THE DETROIT TRANSPORTATION CORPORATION (DTC) REQUESTS FUNDING FROM SECTIONS 5307 AND 5337 TO SUPPORT MULTIPLE CAPITAL PROJECTS. THE TOTAL REQUEST OF $4348398 (FEDERAL: $3478718 AND COMPREHENSIVE TRANSPORTATION FUND (CTF): $869680)) WILL ASSIST IN MAINTAINING THE DETROIT PEOPLE MOVER (DPM) SYSTEM IN A STATE OF GOOD REPAIR PER THE TRANSIT ASSET MANAGEMENT (TAM) PLAN. TOTAL SECTION 5307 FUNDING INCLUDES: FEDERAL (80%): $929220 CTF (20%): $232305 TOTAL (100%): $1161525 AS ITEMIZED BELOW : - FFY 2020- FEDERAL (80%): $459834 CTF (20%): $114959 TOTAL (100%): $574793. - FFY 2021- FEDERAL (80%): $469386 CTF (20%): $117347 TOTAL (100%): $586733.TOTAL SECTION 5337 FUNDING INCLUDES: FEDERAL (80%): $2549498 CTF (20%): $637375 TOTAL (100%): $3186873 AS ITEMIZED BELOW: - FFY 2020- FEDERAL (80%): $1285614 CTF (20%): $321403 TOTAL (100%): $1607017. - FFY 2021- FEDERAL (80%): $1263884 CTF (20%): $315971 TOTAL (100%): $1579855.PROJECTS FUNDED BY FY 2020 AND 2021 AWARDS INCLUDE: (1) SYSTEM INSPECTIONS REPAIRS AND COMPONENTS; (2) GUIDEWAY VEHICLE STATION FACILITY AND EQUIPMENT IMPROVEMENTS; (3) POWER EQUIPMENT AND SUBSTATIONS UPGRADES; (4) PREVENTIVE MAINTENANCE; (5) SIGNAL COMMUNICATION SIGNAGE AND SECURITY EQUIPMENT UPGRADES; (6) OPERATIONAL SUPPORT EQUIPMENT UPGRADES; (7) ENGINEERING AND PLANNING SERVICES; (8) TAM PLAN DEVELOPMENT AND IMPLEMENTATION; AND (9) ALL OTHER IMPROVEMENTS TOWARD THIS EFFORT. BY EXECUTING THIS GRANT WE CERTIFY THAT PROJECTS FUNDED UNDER THIS GRANT ARE INCLUDED IN THE TRANSIT ASSET MANAGEMENT PLAN INVESTMENT PRIORITIES SECTION.THE FOLLOWING DOCUMENTS ARE ATTACHED IN TRAMS FOR FISCAL YEARS 2020 AND 2021: (1) DTC STIP PROJECTS; (2) RTA APPORTIONMENT LETTERS; (3) LONG RANGE TIP PROJECTS; AND (4) SEMCOG REGIONAL WORK PLANS. PURPOSE OF THE AWARD: SECTION 5307 5337 FUNDING WILL ASSIST DTC IN PROACTIVELY MAINTAINING THE DETROIT PEOPLE MOVERS (DMP) INFRASTRUCTURE IN A STATE OF GOOD REPAIR AND TOWARD OPERATING A SAFE EFFICIENT RELIABLE AND SUSTAINABLE DPM SERVICE THAT ENHANCES RIDERS MOBILITY AROUND THE DETROIT DOWNTOWN AREA.ACTIVITIES TO BE PERFORMED: DTC ANTICIPATES PERFORMING A WIDE RANGE OF ACTIVITIES VIA SECTIONS 5307 5337 AWARDS. THESE INCLUDE: (1) SYSTEM INSPECTIONS REPAIRS AND COMPONENTS; (2) GUIDEWAY VEHICLE STATION FACILITY AND EQUIPMENT IMPROVEMENTS; (3) POWER EQUIPMENT AND SUBSTATIONS UPGRADES; (4) PREVENTIVE MAINTENANCE; (5) SIGNAL COMMUNICATION SIGNAGE AND SECURITY EQUIPMENT UPGRADES; (6) OPERATIONAL SUPPORT EQUIPMENT UPGRADES; (7) ENGINEERING AND PLANNING SERVICES; (8) TAM PLAN DEVELOPMENT AND IMPLEMENTATION; AND (9) ALL OTHER IMPROVEMENTS TOWARD THIS EFFORT. SPECIFIC ACTIVITIES WILL MINIMALLY INCLUDE: PERFORMING TRACK INSPECTIONS AND REPAIRS ENSURING THE UPKEEP OF ELEVATORS AND ESCALATORS WITHIN ALL PASSENGER STATIONS UPGRADING THE CCTV SYSTEM IN ALL STATIONS AND TRAINS PERFORMING ONGOING PREVENTATIVE MAINTENANCE IMPLEMENTING AN EFFECTIVE TAM SYSTEM UPGRADING THE FEED-IN-DEVISE (FID) TRAINING EMPLOYEES TO SUPPORT SYSTEM UPGRADES UPGRADING TECHNOLOGIES THROUGHOUT THE SYSTEM ETC. EXPECTED OUTCOMES: THE ONGOING PRESERVATION OF THE DPM LIGHT RAIL SYSTEM ENSURES ITS ASSETS REMAIN IN AN OPTIMAL STATE. THE COLLECTIVE OUTCOMES OF THE ANTICIPATED ACTIVITIES WILL ASSIST IN ACHIEVING THIS GOAL. INTENDED BENEFICIARIES: THERE ARE TWO (2) PRIMARY BENEFICIARIES FROM APPLYING SECTIONS 5307 5337 AWARDS. ONE ALL DPM RIDERS THROUGH AN IMPROVED QUALITY OF SERVICE. AND TWO THE DTC FROM PROACTIVELY MAXIMIZING THE UTILIZATION OF DPM ASSETS TO ACHIEVE LONG-TERM COSTS SAVINGS.SUBRECIPIENT ACTIVITIES: N/A
Awarding Agency
Place of Performance
Michigan United States
Geographic Scope
State-Wide
Related Opportunity
None
Analysis Notes
Infrastructure $2,518,459 (42%) percent this Project Grant was funded by the 2021 Infrastructure Act.
Amendment Since initial award the End Date has been extended from 03/30/29 to 03/30/30 and the total obligations have increased 545% from $1,161,525 to $7,496,472.
Detroit Transportation Corporation was awarded Detroit People Mover Infrastructure Maintenance and Upgrades Project Grant MI-2021-031 worth $5,997,177 from the FTA Office of Budget and Policy in August 2021 with work to be completed primarily in Michigan United States. The grant has a duration of 8 years 7 months and was awarded through assistance program 20.525 State of Good Repair Grants Program. $1,499,295 (20.0%) of this Project Grant was funded by non-federal sources.

Status
(Ongoing)

Last Modified 9/19/22

Period of Performance
8/12/21
Start Date
3/30/30
End Date
43.0% Complete

Funding Split
$6.0M
Federal Obligation
$1.5M
Non-Federal Obligation
$7.5M
Total Obligated
80.0% Federal Funding
20.0% Non-Federal Funding

Activity Timeline

Interactive chart of timeline of amendments to MI-2021-031

Transaction History

Modifications to MI-2021-031

Additional Detail

Award ID FAIN
MI-2021-031
SAI Number
MI-2021-031-01-20.525
Award ID URI
SAI EXEMPT
Awardee Classifications
Other
Awarding Office
695124 REGION 5 DOT FTA
Funding Office
693JJ8 OFFICE OF BUDGET AND POLICY(TBP)
Awardee UEI
VJ3NAJ5P1DE3
Awardee CAGE
5AXL4
Performance District
90
Senators
Debbie Stabenow
Gary Peters

Budget Funding

Federal Account Budget Subfunction Object Class Total Percentage
Formula and Bus Grants, Liquidation of Contract Authorization, Federal Transit Administration, Transportation (069-8350) Ground transportation Grants, subsidies, and contributions (41.0) $2,518,459 100%
Modified: 9/19/22