Search Prime Grants

MA-2022-034

Formula Grant

Overview

Grant Description
PURPOSE: TO REQUEST $97139202 IN FEDERAL FUNDS TO FUND CAPITAL PROJECTS INCLUDING REPLACING BRIDGES ON DORCHESTER AVENUE SYSTEMWIDE TUNNEL INSPECTIONS THE EXPANSION AND IMPROVEMENT OF CODMAN YARDS ENGINEERING AND DESIGN OF NORTH STATION DRAWBRIDGE ONE DAVIS SQUARE SIGNAL IMPROVEMENT SIGNAL PRIORITY FOR CONCORD AVENUE IN CAMBRIDGE AND FOR MALDEN/EVERETT AND CATAMARAN OVERHAULS. FUNDING:SECTION 5307(H) PASSENGER FERRYFFY 2020 - $3500000 (D2020-PFGP-006 D2020-PFGP-007 D2020-PFGP-008)FFY 2021 - $3935140 (D2022-PFGP-008)TOTAL - $74351405337 FIXED GUIDEWAY:FFY 2020 -$20296384FFY 2021- $68816259TOTAL - $891126435337 HIGH INTENSITY MOTORBUSFFY 2020 - $59282FFY 2021 - $48137TOTAL: $107419CMAQ FLEX FUNDS FFY 2021 - $304000FFY 2022- $180000TOTAL - $484000LOCAL MATCH WILL BE FROM MBTA REVENUE BONDS.ACTIVITIES TO BE PERFORMED: - REPLACE THREE (3) CONTIGUOUS BRIDGES NOS. B-16-129 BINS 4VM 8MQ 8RR ALONG DORCHESTER AVENUE IN BOSTON MA- PERIODIC INSPECTION AND RATING OF THE ORANGE LINE GREEN LINE RED LINE AND BLUE LINE TUNNELS- TRAFFIC SIGNAL PRIORITIZATION IN SOMERVILLE CAMBRIDGE AND MALDEN/EVERETT- INITIAL DESIGN WORK FOR A NORTH STATION DRAWBRIDGE REPLACEMENT- PROGRESS ON OVERHAULS OF CATAMARANS- CODMAN YARD EXPANSION AND IMPROVEMENTS PROJECTEXPECTED OUTCOMES:THESE FUNDS WILL IMPROVE SAFETY HELP REPLACE MUCH NEEDED INFRASTRUCTURE UPDATE A BUS GARAGE FOR ELECTRIC AND HYBRID VEHICLES ENSURE THE INTEGRITY OF SUBWAY TUNNELS AND HELP MAKE BUS TRIPS FASTER AND ON A MORE RELIABLE SCHEDULE. INTENDED BENEFICIARIES:RESIDENTS OF THE MBTA SERVICE AREA SYSTEMWIDESUBRECIPIENT ACTIVITIES: NONETHE MBTA CERTIFIES THAT PROJECTS FUNDED IN THIS GRANT BY SECTION 5337 FUNDS ARE INCLUDED IN THE TRANSIT ASSET MANAGEMENT (TAM) PLAN INVESTMENT PRIORITIZATION SECTION.
Awarding Agency
Place of Performance
Massachusetts United States
Geographic Scope
State-Wide
Related Opportunity
None
Analysis Notes
Amendment Since initial award the total obligations have increased 814% from $15,475,280 to $141,500,360.
Massachusetts Bay Transportation Authority was awarded Federal Funding for MBTA Capital Projects Formula Grant MA-2022-034 worth $108,739,202 from the FTA Office of Budget and Policy in September 2022 with work to be completed primarily in Massachusetts United States. The grant has a duration of 3 years 6 months and was awarded through assistance program 20.525 State of Good Repair Grants Program. $32,761,158 (23.0%) of this Formula Grant was funded by non-federal sources.

Status
(Ongoing)

Last Modified 9/18/23

Period of Performance
9/19/22
Start Date
3/31/26
End Date
46.0% Complete

Funding Split
$108.7M
Federal Obligation
$32.8M
Non-Federal Obligation
$141.5M
Total Obligated
77.0% Federal Funding
23.0% Non-Federal Funding

Activity Timeline

Interactive chart of timeline of amendments to MA-2022-034

Transaction History

Modifications to MA-2022-034

Additional Detail

Award ID FAIN
MA-2022-034
SAI Number
MA-2022-034-01-20.525
Award ID URI
SAI EXEMPT
Awardee Classifications
Other
Awarding Office
691384 REGION 1 VOLPE NATIONAL TSC
Funding Office
693JJ8 OFFICE OF BUDGET AND POLICY(TBP)
Awardee UEI
JMUMDCV44J11
Awardee CAGE
58RY9
Performance District
MA-90
Senators
Edward Markey
Elizabeth Warren

Budget Funding

Federal Account Budget Subfunction Object Class Total Percentage
Formula and Bus Grants, Liquidation of Contract Authorization, Federal Transit Administration, Transportation (069-8350) Ground transportation Grants, subsidies, and contributions (41.0) $11,600,000 100%
Modified: 9/18/23