperative program partners funds in the amount of $11,408,536, will be obligated at the time of award, none of which will expire at the end of the current fiscal year. This order was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity
Apr 2026: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $17,519,461 modification (P00006) to a cost-plus-fixed-fee, firm-fixed-price order (N0001925F2558) against a previously issued basic ordering agreement (N0001924G0010). This modification adds scope to procure material modification kits and special test and tooling equipment necessary to support retrofit and modification efforts for the F-35 Joint Strike Fighter program for the Air Force, Marine Corps, Navy, Foreign Military Sales, and non-U.S. Department of War (DOW) participants. Work will be performed in Fort Worth, Texas, and is expected to be completed in December 2028. Fiscal 2024 aircraft procurement (Navy) funds in the amount of $5,029,653; fiscal 2025 aircraft procurement (Navy) funds in the amount of $4,120,008; fiscal 2025 aircraft procurement (Air Force) funds in the amount of $4,635,895; and non-U.S. DOW participant funds in the amount of $3,733,905, will be obligated at the time of award, $5,029,653 of which will expire at the end of the current fiscal year. This contract action was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
May 2026: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $14,545,797 cost-plus-incentive-fee order (N0001926F0304) against a previously issued basic ordering agreement (N0001924G0010). This order provides for the procurement and installation of flight test instrumentation on CF-5 wings to mitigate the F-35 testing capability gap in support of carrier-variant ship suitability flight testing, bridging test capacity until the flight sciences aircraft are delivered. Work will be performed in Fort Worth, Texas (81%); Orlando, Florida (7%); Linthicum, Maryland (3%); Nashua, New Hampshire (3%); San Diego, California (2%); El Segundo, California (2%); Samlesbury, United Kingdom (1%); various locations within the continental U.S (CONUS) (1%); and various locations outside CONUS (1%), and is expected to be completed in May 2028. Fiscal 2025 research, development, test and evaluation (Navy) funds in the amount of $4,000,000 will be obligated at the time of award, none of which will expire at the end of the current fiscal year. This contract action was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
May 2026: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $991,127,074 firm-fixed-price order (N0001926F0301) against a previously issued basic ordering agreement (N0001924G0010). This order provides for the production and delivery of 432 material modification kits (97 for the Air Force, 54 for the Marines, 42 for the Navy, 106 for Foreign Military Sales (FMS) customers, and 133 for non-U.S. Department of War (DOW) participants) in support of F-35 Joint Strike Fighter aircraft modifications and retrofit efforts associated with modernization of the electronic warfare system and related capability upgrades. Work will be performed in Fort Worth, Texas, and is expected to be completed by March 2032. Fiscal 2026 aircraft procurement (Air Force) funds in the amount of $82,150,190; fiscal 2026 aircraft procurement (Navy) funds in the amount of $115,048,244; fiscal 2025 aircraft procurement (Air Force) funds in the amount of $140,758,499; fiscal 2025 aircraft procurement (Navy) funds in the amount of $75,306,828; fiscal 2024 aircraft procurement (Navy) funds in the amount of $29,999,052; FMS customers funds in the amount of $288,825,371; and non-U.S. DOW participants funds in the amount of $259,038,890, will be obligated at the time of award, $29,999,052 of which will expire at the end of the current fiscal year. This contract action was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
May 2026: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded an $879,098,832 firm-fixed-price order (N0001926F0233) against a previously issued basic ordering agreement (N0001924G0010). This order provides for the production and delivery of Lot 18-19 aircraft armament equipment which includes various missile launchers, bomb racks, gun systems, pylons, and adapters in support of ensuring the functionality and readiness of various armaments to support F-35 aircraft delivery schedules for the Air Force, Marine Corps, Navy, Foreign Military Sales (FMS) customers, and non-U.S. Department of War (DOW) participants. Work will be performed in Fort Worth, Texas, and is expected to be completed by February 2030. Fiscal 2026 aircraft procurement (Air Force) funds in the amount of $83,618,024; fiscal 2026 aircraft procurement (Navy) funds in the amount of $53,104,049; fiscal 2025 aircraft procurement (Navy) funds in the amount of $74,860,927; fiscal 2025 aircraft procurement (Air Force) funds in the amount of $37,345,787; fiscal 2024 aircraft procurement (Navy) funds in the amount of $79,203,534; fiscal 2024 aircraft procurement (Air Force) funds in the amount of $78,184,878; FMS customers funds in the amount of $333,601,044; and non-U.S. DOW participants funds in the amount of $139,180,588, will be obligated at the time if award, $157,388,412 of which will expire at the end of the current fiscal year. This contract action was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
May 2026: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $100,455,916 firm-fixed-price order (N0001926F0266) against a previously issued basic ordering agreement (N0001924G0010). This order procures 1,459 brake assembly heat sinks, including 1,075 for the F-35A Lightning II conventional takeoff and landing aircraft and 384 for the F-35B Lightning II short takeoff and vertical landing aircraft in support of depot-level brake repairs. This effort supports resolution of existing thermal management constraints, ensures the reliability of critical avionics, and supports forecasted fleet requirements for serviceable brakes to sustain warfighter operational requirements for the Air Force, Navy, Marine Corps, F-35 program partners, and Foreign Military Sales (FMS) customers. Work will be performed in South Bend, Indiana, and is expected to be completed by March 2030. Fiscal 2026 aircraft procurement (Air Force) funds in the amount of $43,795,721; fiscal 2026 aircraft procurement (Navy) funds in the amount of $28,597,475; FMS customer funds in the amount of $10,907,840; and F-35 program partner funds in the amount of $17,154,880, will be obligated at the time if award, none of which will expire at the end of the current fiscal year. This contract action was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Jul 2026: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $14,508,319 cost-plus-fixed-fee order (N0001926F2179) against a previously issued basic ordering agreement (N0001924G0010). This order provides comprehensive diminishing manufacturing sources and material shortages management services for the F-35 Joint Strike Fighter Air System, including supply chain monitoring, subcontractor oversight, obsolescence management, technology refresh planning, inventory assessments, and cost forecasting. This effort supports identification and mitigation of obsolete or unavailable parts and materials, preventing production disruptions and ensuring the long-term sustainment and operational readiness of the F-35 fleet in support of the Air Force, Navy, Marine Corps, and F-35 Program Partners. Work will be performed in Fort Worth, Texas (32.43%); Palm Bay, Florida (9.03%); Orlando, Florida (8.44%); San Diego, California (7.23%); El Segundo, California (4.11%); Owego, New York, (4.1%); Cedar Rapids, Iowa, (3.86%); Elma, New York (2%); McKinney, Texas (2%); Nashua, New Hampshire (1.97%); Rolling Meadows, Illinois (1.52%); Alpharetta, Georgia (1.15%); various locations within the continental U.S (20.16%); and various locations outside the continental U.S. (2.0%), and is expected to be completed by December 2031. Fiscal 2025 aircraft procurement (Air Force) funds in the amount of $5,932,808; fiscal 2025 aircraft procurement (Navy) funds in the amount of $5,932,807; and F-35 program partner funds in the amount of $2,642,704, will be obligated at the time if award, none of which will expire at the end of the current fiscal year. This contract was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Jul 2026: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $1,603,067,858 firm-fixed-price order (N0001926F2171) against a previously issued basic ordering agreement (N0001924G0010). This order procures initial spares for F-35 production aircraft to support the global and base spares pools, afloat spares packages, and deployment spares packages for the Air Force, Marine Corps, Navy, F-35 program partner, and Foreign Military Sales (FMS) customers. Work will be performed in Fort Worth, Texas, and is expected to be completed by September 2033. Fiscal 2026 aircraft procurement (Air Force) funds in the amount of $754,705,797; fiscal 2026 aircraft procurement (Navy) funds in the amount of $223,126,752; F-35 program partner funds in the amount of $138,793,588; and FMS funds in the amount of $486,441,721, will be obligated at the time if award. This contract was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Jul 2026: Lockheed Martin Corp., Fort Worth, Texas, is awarded a $23,082,803 cost-plus-fixed-fee order (N0001926F2197) against a previously issued basic ordering agreement (N0001924G0010). This order provides engineering and technical services, depot activation support, and material lay-in to establish and activate F-35 national air vehicle depots for Foreign Military Sales (FMS) customers. These efforts support the development of long-term aircraft sustainment and maintenance, repair, overhaul, and upgrade capabilities by procuring depot maintenance activation plans for the governments of Finland and Switzerland, and depot activation services and initial induction material for the Republic of Korea. Work will be performed in Fort Worth, Texas (68%); Cheongju, Korea (17%); Emmen, Switzerland (6%); Halli, Finland (6%); Seoul, Korea (2%), and Helsinki, Finland (1%) and is expected to be completed by December 2028. FMS customer funds in the amount of $23,082,803 will be obligated at the time of award. This contract was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Aug 2026: Lockheed Martin Corp., Fort Worth, Texas, is awarded a not-to-exceed $20,164,487 modification (P00001) to an undefinitized firm-fixed-price order (N0001926F2171) under a previously issued basic ordering agreement (N0001924G0010). This modification adds scope to procure afloat spares packages and deployment spares packages for air vehicle initial spares in support of F-35 production aircraft for the government of the Netherlands. Work will be performed in Fort Worth, Texas, and is expected to be completed in July 2033. F-35 cooperative program partners funds in the amount of $20,164,487 will be obligated at the time of award. This contract was not competed. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Aug 2026: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $24,128,282 modification (P00008) to a cost-plus-fixed-fee, firm-fixed-price order (N0001925F2558) against a previously issued basic ordering agreement (N0001924G0010). This modification adds scope for the procurement of material modification kits, special test and tooling equipment, aircraft induction, depot site support, and regional depot modification installations necessary to support F-35 Joint Strike Fighter aircraft retrofit and modification efforts for the Air Force, Marine Corps, Navy, Foreign Military Sales (FMS), and non-U.S. Department of War (DOW) participants. Work will be performed in Fort Worth, Texas, and is expected to be completed in October 2028. Fiscal 2024 aircraft procurement (Air Force) funds in the amount of $30,440; fiscal 2024 aircraft procurement (Navy) funds in the amount of $2,615,826; fiscal 2025 aircraft procurement (Air Force) funds in the amount of $5,450,402; fiscal 2026 aircraft procurement (Air Force) funds in the amount of $1,266,039; fiscal 2026 aircraft procurement (Navy) funds in the amount of $2,559,538; non-U.S. DOW participant funds in the amount of $9,096,785; and FMS customer funds in the amount of $3,109,252, will be obligated at the time of award. This contract was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Status
(Open)
Modified 2/13/26
Period of Performance
3/13/24
Start Date
3/13/29
Ordering Period End Date
Task Order Obligations and Backlog
$2.7B
Total Obligated
$2.9B
Current Award
$2.9B
Potential Award
$205.7M
Funded Backlog
$208.2M
Total Backlog
Federal Award Analysis
Historical federal task order obligations under N0001924G0010
$-
Contracts
$-
Subcontracts
$-
Grants
$-
Subgrants
$-
Total
No Results
Calculating
Calculating
No Results
Calculating
Calculating
No Results
Calculating
Calculating
| Year | Contracts | Subcontracts | Grants | Subgrants |
|---|
No Results
Calculating
Calculating
No Results
Calculating
Calculating
Contract Awards
Prime task orders awarded under N0001924G0010
Subcontract Awards
Disclosed subcontracts for N0001924G0010
Transaction History
Modifications to N0001924G0010
People
Suggested agency contacts for N0001924G0010
Competition
Number of Bidders
Not Applicable
Solicitation Procedures
Not Applicable
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
None
Other Categorizations
Subcontracting Plan
None
Cost Accounting Standards
Yes
Business Size Determination
Large Business
DoD Claimant Code
None
Awardee UEI
G4KDGE4JFFK7
Awardee CAGE
81755
Agency Detail
Awarding Office
S4419A DCMA FIXED WING FT WORTH
Funding Office
N00019 NAVAL AIR SYSTEMS COMMAND
Created By
angelia.kneisel@dcma.mil
Last Modified By
angelia.kneisel@dcma.mil
Approved By
angelia.kneisel@dcma.mil
Legislative
Legislative Mandates
Materials, Supplies, Articles & Equipment
Awardee District
TX-12
Senators
John Cornyn
Ted Cruz
Ted Cruz
Representative
Kay Granger
Last Modified: 2/13/26