Search Prime Grants

P23AP01979

Project Grant

Overview

Grant Description
Illinois Department of Natural Resources will utilize a Land and Water Conservation Fund (LWCF) grant to renovate Pere Marquette State Park. The project will include the rehabilitation or replacement of facilities and infrastructure associated with the Ouatoga Group Camp Area. The focus shall be the repair of existing structures and facilities.

Specific elements in these buildings to be evaluated and repaired include, but are not limited to: doors, windows, roofs, foundations, walls, siding, fireplace stonework, flooring, stairs steps, structural supports, shutters, fascia and trim, railings, joists, rafters, hardware, etc.

In addition to the structures, infrastructure within the group camp also needs repair, upgrade or replacement. These infrastructure elements include, but are not limited to: utilities, swimming pools, pool equipment, shower buildings, road and parking facilities, etc.

Restoration of site grounds is also needed, including but not limited to elements such as grading, drainage, trenching, sidewalks and landscaping. Completion of this project will increase outdoor recreation experience and benefit visitors of all ages and abilities.
Awarding / Funding Agency
Place of Performance
Grafton, Illinois United States
Geographic Scope
City-Wide
Analysis Notes
Amendment Since initial award the total obligations have increased 19% from $9,734,918 to $11,600,000.
Illinois Department Of Natural Resources was awarded IL DNR LWCF Grant for Pere Marquette State Park Renovation Project Grant P23AP01979 worth $5,800,000 from NPS National Office in October 2023 with work to be completed primarily in Grafton Illinois United States. The grant has a duration of 3 years and was awarded through assistance program 15.916 Outdoor Recreation Acquisition, Development and Planning. $5,800,000 (50.0%) of this Project Grant was funded by non-federal sources. The Project Grant was awarded through grant opportunity LWCF State Assistance Formula Grants - Acquisition & Construction - FY23 Cycle 3.

Status
(Ongoing)

Last Modified 7/1/25

Period of Performance
10/1/23
Start Date
9/30/26
End Date
63.0% Complete

Funding Split
$5.8M
Federal Obligation
$5.8M
Non-Federal Obligation
$11.6M
Total Obligated
50.0% Federal Funding
50.0% Non-Federal Funding

Activity Timeline

Interactive chart of timeline of amendments to P23AP01979

Transaction History

Modifications to P23AP01979

Additional Detail

Award ID FAIN
P23AP01979
SAI Number
None
Award ID URI
None
Awardee Classifications
State Government
Awarding Office
140P98 LWCF OFFICE
Funding Office
140P98 LWCF OFFICE
Awardee UEI
NRQNHQY3X1U6
Awardee CAGE
3GF85
Performance District
IL-16
Senators
Richard Durbin
Tammy Duckworth

Budget Funding

Federal Account Budget Subfunction Object Class Total Percentage
Land Acquisition and State Assistance, National Park Service (014-5035) Recreational resources Grants, subsidies, and contributions (41.0) $4,622,290 95%
Outer Continental Shelf Revenues, LWCF Share from Certain Leases, National Park Service (014-5536) Recreational resources Grants, subsidies, and contributions (41.0) $245,169 5%
Modified: 7/1/25