DESC0024045
Project Grant
Overview
Grant Description
Mcp-pmt timing layer for lhcb ecal upgrade 2.
Awardee
Grant Program (CFDA)
Awarding Agency
Funding Agency
Place of Performance
Charlton,
Massachusetts
01507-5238
United States
Geographic Scope
Single Zip Code
Related Opportunity
Incom was awarded
Project Grant DESC0024045
worth $199,194
from the Office of Science in July 2023 with work to be completed primarily in Charlton Massachusetts United States.
The grant
has a duration of 1 year and
was awarded through assistance program 81.049 Office of Science Financial Assistance Program.
The Project Grant was awarded through grant opportunity FY 2023 Phase I Release 2.
SBIR Details
Research Type
SBIR Phase I
Title
MCP-PMT Timing Layer for LHCb ECAL Upgrade 2
Abstract
Problem Being Addressed – Phase II LHCb Electromagnetic Calorimeter (ECAL) upgrade for high luminosity flavor physics program at LHC is projected to overcome limitations of the present ECAL system. Upgraded ECAL modules should be tolerant to a radiation dose of about 1 MGy, capable of timing resolution of about 10 psec and energy resolution of about 10% for 5-100 GeV electrons. The choice for the central part of ECAL is presently thought to be implemented as a sampling calorimeter with dense tungsten-based converter and radiation hard crystal scintillator. Concerning the particular structure type, it was found that the Spaghetti Calorimeter (SPACAL) concept based on GAGG:Ce or YAG:Ce scintillators meets the requirements on radiation hardness. However, the timing resolution for experimental SPACAL modules read out with conventional PMTs is still far from the required goal. How Problem is Being Addressed – We propose to adopt the well-established Large Area Picosecond Photo Detector (LAPPD) technology for achieving the required timing capability for SPACAL. This will be realized by developing a dedicated radiation hard ECAL Z-stacked Picosecond Particle Detector (EZPPD) units featuring three z-stacked ALD functionalized large area borosilicate glass MCPs, anode with pixelated readout and. EZPPD units will be integrated into the SPACAL modules to provide 10-20psec timing resolution Commercial Applications – LAPPDs and EZPPDs will enable new techniques in HEP, homeland security (non-proliferation) sensors to screen vehicles and cargo for Special Nuclear Materials (SNMs) and scientific detectors for astrophysics, time-of-flight mass spectrometry and medical imaging products including detectors for positron emission tomography (PET scanning) that are not achievable with conventional small area MCP-PMTs. ECAL Phase II upgrade will require about 50 square meters of detector coverage that translates to about 3,500 EZPPDs. With production volume of more than 1000 devices, the LAPPD price will be conservatively reduced to $100 per cm2 of active area.
Topic Code
C56-38a
Solicitation Number
DE-FOA-0002903
Status
(Complete)
Last Modified 9/18/23
Period of Performance
7/10/23
Start Date
7/9/24
End Date
Funding Split
$199.2K
Federal Obligation
$0.0
Non-Federal Obligation
$199.2K
Total Obligated
Activity Timeline
Additional Detail
Award ID FAIN
DESC0024045
SAI Number
None
Award ID URI
SAI EXEMPT
Awardee Classifications
Small Business
Awarding Office
892430 SC CHICAGO SERVICE CENTER
Funding Office
892401 SCIENCE
Awardee UEI
CLS5D7LVF9A3
Awardee CAGE
59294
Performance District
MA-01
Senators
Edward Markey
Elizabeth Warren
Elizabeth Warren
Budget Funding
| Federal Account | Budget Subfunction | Object Class | Total | Percentage |
|---|---|---|---|---|
| Science, Energy Programs, Energy (089-0222) | General science and basic research | Grants, subsidies, and contributions (41.0) | $199,194 | 100% |
Modified: 9/18/23