The project includes the final design and construction to replace the existing copper circuit communication network with a fiber network and install closed-circuit television (CCTV) cameras and other station amenities at 5 stations along the New Haven Line (NHL) main line and the Cos Cob moveable bridge.
The project will provide security upgrades at multiple rail stations on the NHL Northeast Corridor (NEC) and establish network connectivity into the fiber-optic network at 60 locations including routing of fiber drops to node houses, control points, power stations, and motor operated disconnects between Greenwich and Stamford.
This project will increase safety and speeds, reduce intercity rail travel times, and improve service for all who travel on Connecticut's NEC.
The project will provide security upgrades at multiple rail stations on the NHL Northeast Corridor (NEC) and establish network connectivity into the fiber-optic network at 60 locations including routing of fiber drops to node houses, control points, power stations, and motor operated disconnects between Greenwich and Stamford.
This project will increase safety and speeds, reduce intercity rail travel times, and improve service for all who travel on Connecticut's NEC.
Grant Program (CFDA)
Awarding / Funding Agency
Place of Performance
Greater Bridgeport,
Connecticut
United States
Geographic Scope
County-Wide
Connecticut Department Of Transportation was awarded
Connecticut NEC Security and Connectivity Enhancement Project
Project Grant 69A36525420950FSPCT
worth $15,400,000
from Federal Railroad Administration in June 2025 with work to be completed primarily in Connecticut United States.
The grant
has a duration of 4 years 1 months and
was awarded through assistance program 20.326 Federal-State Partnership for State of Good Repair.
$3,850,000 (20.0%) of this Project Grant was funded by non-federal sources.
The Project Grant was awarded through grant opportunity FY22-23 Federal-State Partnership for Intercity Passenger Rail Grant Program for projects located on the Northeast Corridor.
Status
(Ongoing)
Last Modified 8/25/25
Period of Performance
6/1/25
Start Date
7/31/29
End Date
Funding Split
$15.4M
Federal Obligation
$3.9M
Non-Federal Obligation
$19.2M
Total Obligated
Activity Timeline
Additional Detail
Award ID FAIN
69A36525420950FSPCT
SAI Number
None
Award ID URI
None
Awardee Classifications
State Government
Awarding Office
69A365 OFFICE OF FUNDS ADMINISTRA (GRANTS)
Funding Office
69A365 OFFICE OF FUNDS ADMINISTRA (GRANTS)
Awardee UEI
EED8DPB3U7M8
Awardee CAGE
4LP61
Performance District
CT-04
Senators
Richard Blumenthal
Christopher Murphy
Christopher Murphy
Modified: 8/25/25