96279626
Cooperative Agreement
Overview
Grant Description
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CITY OF HOBOKEN TO IMPLEMENT ITS PROJECT TO REPLACE FAILING WATER MAINS AND REMOVE LEAD SERVICE LINES AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT. HOBOKEN IMPLEMENTED A WATER INFRASTRUCTURE UPGRADE PROGRAM TO UPGRADE THE EXISTING WATER MAINS AT PRIORITIZED SEGMENTS TO MEET CURRENT REGULATORY STANDARDS OVER AN EXTENDED TIMEFRAME. PHASE III OF THE PROGRAM, WHICH IS THE SUBJECT OF COMMUNITY GRANT WORKPLAN, CONSISTS OF THREE DISCRETE LOCATIONS WITHIN THE CITY OF HOBOKEN: BLOOMFIELD STREET BETWEEN 5TH AND 6TH STREET, BLOOMFIELD STREET BETWEEN 11TH AND 13TH STREET, AND GARDEN STREET BETWEEN 5TH AND 9TH STREET. EXISTING 6-INCH DIAMETER WATER MAINS HAVE BEEN AND WILL CONTINUE TO BE INCREASED TO 8-INCH DIAMETER, AND EXISTING SERVICE LINES AND VALVE BOXES FROM THE DISTRIBUTION MAIN TO THE CURB STOP HAVE BEEN AND WILL CONTINUE TO BE UPGRADED AND REPLACED. IF ANY LEAD OR GALVANIZED SERVICE IS ENCOUNTERED DURING CONSTRUCTION, THE SERVICE LINE WILL BE REPLACED. IN ADDITION, THE WATER METERING PORTION OF THIS PROGRAM WILL INCLUDE REPLACEMENT OF EXISTING METERS AS WELL AS INSTALLATION OF ADVANCED METERING INFRASTRUCTURE (AMI) EQUIPMENT THROUGHOUT THE CITY, WHICH WILL ALLOW FOR AUTOMATIC METER READING.
ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A DRINKING WATER INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF WATER CONVEYANCE SYSTEM IMPROVEMENTS. THE PROGRAM INTENDS TO UPGRADE THE EXISTING WATER MAINS IN PRIORITIZED SEGMENTS TO MEET CURRENT REGULATORY STANDARDS AND IMPROVE WATER DISTRIBUTION TO RESIDENTS BY REDUCING WATER MAIN BREAKS AND REMOVING LEAD FROM DRINKING WATER IF ENCOUNTERED. IN ADDITION, A METERING PORTION OF THE PROGRAM INTENDS TO REPLACE EXISTING METERS ALLOWING FOR AUTOMATIC METER READING. THE PROJECT INCLUDES, BUT IS NOT NECESSARILY LIMITED TO, THE FOLLOWING:
- REPLACE ALL EXISTING 6-INCH DIAMETER WATER MAINS WITH NEW 8-INCH WATER MAINS.
- REPLACE SERVICE LINES FROM DISTRIBUTION MAIN TO THE CURB STOP.
- UPGRADE AND REPLACE VALVE BOXES FROM DISTRIBUTION MAIN TO THE CURB STOP.
- REPLACE LEAD OR GALVANIZED SERVICE LINES FROM THE CURB STOP TO THE WATER METER IF FOUND DURING CONSTRUCTION.
- OBTAIN RIGHT-OF-ENTRY'S (ROES) BEFORE SERVICE LINE REPLACEMENT FROM THE CURB STOP TO THE WATER METER, IF REQUIRED.
- REMOVAL AND PROPER LEGAL DISPOSAL OF LEAD SERVICE LINES, CONCRETE, ASPHALT, VEGETATION, EXCESS SOIL, AND OTHER SURPLUS WASTE AND MATERIALS IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL REQUIREMENTS.
SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THIS PROJECT WILL PROTECT THE HUMAN HEALTH AND INCREASE RESIDENTS' QUALITY OF LIFE BY IMPROVING WATER DISTRIBUTION TO RESIDENTS AND REDUCE WATER MAIN BREAKS THEREFORE GIVING RESIDENTS CONSISTENT ACCESS TO WATER, A HUMAN RIGHT. THIS PROJECT WILL ALSO IMPROVE THE WATER QUALITY IN THE ENTIRE POPULATION BY ENSURING THERE ARE NO LEAD SERVICE LINES IF ENCOUNTERED AND THEREFORE DECREASE THE AMOUNT OF ENVIRONMENTAL JUSTICE INDICATORS FOR POLLUTION AND SOURCES. THE REPLACEMENT OF THE WATER MAIN WILL ALSO AVOID EMERGENCY SHUTDOWNS AND POSSIBLE CONTAMINATION OF THE WATER DISTRIBUTION SYSTEM. THE PROJECT WILL ALSO ENSURE A LOWER NUMBER OF WATER MAIN REPLACEMENTS OCCUR PER YEAR MINIMIZING TEMPORARY IMPACTS TO RESIDENTS AND BUSINESSES.
THE INTENDED BENEFICIARIES INCLUDE ALL HOBOKEN RESIDENTS AND LOCAL BUSINESSES THAT OPERATE WITHIN THE CITY.
ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A DRINKING WATER INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF WATER CONVEYANCE SYSTEM IMPROVEMENTS. THE PROGRAM INTENDS TO UPGRADE THE EXISTING WATER MAINS IN PRIORITIZED SEGMENTS TO MEET CURRENT REGULATORY STANDARDS AND IMPROVE WATER DISTRIBUTION TO RESIDENTS BY REDUCING WATER MAIN BREAKS AND REMOVING LEAD FROM DRINKING WATER IF ENCOUNTERED. IN ADDITION, A METERING PORTION OF THE PROGRAM INTENDS TO REPLACE EXISTING METERS ALLOWING FOR AUTOMATIC METER READING. THE PROJECT INCLUDES, BUT IS NOT NECESSARILY LIMITED TO, THE FOLLOWING:
- REPLACE ALL EXISTING 6-INCH DIAMETER WATER MAINS WITH NEW 8-INCH WATER MAINS.
- REPLACE SERVICE LINES FROM DISTRIBUTION MAIN TO THE CURB STOP.
- UPGRADE AND REPLACE VALVE BOXES FROM DISTRIBUTION MAIN TO THE CURB STOP.
- REPLACE LEAD OR GALVANIZED SERVICE LINES FROM THE CURB STOP TO THE WATER METER IF FOUND DURING CONSTRUCTION.
- OBTAIN RIGHT-OF-ENTRY'S (ROES) BEFORE SERVICE LINE REPLACEMENT FROM THE CURB STOP TO THE WATER METER, IF REQUIRED.
- REMOVAL AND PROPER LEGAL DISPOSAL OF LEAD SERVICE LINES, CONCRETE, ASPHALT, VEGETATION, EXCESS SOIL, AND OTHER SURPLUS WASTE AND MATERIALS IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL REQUIREMENTS.
SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THIS PROJECT WILL PROTECT THE HUMAN HEALTH AND INCREASE RESIDENTS' QUALITY OF LIFE BY IMPROVING WATER DISTRIBUTION TO RESIDENTS AND REDUCE WATER MAIN BREAKS THEREFORE GIVING RESIDENTS CONSISTENT ACCESS TO WATER, A HUMAN RIGHT. THIS PROJECT WILL ALSO IMPROVE THE WATER QUALITY IN THE ENTIRE POPULATION BY ENSURING THERE ARE NO LEAD SERVICE LINES IF ENCOUNTERED AND THEREFORE DECREASE THE AMOUNT OF ENVIRONMENTAL JUSTICE INDICATORS FOR POLLUTION AND SOURCES. THE REPLACEMENT OF THE WATER MAIN WILL ALSO AVOID EMERGENCY SHUTDOWNS AND POSSIBLE CONTAMINATION OF THE WATER DISTRIBUTION SYSTEM. THE PROJECT WILL ALSO ENSURE A LOWER NUMBER OF WATER MAIN REPLACEMENTS OCCUR PER YEAR MINIMIZING TEMPORARY IMPACTS TO RESIDENTS AND BUSINESSES.
THE INTENDED BENEFICIARIES INCLUDE ALL HOBOKEN RESIDENTS AND LOCAL BUSINESSES THAT OPERATE WITHIN THE CITY.
Awardee
Funding Goals
5 - ENSURE CLEAN AND SAFE WATER FOR ALL COMMUNITIES 5.1 - ENSURE SAFE DRINKING WATER AND RELIABLE WATER INFRASTRUCTURE
Grant Program (CFDA)
Awarding / Funding Agency
Place of Performance
Hoboken,
New Jersey
07030
United States
Geographic Scope
Single Zip Code
Related Opportunity
EPA-CEP-01
City Of Hoboken was awarded
Hoboken Water Infrastructure Upgrade Program
Cooperative Agreement 96279626
worth $3,697,752
from EPA Region 2: New York City in August 2025 with work to be completed primarily in Hoboken New Jersey United States.
The grant
has a duration of 2 years and
was awarded through assistance program 66.202 Congressionally Mandated Projects.
$924,438 (20.0%) of this Cooperative Agreement was funded by non-federal sources.
Status
(Ongoing)
Last Modified 9/23/25
Period of Performance
8/1/25
Start Date
7/31/27
End Date
Funding Split
$3.7M
Federal Obligation
$924.4K
Non-Federal Obligation
$4.6M
Total Obligated
Activity Timeline
Additional Detail
Award ID FAIN
96279626
SAI Number
None
Award ID URI
SAI EXEMPT
Awardee Classifications
City Or Township Government
Awarding Office
68HF02 REGION 2 (GRANTS OFFICE)
Funding Office
68R000 REGION 2 (FUNDING OFFICE)
Awardee UEI
L9QRF6FA42H3
Awardee CAGE
5GSD0
Performance District
NJ-08
Senators
Robert Menendez
Cory Booker
Cory Booker