Search Prime Grants

DEFE0032340

Cooperative Agreement

Overview

Grant Description
The objective of the Illinois Basin WEST CARBONSAFE Phase III project is to geologically characterize the Cambrian Mt. Simon Sandstone/Eau Claire Formation storage complex near the Dallman Power Generation Plant in Springfield, Illinois, and to submit the required Underground Injection Control (UIC) Class VI permit to construct application(s) that may be used for construction of a carbon dioxide (CO2) injection well(s) at the project site.

Initial project tasks will focus on site characterization, acquisition of seismic profiles, drilling of a stratigraphic test well, completion of required Class VI permit to construct application(s), and implementation of the project’s community benefits plan.

Final project tasks focus on integrating all characterization data, finalizing a site-specific storage field development plan, and continuing implementation of the project’s community benefits plan to further carbon capture and storage (CCS) deployment.

This project will benefit DOE's program by: (1) reducing geological uncertainty at the site by drilling a stratigraphic test well to approximately 5,800 ft, collecting core through reservoir and seal intervals, collecting a robust suite of geophysical logs, and acquiring approximately 60 linear miles of 2D seismic surveys in the vicinity of the site;

(2) using existing and newly acquired data to develop a geological conceptual model for the area that will be incorporated into static geocellular models and then used for dynamic simulation to assess CO2 injection and storage performance and long-term containment;

and (3) using varying injection and operational scenarios to model potential methods of improving reservoir storage efficiency.

The beneficiaries on the project include a variety of technical, research oriented and commercial stakeholders, as well as, nearby property owners and communities.

In addition, many federal, state, and local regulatory and environmental protection agencies are also beneficiaries to the project as they will use results of the data collection and modeling to further CCS safe, permanent commercial storage.
Funding Goals
THIS FUNDING OPPORTUNITY ANNOUNCEMENT (DE-FOA-0002711) WILL SUPPORT THE AVAILABILITY OF CARBON CAPTURE, UTILIZATION, AND STORAGE (CCUS) AND CARBON DIOXIDE REMOVAL (CDR) TO REACH CLIMATE GOALS BY BUILDING UPON THESE LEARNINGS TO TEST, MATURE, AND VALIDATE CCUS TECHNOLOGIES AT COMMERCIAL-SCALE. ONE ASPECT IS THE NEED TO IMPROVE PRACTICES REGARDING HOW TO EFFICIENTLY AND COST-EFFECTIVELY CHARACTERIZE AND PERMIT COMMERCIAL CARBON STORAGE PROJECT SITE(S) ENSURING THAT SECURE GEOLOGIC CARBON STORAGE IS AVAILABLE IN DIVERSE REGIONS AND SETTINGS THAT WILL SUPPORT LONGER TERM CARBON MANAGEMENT GOALS ACROSS THE US. THE CARBONSAFE INITIATIVE WAS LAUNCHED IN 2016.
Place of Performance
Urbana, Illinois 61801-3620 United States
Geographic Scope
Single Zip Code
Analysis Notes
Amendment Since initial award the End Date has been shortened from 09/30/26 to 10/10/25.
University Of Illinois was awarded Mt. Simon Sandstone Storage Project in Springfield, IL Cooperative Agreement DEFE0032340 worth $20,541,757 from the Office of Fossil Energy and Carbon Management in October 2024 with work to be completed primarily in Urbana Illinois United States. The grant has a duration of 1 year and was awarded through assistance program 81.089 Fossil Energy Research and Development. $5,150,508 (20.0%) of this Cooperative Agreement was funded by non-federal sources. The Cooperative Agreement was awarded through grant opportunity Bipartisan Infrastructure Law (BIL): Storage, Validation and Testing (Section 40305): Carbon Storage Assurance Facility Enterprise (CarbonSAFE): Phases III, III.5, and IV.

Status
(Complete)

Last Modified 11/3/25

Period of Performance
10/1/24
Start Date
10/10/25
End Date
100% Complete

Funding Split
$20.5M
Federal Obligation
$5.2M
Non-Federal Obligation
$25.7M
Total Obligated
80.0% Federal Funding
20.0% Non-Federal Funding

Activity Timeline

Interactive chart of timeline of amendments to DEFE0032340

Transaction History

Modifications to DEFE0032340

Additional Detail

Award ID FAIN
DEFE0032340
SAI Number
None
Award ID URI
SAI EXEMPT
Awardee Classifications
Public/State Controlled Institution Of Higher Education
Awarding Office
892433 NATIONAL ENERGY TECHNOLOGY LABORATORY
Funding Office
892404 FOSSIL ENERGY AND CARBON MANAGEMENT
Awardee UEI
Y8CWNJRCNN91
Awardee CAGE
4B808
Performance District
IL-13
Senators
Richard Durbin
Tammy Duckworth
Modified: 11/3/25