ORCHARD MESA IRRIGATION DISTRICT (OMID) SEEKS FUNDS TO COMPLETE THE DESIGN AND CONSTRUCTION OF 8.4 MILES OF PRESSURIZED PIPELINES AT THE WESTERN END OF THE DISTRICT NEAR GRAND JUNCTION, COLORADO TO SUPPORT THE RECOVERY OF FOUR THREATENED AND ENDANGERED NATIVE FISH SPECIES IN THE 15-MILE REACH OF THE COLORADO RIVER: THE COLORADO PIKEMINNOW, RAZORBACK SUCKER, BONYTAIL, AND HUMPBACK CHUB. THE 15-MILE REACH IS A CRITICAL STRETCH OF THE COLORADO RIVER THAT IS PARTICULARLY VULNERABLE TO LOW STREAMFLOW DUE TO LARGE WITHDRAWALS IN AN AGRICULTURALLY DEVELOPED AND RAPIDLY URBANIZING AREA, AS WELL AS ONGOING DROUGHT. THE PROJECT WOULD CONVERT APPROXIMATELY 8.4 MILES OF OPEN CANALS INTO PRESSURIZED PIPE, INCLUDING 4.8 MILES OF CANAL 1, 2.9 MILES OF CANAL 2, AND 0.7 MILES OF OVERFLOW FROM CANAL 2 TO CANAL 1. MAJOR MILESTONES DURING THE PROJECT EXECUTION INCLUDE NEPA, CULTURAL RESOURCES, AND PERMITTING COMPLETION IN THE PLANNING PHASE 30%, 60%, AND FINAL DESIGN IN THE ENGINEERING PHASE AND CANAL 1 PIPING, CANAL 2 OVERFLOW DITCH PIPING IN THE CONSTRUCTION PHASE. THE PROJECT GOALS ARE TO ELIMINATE WATER LOSS FROM SEEPAGE,EVAPORATION, AND OPERATIONAL SPILL WHILE REDUCING THE AMOUNT OF WATER NEEDED TO OPERATE OMIDS HYDRAULIC PUMPS. THE CONVEYANCE UPGRADES WOULD REDUCE OMIDS DEMAND BY UP TO 6,900 ACRE-FEET PER YEAR DURING THE IRRIGATION SEASON. REDUCED OMID DEMAND WOULD INCREASE THE LIKELIHOOD OF SURPLUS RELEASES FROM GREEN MOUNTAIN RESERVOIR TO THE 15-MILE REACH TO ENHANCE STREAMFLOW AND INCREASE DROUGHT RESILIENCE FOR NATIVE LISTED FISH SPECIES DURING THE WARMEST AND DRIEST TIME OF THE YEAR. DURING FREE RIVER CONDITIONS, THE PROJECT WOULD ENHANCE NATURAL FLOW. OMID EXPECTS TO COMPLETE THE PROJECT BY MAY 2029.
Funding Goals
DROUGHT MITIGATION IN THE RECLAMATION STATES
Place of Performance
Colorado United States
Geographic Scope
State-Wide
Related Opportunity
R-R-UCB-25-002
Orchard Mesa Irrigation District was awarded OMID Grant: Pressurized Pipelines for Colorado River Fish Recovery Project Grant R25AP00524 worth $10,529,770 from USBR Upper Colorado Basin Region, Salt Lake City, UT in September 2025 with work to be completed primarily in Colorado United States. The grant has a duration of 3 years 8 months and was awarded through assistance program 15.567 Colorado River System Conservation Pilot. $28,017 (0.0%) of this Project Grant was funded by non-federal sources.

Status
(Ongoing)

Last Modified 11/13/25

Period of Performance
9/18/25
Start Date
5/31/29
End Date
4.0% Complete

Funding Split
$10.5M
Federal Obligation
$28.0K
Non-Federal Obligation
$10.6M
Total Obligated
100.0% Federal Funding
0.0% Non-Federal Funding

Activity Timeline

Interactive chart of timeline of amendments to R25AP00524

Additional Detail

Award ID FAIN
R25AP00524
SAI Number
None
Award ID URI
None
Awardee Classifications
Special District Government
Awarding Office
140R40 UPPER COLORADO REGIONAL OFFICE
Funding Office
140R40 UPPER COLORADO REGIONAL OFFICE
Awardee UEI
G192SSLCXBN6
Awardee CAGE
4VGE4
Performance District
CO-03
Senators
Michael Bennet
John Hickenlooper
Modified: 11/13/25