Search Prime Grants

R25AP00448

Project Grant

Overview

Grant Description
FOSS RESERVOIR MASTER CONSERVANCY DISTRICT (MCD), LOCATED IN CUSTER COUNTY, OKLAHOMA, IS AN INTEGRAL WATER PROVIDER IN WEST-CENTRAL OKLAHOMA SERVING MEMBER CITIES CLINTON, CORDELL, HOBART AND BESSIE. THE MCD FACES SIGNIFICANT WATER-RELATED CHALLENGES DUE TO AGING INFRASTRUCTURE AND THE ABSENCE OF REDUNDANCY AND SUBSEQUENT RELIABILITY AT THE FOSS WATER TREATMENT PLANT (WTP). FURTHER COMPLICATING THE RELIABILITY OF THE SYSTEM IN THE NEAR FUTURE ARE INCREASING DEMANDS FROM USERS, FREQUENT DROUGHT AND THE ANTICIPATED IMPACTS OF CLIMATE CHANGE. FOSS RESERVOIR IS A FEDERAL PROJECT OF THE U.S. BUREAU OF RECLAMATION THAT WAS CONSTRUCTED IN 1962.THE FOSS MCD DRINKING WATER PRETREATMENT REHABILITATION PROJECT WILL FACILITATE CRUCIAL UPGRADES TO THE WTP. THE PLANT CURRENTLY USES AN INEFFICIENT SOLIDS CONTACT CLARIFIER (SCC) FOR PRIMARY TREATMENT OF THE RESERVOIRS WATER, WHICH IS UNUSUALLY HIGH IN TOTAL DISSOLVED SOLIDS (TDS). A NEW DISSOLVED AIR FLOTATION (DAF) PROCESS AND APPURTENANT INFRASTRUCTURE UPGRADES WILL ESTABLISH ESSENTIAL SYSTEM REDUNDANCY FOR THE FIRST TIME AND SIGNIFICANTLY INCREASE THE PLANTS EFFICIENCY AND RELIABILITY. THE REHABILITATED INFRASTRUCTURE WILL ALSO MITIGATE THE FORMATION OF HARMFUL DISINFECTION BY-PRODUCTS (DBPS) THROUGH ULTRAVIOLET (UV) DISINFECTION FOR CRYPTOSPORIDIUM AND GIARDIA INACTIVATION. THE PROJECT WILL INCREASE THE PLANTS TOTAL CAPACITY FROM APPROXIMATELY 1.8 MGD TO 2.3 MGD. MOST IMPORTANTLY, HOWEVER, THE WTPS ESSENTIAL FIRM CAPACITY THAT IS, ITS CAPACITY WITH THE LARGEST UNIT OUT OF SERVICE, WHICH IS CURRENTLY 0 MGD DUE TO THE LACK OF REDUNDANCY WILL INCREASE TO 1.5 MGD, WHICH IS WELL WITHIN THE MCDS TOTAL CONTRACTUAL OBLIGATION OF 1.41 MGD. FULL PLANT REDUNDANCY AND IMPROVED FLEXIBILITY WILL ALLOW THE MCD TO SERVE USERS DURING REQUIRED MAINTENANCE, DROUGHT EPISODES AND OTHER HIGH DEMAND PERIODS. IMPORTANTLY, THE PROJECT WILL ENABLE THE PRODUCTION OF AN ADDITIONAL 506 ACRE-FEET PER YEAR (AFY) OF WATER FOR THE REGION ON A TOTAL CAPACITY BASIS AND 1,688 AFY ON A FIRM CAPACITY BASIS
Awardee
Place of Performance
Oklahoma United States
Geographic Scope
State-Wide
Foss Reservoir was awarded FOSS Reservoir Water Treatment Plant Upgrade Grant Project Grant R25AP00448 worth $7,585,018 from the Bureau of Reclamation in September 2025 with work to be completed primarily in Oklahoma United States. The grant has a duration of 2 years 2 months and was awarded through assistance program 15.504 Title XVI Water Reclamation and Reuse. $22,755,054 (75.0%) of this Project Grant was funded by non-federal sources. The Project Grant was awarded through grant opportunity WaterSMART: Title XVI WIIN Act Water Reclamation and Reuse Projects for Fiscal Years 2023 and 2024.

Status
(Ongoing)

Last Modified 9/17/25

Period of Performance
9/1/25
Start Date
11/30/27
End Date
2.0% Complete

Funding Split
$7.6M
Federal Obligation
$22.8M
Non-Federal Obligation
$30.3M
Total Obligated
25.0% Federal Funding
75.0% Non-Federal Funding

Activity Timeline

Interactive chart of timeline of amendments to R25AP00448

Additional Detail

Award ID FAIN
R25AP00448
SAI Number
None
Award ID URI
None
Awardee Classifications
Special District Government
Awarding Office
140R60 GREAT PLAINS REGIONAL OFFICE
Funding Office
140R81 DENVER FED CENTER
Awardee UEI
M8ZKNM4TB6P4
Awardee CAGE
4P2F2
Performance District
OK-03
Senators
James Lankford
Markwayne Mullin
Modified: 9/17/25