Search Prime Grants

DESC0024052

Project Grant

Overview

Grant Description
Simultaneous lithium extraction and thin-film deposition of lithium metal for low-cost, high-energy anodes from brine resources.
Funding Goals
N/A
Place of Performance
Hopewell Junction, New York 12533-4021 United States
Geographic Scope
Single Zip Code
Analysis Notes
Infrastructure $1,345,255 (100%) percent this Project Grant was funded by the 2021 Infrastructure Act.
Amendment Since initial award the End Date has been extended from 04/09/24 to 04/09/26 and the total obligations have decreased from $1,352,572 to $1,345,255.
Alpha-En Corporation was awarded Project Grant DESC0024052 worth $1,345,255 from the Office of Science in July 2023 with work to be completed primarily in Hopewell Junction New York United States. The grant has a duration of 2 years 9 months and was awarded through assistance program 81.049 Office of Science Financial Assistance Program. The Project Grant was awarded through grant opportunity FY 2023 Phase I Release 2.

SBIR Details

Research Type
SBIR Phase I
Title
Simultaneous Lithium Extraction and Thin-Film Deposition of Lithium Metal for Low-Cost, High-Energy Anodes from Brine Resources
Abstract
Brine resources in the United States are not amenable to conventional approaches for lithium extraction and the process for fabricating lithium metal from these extracted materials has severe limitations which lead to expensive coatings and subpar battery performance. The proposed project will investigate the use of a novel approach to lithium extraction from brine resources which directly results in the fabrication of cell-ready thin-film lithium metal electrodes. This process, which we refer to as reductive lithium extraction (RLE), solves two problems currently plaguing the lithium and battery industry, namely (1) lithium extraction from brine resources and (2) low-cost thin-film lithium metal fabrication. The RLE process uses an applied voltage to perform the lithium extraction which allows for the combination of lithium extraction and thin-film lithium metal fabrication to a single step. This combined process will substantially simplify the lithium supply chain and unlock domestic sources of lithium which are critical to our electrification and climate goals. The proposed project will investigate the use of brine- based resources in the RLE process and evaluate the resulting thin-films of lithium metal as electrodes in lithium-ion batteries. The goal of this fast-track proposal is to create a coating unit capable of operating at the site of cell manufacturing to reduce the cost and improve the quality of lithium metal electrodes used in battery production. Phase I of this program will evaluate the performance of the RLE system using synthetic brine resources. This evaluation will include a characterization of the RLE lithium extraction efficiency and the battery performance of the resulting lithium metal electrode. In Phase II, the process will be optimized for commercial application. This optimization will include an increase of the lithium extraction and thin-film deposition speed to levels attractive to our customers in a roll-to-roll pilot coating unit. Additionally, the total cost of lithium metal production will be characterized in this system and compared to what is available commercially. At the completion of this project, the performance of a pilot coating unit will inform a complete techno-economic analysis of the commercial potential of the RLE process. Success in this project will result in a process that enables lithium metal extraction from domestic raw materials at a lower cost and with a greater energy efficiency than the approaches used today. Notably, this process enables the full lithium supply chain for a lithium metal anode to be wholly captured in the United States. The efficiency of this process leap frogs existing operations and initial cost estimates predict that this will result in a 50-90% decrease in the cost of lithium metal thin-films which are critical for next-generation high-energy batteries. Successful deployment of this process commercially will result in lower material costs for battery manufacturers which is anticipated to result in lower cost batteries for consumers. A reduction in the price of high-energy batteries will have a direct impact on the cost of electric vehicles which is critical to achieve the level of widespread adoption required by the United States’ climate goals. A joint development agreement with a commercial manufacturer will carry this project to full commercialization.
Topic Code
C56-13a
Solicitation Number
DE-FOA-0002903

Status
(Complete)

Last Modified 9/1/26

Period of Performance
7/10/23
Start Date
4/9/26
End Date
100% Complete

Funding Split
$1.3M
Federal Obligation
$0.0
Non-Federal Obligation
$1.3M
Total Obligated
100.0% Federal Funding
0.0% Non-Federal Funding

Activity Timeline

Interactive chart of timeline of amendments to DESC0024052

Transaction History

Modifications to DESC0024052

Additional Detail

Award ID FAIN
DESC0024052
SAI Number
None
Award ID URI
SAI EXEMPT
Awardee Classifications
Small Business
Awarding Office
892430 SC CHICAGO SERVICE CENTER
Funding Office
892401 SCIENCE
Awardee UEI
P7B1G41EYZB9
Awardee CAGE
7HGX9
Performance District
NY-17
Senators
Kirsten Gillibrand
Charles Schumer

Budget Funding

Federal Account Budget Subfunction Object Class Total Percentage
Science, Energy Programs, Energy (089-0222) General science and basic research Grants, subsidies, and contributions (41.0) $1,352,572 100%
Modified: 9/1/26