Project title: HON CNTY - Salt Lake Boulevard Widening, Phase 3B (CON)
Project description:
Widen Salt Lake Boulevard from Maluna Street to Ala Lilikoi Street from two to four lanes,
add median/left turn storage lane,
improve on-street parking, bike lanes, sidewalks, street lighting, traffic signals,
and install new stormwater drainage system.
Project description:
Widen Salt Lake Boulevard from Maluna Street to Ala Lilikoi Street from two to four lanes,
add median/left turn storage lane,
improve on-street parking, bike lanes, sidewalks, street lighting, traffic signals,
and install new stormwater drainage system.
Funding Goals
THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (PUB. L. 117-58, NOVEMBER 15, 2021, “BIPARTISAN INFRASTRUCTURE LAW,” OR “BIL”) AUTHORIZED AND
APPROPRIATED $1.5 BILLION ANNUALLY TO BE AWARDED BY THE DEPARTMENT OF TRANSPORTATION (“DOT”) 2022 – FY 2026 FOR LOCAL AND REGIONAL
PROJECT ASSISTANCE PROGRAM GRANTS UNDER NATIONAL INFRASTRUCTURE INVESTMENTS. THE PROGRAM IS CODIFIED AT 49 U.S.C. 6702.
THE BIL REQUIRES THE DOT TO PUBLISH A NOTICE OF FUNDING OPPORTUNITY (NOFO) NO LATER THAN 60 DAYS AFTER FUNDS ARE MADE AVAILABLE FOR THE
PROGRAM, WHICH FOR FY 2024 IS NOVEMBER 30, 2023. IN ORDER TO COMPLY WITH THIS REQUIREMENT, THIS NOFO SOLICITS APPLICATIONS FOR PROJECTS
TO BE FUNDED UNDER THE LOCAL AND REGIONAL PROJECT ASSISTANCE PROGRAM, KNOWN AS THE RAISE GRANTS PROGRAM.
IF THE FY 2024 APPROPRIATIONS ACT, OR OTHER SUBSEQUENT ACTS, PROVIDE ADDITIONAL FUNDING OR SIGNIFICANTLY ALTER REQUIREMENTS FOR THE RAISE
GRANT PROGRAM, THE DEPARTMENT WILL AMEND THIS NOTICE WITH GUIDANCE ON ADDITIONAL REQUIREMENTS.
Grant Program (CFDA)
Awarding Agency
Funding Agency
Place of Performance
Honolulu,
Hawaii
United States
Geographic Scope
County-Wide
Related Opportunity
The State Of Hawaii Department Of Transportation was awarded
Salt Lake Boulevard Widening: Enhancing Traffic Flow and Safety
Project Grant 693JJ22640000RA18HI7311005
worth $25,000,000
from the Office of the Secretary of Transportation in September 2026 with work to be completed primarily in Hawaii United States.
The grant
has a duration of 5 years 3 months and
was awarded through assistance program 20.933 National Infrastructure Investments.
$6,250,000 (20.0%) of this Project Grant was funded by non-federal sources.
The Project Grant was awarded through grant opportunity FY 2024 National Infrastructure Investments.
Status
(Ongoing)
Last Modified 9/21/26
Period of Performance
9/3/26
Start Date
12/4/31
End Date
Funding Split
$25.0M
Federal Obligation
$6.2M
Non-Federal Obligation
$31.2M
Total Obligated
Activity Timeline
Additional Detail
Award ID FAIN
693JJ22640000RA18HI7311005
SAI Number
693JJ22640000RA18HI731100500000301
Award ID URI
SAI EXEMPT
Awardee Classifications
State Government
Awarding Office
693JJ2 FHWA OFC OF THE CHIEF FIN OFFICER
Funding Office
69A345 OFF. UNDERSEC FOR POLICY, INT. AVIA
Awardee UEI
JKY3SX6QGC23
Awardee CAGE
43AF4
Performance District
HI-01
Senators
Mazie Hirono
Brian Schatz
Brian Schatz
Modified: 9/21/26