FA820123D0005
Indefinite Delivery Contract
Overview
Government Description
The scope of this effort includes a broad range of exterior/interior pavement projects and appurtenances at Hill Air Force Base (HAFB), Utah air national guard base (UTANG), and areas under HAFB jurisdiction.
Awarding / Funding Agency
Pricing
Order Dependent (IDV Only)
Set Aside
Small Business Set Aside - Total (SBA)
Extent Competed
Full And Open Competition After Exclusion Of Sources
Multiple / Single Award
Multiple Award
Who Can Use
Multiple Agencies
Individual Order Limit
$20,000,000
Vehicle Ceiling
$92,500,581 (9% Used)
Related Opportunity
Analysis Notes
Place of Performance Largest percentage of work under issued task orders completed at: Hill Afb, Utah 84056 United States.
Brinkerhoff Excavating And Construction was awarded
Indefinite Delivery Contract FA820123D0005 (FA8201-23-D-0005)
by
Air Force Sustainment Center
in May 2023.
The IDC
has a duration of 5 years 6 months and
was awarded
through solicitation Hill AFB, Utah Air National Guard, and Geographically Separated Locations Paving Requirement
with a Small Business Total set aside
with
NAICS 237310 and
PSC Z2LB
via direct negotiation acquisition procedures with 5 bids received.
To date, $8,452,581 has been obligated through this vehicle.
The total ceiling is $92,500,581, of which 9% has been used.
DOD Announcements
May 2023:
Brinkerhoff Excavating and Construction Inc., Ogden, Utah (FA8201-23-D-0005); DSB Construction LLC, American Fork, Utah (FA8201-23-D-0006); and Pure Enviro-Management LLC, Spanish Fork, Utah (FA8201-23-D-0007), have been awarded a maximum $92,500,581 firm-fixed-price, multiple award, indefinite-delivery/indefinite-quantity contract for construction services including all paving projects and supports exterior/interior pavement improvements and appurtenances. This contract will provide all labor, material, and equipment to perform exterior/interior pavement improvements including, but are not limited to: flexible and rigid pavement excavation and replacement; road and parking lot construction; slab-on-grade and sidewalk construction; aggregate based road construction; airfield pavement surface construction; drainage systems; water/storm drain and sewer utility installation; exterior parking lot lighting installation; airfield rubber removal; and pavement striping. Work will be performed at Hill Air Force Base, Little Mountain Test Annex, and Utah Test and Training Range, Utah; Carter Creek and Boulder, Wyoming; and other geographically separated locations under the jurisdiction of Hill AFB and is expected to be completed by Nov. 14, 2029. These awards are the result of a competitive acquisition and four offers were received. Fiscal 2023 consolidated sustainment activity group funds in the amount of $750 ($250 per awardee) are being obligated at the time of award. The Air Force Sustainment Center, Hill Air Force Base, Utah, is the contracting activity. (Awarded May 15, 2023)
Status
(Open)
Modified 5/13/25
Period of Performance
5/14/23
Start Date
11/14/28
Ordering Period End Date
Task Order Obligations
$8.5M
Total Obligated
$8.5M
Current Award
$8.5M
Potential Award
Federal Award Analysis
Historical federal task order obligations under FA820123D0005
$-
Contracts
$-
Subcontracts
$-
Grants
$-
Subgrants
$-
Total
No Results
Calculating
Calculating
No Results
Calculating
Calculating
No Results
Calculating
Calculating
| Year | Contracts | Subcontracts | Grants | Subgrants |
|---|
No Results
Calculating
Calculating
No Results
Calculating
Calculating
Contract Awards
Prime task orders awarded under FA820123D0005
Subcontract Awards
Disclosed subcontracts for FA820123D0005
Opportunity Lifecycle
Procurement history for FA820123D0005
Transaction History
Modifications to FA820123D0005
People
Suggested agency contacts for FA820123D0005
Competition
Number of Bidders
5
Solicitation Procedures
Negotiated Proposal/Quote
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No
Other Categorizations
Subcontracting Plan
Plan Not Required
Cost Accounting Standards
Exempt
Business Size Determination
Small Business
DoD Claimant Code
None
Awardee UEI
KJ6EN85S5KC6
Awardee CAGE
1RP79
Agency Detail
Awarding Office
FA8201 FA8201 AFSC OL H PZIO
Funding Office
F2D0AC F2D0AC 75 CE
Created By
corbin.carlson.fa8201@afmc.hill
Last Modified By
afmc.hill@sa5700.afmc
Approved By
corbin.carlson.fa8201@afmc.hill
Legislative
Legislative Mandates
Construction Wage Rate Requirements
Labor Standards
Awardee District
UT-01
Senators
Mike Lee
Mitt Romney
Mitt Romney
Representative
Blake Moore
Budget Funding
| Federal Account | Budget Subfunction | Object Class | Total | Percentage |
|---|---|---|---|---|
| Operation and Maintenance, Air Force (057-3400) | Department of Defense-Military | Land and structures (32.0) | $250 | 100% |
Last Modified: 5/13/25