The project will improve the safety, efficiency, and reliability of passenger and freight traffic along the PNWRC, avoiding or minimizing service interruptions between MP 24.68 to MP 25.52 resulting from slope failures (landslides).

This project will: (1) build three catchment walls, totaling approximately 3,200 linear feet, to reduce the risk of slide debris reaching the tracks and (2) improves the alert system that notifies dispatchers and train crews of a possible track intrusion in the case that slide debris does reach the track.

Once completed, the project will improve PNWRC reliability, reduce maintenance costs, and improve safety for passenger and freight service.
Funding Goals
THE PROJECT WILL IMPROVE THE SAFETY, EFFICIENCY, AND RELIABILITY OF PASSENGER AND FREIGHT TRAFFIC ALONG THE PNWRC, AVOIDING OR MINIMIZING SERVICE INTERRUPTIONS BETWEEN MP 24.68 TO MP 25.52 RESULTING FROM SLOPE FAILURES (LANDSLIDES). THIS PROJECT WILL: (1) BUILD THREE CATCHMENT WALLS, TOTALING APPROXIMATELY 3,200 LINEAR FEET, TO REDUCE THE RISK OF SLIDE DEBRIS REACHING THE TRACKS AND (2) IMPROVES THE ALERT SYSTEM THAT NOTIFIES DISPATCHERS AND TRAIN CREWS OF A POSSIBLE TRACK INTRUSION IN THE CASE THAT SLIDE DEBRIS DOES REACH THE TRACK. ONCE COMPLETED, THE PROJECT WILL IMPROVE PNWRC RELIABILITY, REDUCE MAINTENANCE COSTS, AND IMPROVE SAFETY FOR PASSENGER AND FREIGHT SERVICE.
Place of Performance
Washington United States
Geographic Scope
State-Wide
Washington State Department Of Transportation was awarded PNWRC Slope Failure Mitigation Project Project Grant 69A36523420220CRSWA worth $3,719,000 from Federal Railroad Administration in September 2023 with work to be completed primarily in Washington United States. The grant has a duration of 3 years 3 months and was awarded through assistance program 20.325 Consolidated Rail Infrastructure and Safety Improvements. $3,719,000 (50.0%) of this Project Grant was funded by non-federal sources. The Project Grant was awarded through grant opportunity FY20 Consolidated Rail Infrastructure and Safety Improvements.

Status
(Ongoing)

Last Modified 10/2/23

Period of Performance
9/1/23
Start Date
12/31/26
End Date
71.0% Complete

Funding Split
$3.7M
Federal Obligation
$3.7M
Non-Federal Obligation
$7.4M
Total Obligated
50.0% Federal Funding
50.0% Non-Federal Funding

Activity Timeline

Interactive chart of timeline of amendments to 69A36523420220CRSWA

Additional Detail

Award ID FAIN
69A36523420220CRSWA
SAI Number
None
Award ID URI
None
Awardee Classifications
State Government
Awarding Office
69A365 OFFICE OF FUNDS ADMINISTRA (GRANTS)
Funding Office
69A365 OFFICE OF FUNDS ADMINISTRA (GRANTS)
Awardee UEI
FCT9KQ8L2574
Awardee CAGE
1RZW4
Performance District
WA-02
Senators
Maria Cantwell
Patty Murray

Budget Funding

Federal Account Budget Subfunction Object Class Total Percentage
Consolidated Rail Infrastructure and Safety Improvements Grants, Federal Railroad Administration, Transportation (069-2811) Ground transportation Grants, subsidies, and contributions (41.0) $3,719,000 100%