Description:
This agreement provides funding to City Utilities of Springfield, Missouri to implement its project to install a raw water main as directed in the 2022 Consolidated Appropriations Act or as identified in an approved technical correction if one has been approved for this project.
Activities:
The activities to be performed are installation of approximately 4600 feet of 48' ductile iron pipe in three (3) noncontiguous locations, 5 48' gate valves and 4 36' gate valves. This will complete the 12.25 miles of pipeline that will connect Fellows Lake to Blackman Water Treatment Plant (BWTP) with a second pipeline providing additional raw water conveyance capacity and redundancy to City Utilities' largest water treatment plant.
Subrecipient:
No subawards are included in this assistance agreement.
Outcomes:
The anticipated deliverables are a reduction in occurrence and severity of interruptions to access to safe and clean water in impacted communities, a reduction in energy use due to completion of a redundant line what will reduce head losses in the system resulting in reduced energy consumption for pumping source water to the treatment plant and provide a reliable source water supply for the customers of City Utilities in Springfield, Missouri.
This agreement provides funding to City Utilities of Springfield, Missouri to implement its project to install a raw water main as directed in the 2022 Consolidated Appropriations Act or as identified in an approved technical correction if one has been approved for this project.
Activities:
The activities to be performed are installation of approximately 4600 feet of 48' ductile iron pipe in three (3) noncontiguous locations, 5 48' gate valves and 4 36' gate valves. This will complete the 12.25 miles of pipeline that will connect Fellows Lake to Blackman Water Treatment Plant (BWTP) with a second pipeline providing additional raw water conveyance capacity and redundancy to City Utilities' largest water treatment plant.
Subrecipient:
No subawards are included in this assistance agreement.
Outcomes:
The anticipated deliverables are a reduction in occurrence and severity of interruptions to access to safe and clean water in impacted communities, a reduction in energy use due to completion of a redundant line what will reduce head losses in the system resulting in reduced energy consumption for pumping source water to the treatment plant and provide a reliable source water supply for the customers of City Utilities in Springfield, Missouri.
Awardee
Funding Goals
2 - TAKE DECISIVE ACTION TO ADVANCE ENVIRONMENTAL JUSTICE AND CIVIL RIGHTS 2.1 - PROMOTE ENVIRONMENTAL JUSTICE AND CIVIL RIGHTS AT THE FEDERAL, TRIBAL, STATE, AND LOCAL LEVELS 4 - ENSURE CLEAN AND HEALTHY AIR FOR ALL COMMUNITIES 4.1 - IMPROVE AIR QUALITY AND REDUCE LOCALIZED POLLUTION AND HEALTH IMPACTS S - CROSS AGENCY STRATEGY S.3 - ADVANCE EPA'S ORGANIZATIONAL EXCELLENCE AND WORKFORCE EQUITY 3 - GREATER CERTAINTY, COMPLIANCE, AND EFFECTIVENESS 3.3 - PRIORITIZE ROBUST SCIENCE 1 - TACKLE THE CLIMATE CRISIS 1.1 - REDUCE EMISSIONS THAT CAUSE CLIMATE CHANGE 5 - ENSURE CLEAN AND SAFE WATER FOR ALL COMMUNITIES 5.1 - ENSURE SAFE DRINKING WATER AND RELIABLE WATER INFRASTRUCTURE 6 - SAFEGUARD AND REVITALIZE COMMUNITIES 6.1 - CLEAN UP AND RESTORE LAND FOR PRODUCTIVE USES AND HEALTHY COMMUNITIES 5 - ENSURE CLEAN AND SAFE WATER FOR ALL COMMUNITIES 5.2 - PROTECT AND RESTORE WATERBODIES AND WATERSHEDS 5 - ENSURE CLEAN AND SAFE WATER FOR ALL COMMUNITIES 5.2 - PROTECT AND RESTORE WATERBODIES AND WATERSHEDS 5 - ENSURE CLEAN AND SAFE WATER FOR ALL COMMUNITIES 5.2 - PROTECT AND RESTORE WATERBODIES AND WATERSHEDS 5 - ENSURE CLEAN AND SAFE WATER FOR ALL COMMUNITIES 5.2 - PROTECT AND RESTORE WATERBODIES AND WATERSHEDS 5 - ENSURE CLEAN AND SAFE WATER FOR ALL COMMUNITIES 5.1 - ENSURE SAFE DRINKING WATER AND RELIABLE WATER INFRASTRUCTURE 5 - ENSURE CLEAN AND SAFE WATER FOR ALL COMMUNITIES 5.1 - ENSURE SAFE DRINKING WATER AND RELIABLE WATER INFRASTRUCTURE 5 - ENSURE CLEAN AND SAFE WATER FOR ALL COMMUNITIES 5.1 - ENSURE SAFE DRINKING WATER AND RELIABLE WATER INFRASTRUCTURE 3 - CLEANING UP COMMUNITIES AND ADVANCING SUSTAINABLE DEVELOPMENT 3.3 - RESTORE LAND 5 - ENSURE CLEAN AND SAFE WATER FOR ALL COMMUNITIES 5.1 - ENSURE SAFE DRINKING WATER AND RELIABLE WATER INFRASTRUCTURE 5 - ENSURE CLEAN
Grant Program (CFDA)
Awarding / Funding Agency
Place of Performance
Springfield,
Missouri
United States
Geographic Scope
City-Wide
Related Opportunity
EPA-CEP-01
Analysis Notes
Amendment Since initial award the End Date has been extended from 08/30/24 to 04/30/25.
City Utilities Of Springfield was awarded
Grant for Raw Water Main Installation in Springfield, MO
Cooperative Agreement 96710001
worth $3,500,000
from EPA Region 7: Kansas City in November 2023 with work to be completed primarily in Springfield Missouri United States.
The grant
has a duration of 1 year 5 months and
was awarded through assistance program 66.202 Congressionally Mandated Projects.
$875,000 (20.0%) of this Cooperative Agreement was funded by non-federal sources.
Status
(Complete)
Last Modified 2/6/25
Period of Performance
11/6/23
Start Date
4/30/25
End Date
Funding Split
$3.5M
Federal Obligation
$875.0K
Non-Federal Obligation
$4.4M
Total Obligated
Activity Timeline
Transaction History
Modifications to 96710001
Additional Detail
Award ID FAIN
96710001
SAI Number
None
Award ID URI
SAI EXEMPT
Awardee Classifications
City Or Township Government
Awarding Office
68HF07 REGION 7 (GRANTS OFFICE)
Funding Office
68W000 REGION 7 (FUNDING OFFICE)
Awardee UEI
X66BT3NHFMW8
Awardee CAGE
3KKJ1
Performance District
MO-07
Senators
Joshua Hawley
Eric Schmitt
Eric Schmitt
Budget Funding
Federal Account | Budget Subfunction | Object Class | Total | Percentage |
---|---|---|---|---|
State and Tribal Assistance Grants, Environmental Protection Agency (068-0103) | Pollution control and abatement | Grants, subsidies, and contributions (41.0) | $3,500,000 | 100% |
Modified: 2/6/25