THE AWARD PURPOSE IS TO CONDUCT ENVIRONMENTAL REVIEW, PRELIMINARY ENGINEERING, FINAL DESIGN, AND CONSTRUCTION ACTIVITIES TO COMPLETE TRACK AND BRIDGE IMPROVEMENTS ON A SEGMENT OF RAIL OWNED AND OPERATED BY RAPID CITY, PIERRE EASTERN RAILROAD, INC. (RCP E). THE PROJECT WILL IMPROVE RAILROAD SAFETY, EFFICIENCY, CAPACITY, AND RELIABILITY ON A RAILWAY VITAL TO LOCAL ECONOMIC SUCCESS. ADDITIONALLY, THE PROJECT AIMS TO INCREASE THE COMPETITIVENESS OF RURAL COMMUNITIES IN EASTERN SOUTH DAKOTA WITHIN NATIONAL AND GLOBAL MARKETS. SPECIFICALLY, THE PROJECT WILL REPLACE THE REMAINING APPROXIMATELY 16.13 MILES OF RAIL ON THE PIERRE TO RAPID CITY, SOUTH DAKOTA (PRC) SUBDIVISION THAT HAVE NOT BEEN PREVIOUSLY UPGRADED. THE PROJECT WILL ALSO UPGRADE OR REPLACE APPROXIMATELY 34 BRIDGE STRUCTURES TO ACHIEVE GREATER TRACK WEIGHT CAPACITY, IMPROVE TURNOUTS, REHABILITATE CROSSINGS, IMPROVE BALLAST AND TRACK SURFACING, AND CONDUCT SHOULDER PROFILING. UPON COMPLETION, THE PROJECT WILL ENABLE THE RAILROAD TO ACCOMMODATE 286K RAILCAR LOAD CAPACITY WITHIN THE PROJECT LIMITS, IMPROVE RELIABILITY, REDUCE THE LIKELIHOOD OF TRACK-CAUSED DERAILMENTS, AND IMPROVE THE RAILROADS ABILITY TO WITHSTAND EXTREME WINTER WEATHER CONDITIONS.
Funding Goals
THE PROGRAM INVESTS IN A WIDE RANGE OF PROJECTS WITHIN THE UNITED STATES TO IMPROVE RAILROAD SAFETY AND EFFICIENCY AND RELIABILITY. MITIGATE CONGESTION AT BOTH INTERCITY PASSENGER AND FREIGHT RAIL CHOKEPOINTS TO SUPPORT MORE EFFICIENT TRAVEL AND GOODS MOVEMENT. ENHANCE MULTI MODAL CONNECTIONS AND LEAD TO NEW OR SUBSTANTIALLY IMPROVED INTERCITY PASSENGER RAIL TRANSPORTATION CORRIDORS. THIS PROGRAM INVESTS IN RAILROAD INFRASTRUCTURE PROJECTS THAT IMPROVE SAFETY AND SUPPORT ECONOMIC VITALITY INCLUDING THROUGH SMALL BUSINESSES AND CREATE GOOD PAYING JOBS WITH THE FREE AND FAIR CHOICE TO JOIN A UNION AND INCREASE CAPACITY AND SUPPLY CHAIN RESILIENCE AND APPLY INNOVATIVE TECHNOLOGY AND EXPLICITLY ADDRESS CLIMATE CHANGE AND GENDER EQUITY AND RACIAL EQUITY.
Place of Performance
South Dakota United States
Geographic Scope
State-Wide
South Dakota Department Of Transportation was awarded Rail Safety & Capacity Upgrade Project in Eastern SD Project Grant 69A36525422730CRSSD worth $14,062,328 from Federal Railroad Administration in August 2025 with work to be completed primarily in South Dakota United States. The grant has a duration of 3 years 8 months and was awarded through assistance program 20.325 Consolidated Rail Infrastructure and Safety Improvements. $6,026,712 (30.0%) of this Project Grant was funded by non-federal sources. The Project Grant was awarded through grant opportunity FY22-23 Special Transportation Circumstances Projects.

Status
(Ongoing)

Last Modified 9/23/25

Period of Performance
8/1/25
Start Date
4/30/29
End Date
4.0% Complete

Funding Split
$14.1M
Federal Obligation
$6.0M
Non-Federal Obligation
$20.1M
Total Obligated
70.0% Federal Funding
30.0% Non-Federal Funding

Activity Timeline

Interactive chart of timeline of amendments to 69A36525422730CRSSD

Additional Detail

Award ID FAIN
69A36525422730CRSSD
SAI Number
None
Award ID URI
None
Awardee Classifications
State Government
Awarding Office
69A365 OFFICE OF FUNDS ADMINISTRA (GRANTS)
Funding Office
69A365 OFFICE OF FUNDS ADMINISTRA (GRANTS)
Awardee UEI
LWAMCP81LP14
Awardee CAGE
4H2U7
Performance District
SD-00
Senators
John Thune
Mike Rounds
Modified: 9/23/25